Sunrise Energy Metals Limited · ASX:SRL

Sunrise Energy Metals — Corporate Update (June 2025)

24 slides from Sunrise Energy Metals's corporate update, Jun 3, 2025

  1. Slide 1: Sunrise Project Community Consultative Committee

    Sunrise Project Community Consultative Committee 3 June 2025

  2. Slide 2: Contents

    Contents 1 2 Finance/Market Update Sunrise Project Update 3 Syerston Scandium Project 4 Community Update 5 Environmental Management Update 6 Environmental Approvals Update 7 CCC Member Questions 2 Powering innovation | June 25

  3. Slide 3: Finance/Market Update

    01 Finance/Market Update 3 Powering innovation | June 25

  4. Slide 4: Sunrise Project Update

    02 Sunrise Project Update 4 Powering innovation | June 25

  5. Slide 5: Major Project Status Renewed

    Major Project Status Renewed › The Sunrise Nickel-Cobalt-Scandium Project was granted Major Project Status (MPS) through the Federal Governments’ Major Projects Facilitation Agency (MPFA) in December 2021. This status provides the Sunrise Project with fast-tracked approvals at a federal level for a

  6. Slide 6: Mineral Exploration in the Region – Limestone

    Mineral Exploration in the Region – Limestone › Surface sampling and mapping undertaken at EL9627 (Hunters) and EL9598 (Gleninga South) › Resources Regulator conducted a desktop compliance audit of the Boona Gap tenement in March 2025: – Exploration code of practice: Community consultation › No non-

  7. Slide 7: Syerston Scandium Project

    03 Syerston Scandium Project 7 Powering innovation | June 25

  8. Slide 8: What is Scandium?

    What is Scandium? › Scandium is a chemical element with the symbol Sc and atomic number 21 › Scandium is used in a range of strategic technology markets, including high performance alloys, fuel cells and semiconductors 8 Powering innovation | June 25

  9. Slide 9: Syerston Scandium Project

    Syerston Scandium Project › The Syerston Scandium Project is comprised of multiple high-grade zones of scandium mineralisation that are hosted within the larger nickel-cobalt resource of the Sunrise Battery Materials Project › These zones could form the basis of a much smaller stand- alone mining an

  10. Slide 10: ML 1770 – Syerston Scandium Drilling

    ML 1770 – Syerston Scandium Drilling › 125 test holes approved by the Resources Regulator within ML 1770 › Drilling undertaken over three weeks • Targeting high grade scandium zones • Samples are being analysed at the lab • Drilling completed safely using local drilling contractor Resolution Drillin

  11. Slide 11: ML 1770 – Scandium Drilling

    ML 1770 – Scandium Drilling 11 Powering innovation | June 25

  12. Slide 12: Community Update

    04 Community Update 12 Powering innovation | June 25

  13. Slide 13: CCC Member Site Visit

    CCC Member Site Visit › Site visit held on 3 September 2024 for members of the CCC, particularly those that had not visited the site previously › SEM provided an induction and overview of the Project and an opportunity to ask questions › Members were shown around the site including the future proces

  14. Slide 14: Community – Working Together

    Community – Working Together › Community Events – Supported the Trundle Back in Time event on 15th March sponsoring the sheaf toss – Supported the 2024 agricultural shows – Tullamore, Trundle, Bedgerabong, Condobolin, Parkes & Forbes › Preparing to support the 2025 local agricultural shows › Attende

  15. Slide 15: Keeping People Informed

    Keeping People Informed › Community Communication – Parkes and Condobolin shopfronts are open, first and third Tuesday/Thursday of the month › Sunrise Energy Metals website – Complaints register published monthly, with zero complaints YTD – Community Complaints line listed on our website – 1800 952

  16. Slide 16: Environmental Management Update

    05 Environmental Management Update 16 Powering innovation | June 25

  17. Slide 17: Environmental Monitoring

    Environmental Monitoring › Continuing environmental monitoring: – Air Quality – Surface Water – Groundwater (June and December 2024) – Meteorological › Depositional dust and Particulate Matter (PM10 and PM2.5) › Surface water monitoring events – November and December 2024 › Groundwater monitoring –

  18. Slide 18: Environmental Approvals Update

    06 Environmental Approvals Update 18 Powering innovation | June 25

  19. Slide 19: Government Reporting

    Government Reporting › Annual project reporting completed for 2024: – Annual Return to the EPA – 2024 Annual Review to DPHI https://www.sunriseem.com/wp-content/uploads/2025/04/2024-Sunrise-Project-Annual- Review_FINAL.pdf 19 Powering innovation | June 25

  20. Slide 20: Critical Asset Approvals

    Critical Asset Approvals › 132kV Electrical Transmission Line (ETL) • Power systems studies completed to meet AEMO & Network Service Providers requirements • First 40km of the ETL will replace the ageing 66kV Trundle supply line with a new dual 132/66 kV line • This will provide additional network c

  21. Slide 21: Critical Asset Approvals

    Critical Asset Approvals › Raw Water Pipeline and Borefield • Licence and easement application over Crown Land progressing › Oversize Transport Route (Port Pirie to Sunrise) • Designs for required civil and electrical route modifications completed Q2 2024 • Approvals for civil route modifications to

  22. Slide 22: Government Contact/Correspondence

    Government Contact/Correspondence › Regional Growth NSW Development Corporation – Parkes Special Activation Precinct site visit › Dept Industry, Science & Resources – Major Projects Facilitation Agency – Major Project Status renewal › Dept Climate Change, Energy, the Environment & Water – Decommissi

  23. Slide 23: CCC Member Questions

    07 CCC Member Questions 23 Powering innovation | June 25

  24. Slide 24: Thank you

    Thank you 0. sunrise