Piedmont Lithium — Investor Presentation (August 2019)
28 slides from Piedmont Lithium's investor presentation, Aug 14, 2019
Slide 1: USA's Only Conventional Lithium Project Scoping Study Update – August 2019
USA’s Only Conventional Lithium Project Scoping Study Update – August 2019 ASX: PLL NASDAQ: PLL ABN 50 002 664 495
Slide 2: USA's Only Conventional Lithium Project
IDEAL LOCATION >50 years of lithium processing in North CarolinaAbundant infrastructure and lithium talent poolPure spodumene mineralogy on TSB EXCEPTIONAL ECONOMICS 25-year project lifeNPV of US$1.45B and IRR of 34%Steady-state EBITDA of US$298M NEAR-TERM CATALYSTS Permitting is well-advancedExplor
Slide 3: Phased Development to Minimize Equity Dilution
US$298 M(A$438 M)Run-rate EBITDA US$1.45 B(A$2.13 B)After-tax NPV 34%After-tax IRR 25Year Mine Life Updated Scoping Study Highlights Exceptional Economics PHASE ONE – 2021-2023Mine & Concentrator160,000 tpy 6% concentrate + by-product mineralsUS$168 M initial capexSteady-state annual EBITDA - $66 MP
Slide 4: Following in Kidman's Footsteps
Following in Kidman’s FootstepsWesfarmers Buying Kidman for US$520mm ASX:PLL; NASDAQ:PLL 4 Project KIDMAN PIEDMONT Location Western Australia North Carolina Business Model SC6-to-LiOH SC6-to-LiOH Annual Production 22,670 t 22,700 t Cash Production Cost1 US$4,885 / t US$3,105 / t Project Life 47 Year
Slide 5: Ideally Located in North Carolina
Ideally Located in North Carolina # 1State for BusinessForbes Magazine 0%State Mining Royalties 23%Corporate Tax Rate ~100%Historic Lithium Production ASX:PLL; NASDAQ:PLL 5
Slide 6: North Carolina Cost Advantage
North Carolina Cost Advantage Source: Public filings, Primero and Company estimates Location drives 1st quartile cost position NORTH CAROLINA WESTERN AUSTRALIA CANADA LABOR $42 / Hr $72 / Hr $96 / Hr ELECTRICITY 6c / kWh 17c / kWh 4c / kWh DIESEL $0.65 / L $1.02 / L $0.91 / L NATURAL GAS $4.00 / Gj
Slide 7: Projected to be the Industry's Lowest-Cost Producer
Projected to be the Industry’s Lowest-Cost Producer ASX:PLL; NASDAQ:PLL 7
Slide 8: Robust Economics in Varying Price / Cost Environments
Robust Economics in Varying Price / Cost Environments NPV > US$1B in Most ScenariosUS$1.45B in base caseUS$1.93B at 3-yr trailing pricesUS$932M at low case pricesCapex and Opex have modest NPV impactStrong Internal Rates ofReturn34% IRR using base case pricing28% IRR using low case prices ASX:PLL; N
Slide 9: Corporate Snapshot
Corporate Snapshot Piedmont Lithium Limited Shares / ADRs (1 ADR = 100 Shares) 1 815.4 mm 8.15 mm Price (@ 8/6/19) A$0.145 US$9.70 Market Cap 1 A$114 mm US$79 mm Cash (@ 6/30/19) 1 A$27.3 mm US$18.4 mm Key Shareholders Australian Super 13.2% Fidelity 9.1% Officers and Directors 9.7% Research Coverag
Slide 10: Piedmont Lithium Project
Piedmont Lithium Project PIEDMONT
Slide 11: High-Grade Mineral Resource
27.9 Mt @ 1.11% Li2O764,000 tonnes of contained LCE100% of the lithium is attributable to spodumene mineralizationShallow open pits – 74% of resource within 100m of surface and 97% within 150mOpen along strike and at depth – Phase 4 drillingongoing High-Grade Mineral ResourceOne of North America’s L
Slide 12: Vast Exploration Upside
Vast Exploration Upside “The pegmatite deposit in the Kings Mountain district in North Carolina is considered one of the three largest lithium bearing pegmatite deposits in the world together with the Manono deposit in the Democratic Republic of Congo and Greenbushes in Australia.” – Minerals Engine
Slide 13: Aggressive Land Consolidation Strategy
Initial Options415 Acres 2017903 Acres 20181,383 Acres Current 2,206 Acres Aggressive Land Consolidation StrategyNumerous Prospective Targets to Drive Resource and Mine Life ASX:PLL; NASDAQ:PLL 13
Slide 14: Exceptional Pure Spodumene Mineralogy
Exceptional Pure Spodumene Mineralogy “The first question an investor should ask of a hard-rock lithium CEO is “how much of the lithium reports tospodumene?” – Jon Hykawy , PhD –President, Stormcrow Capital XRD analysis confirms pure spodumenenature of Piedmont’s ore bodyAbsence of petalite and lepi
Slide 15: Strong Metallurgical Recoveries
Strong Metallurgical Recoveries Resource Grade Recovered Grade Competitive Resource Grade…1.11% Resource Grade …and Positive Met Recoveries…85% recoveries…based on testing at SGS and North Carolina precedent…and supported by pure spodumene mineralogy …Lead to Strong Recovered GradeDriving exceptiona
Slide 16: By-Product Credits Reduce LiOH Costs By ~$750/t
By-Product Credits Reduce LiOH Costs By ~$750/t By-products were a large business for past lithium producers in NC Strong local markets for quartz, feldsparand micaImports represent large market share due to US mine depletions Initial offtake conversations underwaywith leading market participants By
Slide 17: Highly-Experienced Project Team
Technical Consultants Scoping Study Lead(Australia & Canada) Resource Geology(Australia & Canada) Metallurgy(Canada) Permitting(North Carolina) Mine Planning(Virginia) Analytical Testwork(North Carolina) Analytical Test Work(Colorado) Blast Studies(North Carolina) Highly-Experienced Project Team Man
Slide 18: Superior Profitability Index
Superior Profitability Index Profitability Index Measures NPV vs.Initial Capex 0.500.00 ASX:PLL; NASDAQ:PLL 18 1.00 1.50 2.00 3.002.50 Piedmont Trilogy Sabina Corvus Osisko Clean TeQ GeneralMoly Midas Vista Western Seabridge Northern Polymet Copper Dynasty Piedmont Trilogy Sabina Corvus Osisko Clean
Slide 19: Substantial Improvements vs. Prior Scoping Study
Substantial Improvements vs. Prior Scoping Study Resource expansion drives 90% longer mine life and 60% higher NPV ASX:PLL; NASDAQ:PLL 19
Slide 20: Scoping Study Summary
Scoping Study Summary ASX:PLL; NASDAQ:PLL 20
Slide 21: Lithium Markets
Lithium Markets PIEDMONT
Slide 22: Strong EV Demand Expected to Lead to Lithium Shortages
Strong EV Demand Expected to Lead to Lithium Shortages“We are increasingly positive on the long-run pricing environment.” – Livent CEO ASX:PLL; NASDAQ:PLL 22
Slide 23: The American Mineral Security Act
The American Mineral Security Act “I think It’s Really Important for our National Security” US Rep Patrick McHenry (NC 10) “Our nation’s mineral security is a significant, urgent, and often ignored challenge…our reliance on China and other nations for critical minerals costs us jobs…and leaves us at
Slide 24: Purchase Price Parity Rapidly Approaching
Purchase Price Parity Rapidly Approaching $60,580 $41,000 $27,250 $17,750 $14,800 $22,680 $23,070 $22,845 $24,713 $25,578 $0 $10,000 $20,000 $30,000 $40,000 $50,000 $60,000 $70,000 2013 2016 2019 2022 2025 MSRP 200 Mile Range EV Price Parity 200 Mile Range EV Price Toyota Camry MSRP ASX:PLL; NASDAQ:
Slide 25: Supply Growth Consistently Over-Estimated
ASX:PLL; NASDAQ:PLL Supply Growth Consistently Over-Estimated 25 Source: Orocobre Limited 0 40 80 120 160 Promised Completed Promised v. CompletedHydroxide Expansions 2018 (kt) Incumbents accounted for 86% of new capacity 7% 25% 62% 23% 0% 25% 50% 75% 100% Chinese independent converter Chinese integ
Slide 26: Roskill Price Projections
Roskill Price Projections ASX:PLL; NASDAQ:PLL 26
Slide 27: Disclaimers Cautionary Statements and Important Information
Disclaimers Cautionary Statements and Important InformationThis presentation does not constitute or form part of any offer to sell, or solicitation of any offer to buy, any securities in the United States or any other country. This presentation may not form the basis of any contract or commitment wh
Slide 28: Piedmont Lithium Limited
Piedmont Lithium Limited America’s Only Conventional Lithium ProjectScoping Study Update – August 2019Keith D. Phillips – President and CEO+1 973 809 [email protected] Head Office 28 West 44th Street |Suite 810 | New York | NY 10036 | USAExploration Office 5706 Dallas-Cherryville Hwy
Piedmont Lithium — Investor Presentation (August 2019) on 6ix