Cloud Peak Energy Inc

Cloud Peak Energy — Shareholder Meeting (May 2018)

21 slides from Cloud Peak Energy's shareholder meeting presentation, May 9, 2018

  1. Slide 1: Cautionary Note Regarding Forward-Looking Statements

    Cautionary Note Regarding Forward-Looking Statements This presentation contains “forward-looking statements” within the meaning of the safe harbor provisions of Section 27A of the Securities Act of 1933 and Section 21E of the Securities Exchange Act of 1934. Forward-looking statements are not statem

  2. Slide 2: Cautionary Note Regarding Forward-Looking Statements

    Cautionary Note Regarding Forward-Looking Statements This presentation contains “forward-looking statements” within the meaning of the safe harbor provisions of Section 27A of the Securities Act of 1933 and Section 21 of the Securities Exchange Act of 1934, Forward-looking statements are not stateme

  3. Slide 3: Company and Financial Overview

    One of the largest U.S. coal producers and only PRB pure-play coal company 2017 coal shipments from our three mines of 57.4 million tons 2017 proven and probable reserves of 1.0 billion tons Approval received for LBM of approximately 14 million tons at Antelope Mine Extensive NPRB projects and optio

  4. Slide 4: Good Safety Record = Well-Run Operations

    Good Safety Record = Well-Run Operations Source: Mine Safety and Health Administration Note: All Injury Frequency Rate = (total number of employee injuries x 200,000) / total man-hours. 5 Top Coal Producing Companies – 2016 All Injury Frequency Rates (MSHA) Cloud Peak Energy 2017 – 0.17 Cloud Peak E

  5. Slide 5: Domestic Coal Environment Conditions and Regulations

    Domestic Coal Environment Conditions and Regulations 6

  6. Slide 6: Domestic Environment and Regulatory

    Domestic Environment Colder weather during Q1 2018 reduced customer coal inventories. PRB stockpiles at utilities are estimated at 66 million tons at end of March 2018. (1) Regulatory Trump Administration – the short-term impact is positive. Longer-term impact less certain. Recent 45Q carbon capture

  7. Slide 7: High Quality Customer Base

    High Quality Customer Base U.S. Coal Consumption by Region in 2017 8

  8. Slide 8: Natural Gas Storage and Pricing

    Natural Gas Storage and Pricing Natural Gas Storage Domestic production and demand are forecast to increase this year along with exports. Storage levels were down 41% from last year. Natural Gas Pricing and Rig Count Weather remains the primary pricing driver. Rig count levels remain steady near 190

  9. Slide 9: Powder River Basin

    10 Powder River Basin 41% 59% 31% 69% Source: MSHA 2008 - 2016 and Company Estimates 2017 SPRB Production Volatility Production rebounded 17 million tons in 2017 over 2016. Higher natural gas prices. More normal weather. Increasing consumption. 2018 volumes are expected to be lower, primarily driven

  10. Slide 10: CPE Forward Sales Position

    11 CPE Forward Sales Position 2018 has 47 million tons committed and fixed at weighted-average price of $12.28/ton. The 47 million tons committed includes 3.3 million export tons. 5 million tons of domestic sales needed to meet the midpoint of our production guidance range. 2019 has 17 million tons

  11. Slide 11: CPE Forward Sales Position

    CPE Forward Sales Position Total Committed Tons (as of 4/24/18) 60 50 Fy = Committed tons with variable pricing 0 ™ Committed tons with fixed pricing 2018 2019 ™ 2018 has 47 million tons committed and fixed at weighted-average price of $12.28/ton. ™ The 47 million tons committed includes 3.3 million

  12. Slide 12: Export Demand

    13 Export Demand Asian seaborne demand increased by 40 million metric tons in 2017. Over the next 5 years, new coal-fired generation in Asia, outside of China, is forecast to grow by 23 Gigawatts. This generation growth is expected to increase seaborne thermal coal demand by 20 to 25 million metric

  13. Slide 13: Export Drivers are Cyclical

    14 Through March 2018, Chinese total electric generation increased by 10%, largely supported by coal. Total Chinese thermal imports were up 40% through February 2018. Newcastle prompt month spot prices declined during the quarter and have recently risen above $100 per tonne. We are expecting to expo

  14. Slide 14: Spring Creek Export Quality and Rail Haul Advantage

    15 Spring Creek Export Quality and Rail Haul Advantage Source: SNL, Wood Mackenzie, Company estimates 4770-4850 4544 In decline Average Higher Quality Product Location Closer to the West Coast export terminals than SPRB mines Quality Spring Creek Mine is a premium subbituminous coal Indonesian coal

  15. Slide 15: Cloud Peak Energy-JERA Trading Agreement

    16 Cloud Peak Energy-JERA Trading Agreement Export coal supply agreement with JERA Trading Shipments are expected to commence as early as the end of 2019 and continue for up to forty months, reaching up to 1.3 million tons in the final contract year. Cloud Peak Energy Export Capacity Position Back-t

  16. Slide 16: Cloud Peak Energy-JERA Trading Agreement

    Cloud Peak Energy-JERA Trading Agreement Export coal supply agreement with JERA Trading = Shipments are expected to commence as early as the end of 2019 and continue for up to forty months, reaching up to 1.3 million tons in the final contract year. Cloud Peak Energy Export Capacity Position . Back-

  17. Slide 17: Spring Creek Complex High Btu Coal Resources

    18 Spring Creek Complex High Btu Coal Resources For Domestic and Export Customers No new federal coal LBAs have been issued in the PRB since 2012. The process to obtain, permit and develop new LBA reserves has recently taken 7-10 years. Currently leased 8800 Btu coal reserves in the PRB are expected

  18. Slide 18: Spring Creek Complex Potential Development Options

    19 Spring Creek Complex Potential Development Options (1) Non-reserve coal deposits are not reserves under SEC Industry Guide 7. Estimates of non-reserve coal deposits are subject to further exploration and development, are more speculative, and may not be converted to future reserves of the company

  19. Slide 19: Youngs Creek Mine

    Youngs Creek Mine 20 Open boxcut to provide test burn coal Potential timing of first coal - early 2019 Provide up to ~1 million tons per year Haul coal east to the highway using contracted trucks Permitting expected to be completed by late 2018 CPE Presentation CONFIDENTIAL Development Focus

  20. Slide 20: Annual Stockholders Meeting May 9, 2018

    Annual Stockholders Meeting May 9, 2018

  21. Slide 21: Annual Stockholders Meeting

    ANNUAL STOCKHOLDERS MEETING i) May 9, 2018 Latches

Cloud Peak Energy — Shareholder Meeting (May 2018) on 6ix