VAALCO Energy, Inc. · NYSE:EGY
VAALCO Energy — Shareholder Meeting (June 2007)
22 slides from VAALCO Energy's shareholder meeting presentation, June 2007
Slide 1: Annual Shareholders Meeting June 2007
VAALCO Energy, Inc. VAALCO Energy, Inc. Annual Shareholders Meeting June 2007
Slide 2: Safe Harbor Statement
VAALCO Energy, Inc. Safe Harbor Statement This presentation includes “forward-looking statements” within the meaning of Section 27A of the Securities Act of 1933, as amended, and Section 21E of the Securities Exchange Act of 1934, as amended. All statements other than statements of historical facts
Slide 3: Interests in Africa
VAALCO Energy, Inc. Interests in Africa
Slide 4: Gabon: Etame Permit Overview
VAALCO Energy, Inc. Gabon: Etame Permit Overview • Etame Area – VAALCO Share 28.07%, operator – Four wells, 14,000 BOE/day • Avouma Area – Platform in place, drilling completed – Production commenced in Jan. 07 – Two wells currently producing 6,500 BOE/day combined – 10,000 –12,000 BOE/day potential
Slide 5: Etame Field-Producing Wells
VAALCO Energy, Inc. Etame Field-Producing Wells
Slide 6: Etame Production-Sub Sea Completions
VAALCO Energy, Inc. Etame Production-Sub Sea Completions
Slide 7: Avouma Producing Wells
VAALCO Energy, Inc. Avouma Producing Wells • Exploration well completed August 2004 • 36 ft. of pay in Gamba sandstone Avouma Platform • Production commenced in January of 2007 • 2 wells currently on production • Production approximately 6,500 bbls. per day (combined from two wells)
Slide 8: Avouma Platform
VAALCO Energy, Inc. Avouma Platform • Three well slots (two currently drilled) • Electric submersible pumps to transfer oil to FPSO • $110 million capital project • VAALCO cost was $31 million
Slide 9: Ebouri Discovery
VAALCO Energy, Inc. Ebouri Discovery • Exploration well completed January 2004 • Logged 48 ft. of pay in Gamba sandstone • Platform under construction in Texas • First production 3rd quarter of 2008 • Estimated initial production 4,000 barrels per day
Slide 10: Prospects & Leads – Etame
VAALCO Energy, Inc. Prospects & Leads – Etame Lead M Lead J Lead A
Slide 11: Etame Production-FPSO
VAALCO Energy, Inc. Etame Production-FPSO • 1.1 million barrel capacity • 61 liftings through May 2007 • 28.7 million barrels sold to date • Engineering study underway to increase capacity
Slide 12: Gabon Operations
VAALCO Energy, Inc. VAALCO Gabon Operations
Slide 13: Gabon: Mutamba Overview
VAALCO Energy, Inc. Gabon: Mutamba Overview • Permit Area 1,094 sq kms, 270,327 acres • Rabi Pipeline runs within SW edge of permit • Aero magnetic & gravity survey Rabi Kounga Field • Shallow objectives (3,500 ft.) EUR 1.1 Billlion BO • Ten leads being investigated Gamba Field EUR 290 MMBO
Slide 14: Mutamba
VAALCO Energy, Inc. Mutamba • World class source and reservoir rocks • Shallow objectives (3,500 ft) • Geophysical challenges present opportunity – Last well drilled in 2000 – New geophysical software upgrading 2D – Aero magnetic survey June 2007 • Ten leads being examined
Slide 15: Angola
VAALCO Energy, Inc. Angola • 40% operated interest in Block 5, four-year permit off SW Angola effective 12/1/06 • Approximately 1.4 million acres • Sonangol estimates 50 million proven barrels with possible 500 million barrels • 12 wells • 7 dry wells • 5 reported oil and/or oil shows
Slide 16: Block Prospectivity
VAALCO Energy, Inc. Block 5 Prospectivity (ongoing VAALCO assessment) Block 5 ANGOLA ATLANTIC OCEAN 2000 3D outline 1997 3D outline
Slide 17: VAALCO – Financial Results
VAALCO Energy, Inc. VAALCO – Financial Results Net Income Revenues (millions) 45.0 100.0 40.0 90.0 35.0 80.0 70.0 30.0 60.0 25.0 98.3 40.3 50.0 20.0 84.9 40.0 29.2 15.0 56.5 22.9 30.0 10.0 35.5 20.0 8.9 5.0 10.0 9.4 0.5 0.0 0.0 2002 2003 2004 2005 2006 2002 2003 2004 2005 2006
Slide 18: New Ventures
VAALCO Energy, Inc. New Ventures • North Sea • Corporate opportunities • Possible purchase of properties within VAALCO’s area of operations
Slide 19: 2007 - 2008 Planned Budget
VAALCO Energy, Inc. 2007 - 2008 Planned Budget Etame, Mutamba and Angola Block 5 Gross VAALCO Net Item $MM $MM Ebouri Platform/Facilities $ 63.0 $ 19.1 One Well $ 18.0 $ 5.5 Subtotal Ebouri (2007/2008) $ 81.0 $ 24.6 FPSO Modifications $ 10.0 $ 3.0 Seismic $ 15.0 $ 6.0 Five Exploration Wells $ 45.0 $
Slide 20: VAALCO Today
VAALCO Energy, Inc. VAALCO Today • Net Reserves as of 1/1/07 * 6.0 million BOE • Avg. daily production rate (net) * 4,800 BOE • 1Q07 Avg. Price/Barrel $57.07 • Cash in bank at 5/31/07 $70 million • 2007-2008 Capital Expenditures ** $56.6 million * Barrels of oil equivalent (BOE), net to VAALCO ** Ne
Slide 21: Etame Permit: VAALCO In House Reserve Estimates
VAALCO Energy, Inc. Etame Permit: VAALCO In House Reserve Estimates Gross Reserves Remaining VAALCO Net After Royalty (MMBO Recoverable) (MMBO Recoverable) Producing: Etame Field 25.8 6.3 Avouma/S Tchibala 10.1 2.5 Under Development: Ebouri 8.1 2.0 TOTAL Developed/Undeveloped 44.0 10.8 Exploration L
Slide 22: VAALCO Energy, Inc.
VAALCO Energy, Inc.