NuStar Energy LP

NuStar Energy LP — 2019 Citi One-on-One Midstream/Energy Infrastructure Conference

41 slides from NuStar Energy LP's conference presentation, Aug 14, 2019

  1. Slide 1: 2019 Citi One-on-One Midstream/Energy Infrastructure Conference

    Slide 1: 2019 Citi One-on-One Midstream/Energy Infrastructure Conference

    2019 Citi One-on-One Midstream/Energy Infrastructure Conference August 14 –15, 2019

  2. Slide 2: Forward-Looking Statements

    Slide 2: Forward-Looking Statements

    Forward-Looking Statements Statements contained in this presentation other than statements of historical fact are forward-looking statements. While these forward-looking statements, and any assumptions upon which they are based, are made in good faith and reflect our current judgment regarding the d

  3. Slide 3: The Permian Basin: Phenomenal Growth Driving Midstream Opportunities

    Slide 3: The Permian Basin: Phenomenal Growth Driving Midstream Opportunities

    The Permian Basin: PhenomenalIntroduction Growth Driving Midstream Opportunities

  4. Slide 4: Foundation We Established in 2018: Strong Build This Year

    Slide 4: Foundation We Established in 2018: Strong Build This Year

    FoundationWe Established in2018 This Year,We Have Continued toon theStrongBuild 2. Average2. daily volume quarterfor ended June 30, 2019 As 1. of August 12, 2019 Governance Transparent Lower Debt EBITDA NYSE: NS Strong Coverage - • • • • • • • • • • • to Storage Throughput Volumes(2): 396MBPD Storag

  5. Slide 5: NuStar's Second Quarter 2019 Results Illustrate Our Progress and Growth

    Slide 5: NuStar's Second Quarter 2019 Results Illustrate Our Progress and Growth

    NuStar’s Second Quarter 2019 Results Illustrate Our Progress and Growth Q2 Q2 2018 2019 Pipeline Adjusted DCF Q2’18 Throughputs EBITDA Q2’19 Debt-to- Debt-to- EBITDA EBITDA 4.72X 3.95X 1 - Please see Appendix for reconciliations of non-GAAP financial measures to their most directly comparable GAAP m

  6. Slide 6: Much of NuStar's Growth Has Emerged From Strong Shale Production

    Slide 6: Much of NuStar's Growth Has Emerged From Strong Shale Production

    Much of NuStar’s Growth Has Emerged From Opportunities Driven by Continued Strong Shale Production Growth AP Master 8-12-19 6

  7. Slide 7: Recent Divestitures Had a Substantial Positive Impact on Financial Strength

    Slide 7: Recent Divestitures Had a Substantial Positive Impact on Financial Strength

    Our Recent Divestitures Have Had a Substantial Positive Impact on Our Financial Strength, and the St. Eustatius Sale Provided Benefits Even Beyond Our Balance Sheet Q4 2018 Over Q3 2019 Sale of Sale of St. Eustatius $500,000,000 UK/Europe Operations Operations in Nine Months In July, we closed on th

  8. Slide 8: Improved Expected Full-Year 2019 Coverage and Leverage

    Slide 8: Improved Expected Full-Year 2019 Coverage and Leverage

    We Have Improved Our Expected Full-Year 2019 Coverage and Leverage, While Keeping Our 2019 Strategic Capital Spending Range Steady Prior Revised 2019 DCF COVERAGE 1.2-1.3X 1.3-1.4X 2019 Debt-to-EBITDA ~4.3X ~4.1X 2019 Strategic Capital $500-550MM $500-550MM 2019 Reliability Capital $70-90MM $60-80MM

  9. Slide 9: 2019 Capital Project Program Update

    Slide 9: 2019 Capital Project Program Update

    2019 Capital Project Program Update

  10. Slide 10: Expect to Spend $500-550MM This Year on Capital Spending Program

    Slide 10: Expect to Spend $500-550MM This Year on Capital Spending Program

    We Continue to Expect to Spend $500-550MM This Year to Execute on Our 2019 Capital Spending Program Our 2019 project program is primarily devoted to spending for: Shale Production Growth Projects Across Texas: • Permian Crude System build out- ~$175MM • South Texas/Corpus export project-~$105MM • Pr

  11. Slide 11: Expanding and Connecting Our Permian Crude System

    Slide 11: Expanding and Connecting Our Permian Crude System

    Texas Shale Pipeline + Export Projects: We Are Continuing to EXPAND and CONNECT Our Permian Crude System- to New Wells and to Third-Party Pipelines- in Step With Our Customers’ Needs • Storage: 1,000,000 BBLs • Pipeline: 870 Miles PAA SUNRISE II • Dedicated Acreage: 500,000 Acres • AMI: 5,000,000 Ac

  12. Slide 12: Permian Crude System Receipts and EBITDA Continue to Grow Rapidly

    Slide 12: Permian Crude System Receipts and EBITDA Continue to Grow Rapidly

    Texas Shale Pipeline + Export Projects: Our Permian Crude System’s Receipts and EBITDA Continue to Grow Rapidly We are currently moving nearly 400MBPD 370 400 $35 349 NuStar’s Permian 327 350 314 $30 Crude System Performance (by Quarter) 300 266 $25 250 211 $20 187 200 159 $15 139 $31 $27 $27 150 $2

  13. Slide 13: Permian Basin's Resiliency and Efficiency Should Drive Strong Growth

    Slide 13: Permian Basin's Resiliency and Efficiency Should Drive Strong Growth

    Texas Shale Pipeline + Export Projects : The Permian Basin’s Resiliency and Efficiency Should Drive Strong Growth, for the Rest of 2019 and Beyond Geopolitical factors have 2019-2020 Pricing Forecasts $70.00 and continue to drive $65.00 volatility in forecasted oil $60.00 prices $55.00 $50.00 Despit

  14. Slide 14: South Texas Crude System and Corpus Export Assets' Utilization Has Grown

    Slide 14: South Texas Crude System and Corpus Export Assets' Utilization Has Grown

    Texas Shale Pipeline + Export Projects: Our South Texas Crude System and Corpus Export Assets’ Utilization Has Grown, and We Expect Throughput to Grow, For Both Permian WTI and Eagle Ford Barrels We are currently seeing pipeline receipts around 180MBPD on our South Texas Crude System, composed of ba

  15. Slide 15: South Texas Crude System Utilization Improves Near 2015 Levels

    Slide 15: South Texas Crude System Utilization Improves Near 2015 Levels

    Texas Shale Pipeline + Export Projects: We Have Seen Our South Texas Crude System Utilization Improve to Near 2015 Levels We expect receipts and EBITDA to continue to rise in the second half of 2019 and into 2020 as we see benefit from our Corpus export expansion project and other connections NuStar

  16. Slide 16: Transporting Permian Barrels From Connection With Plains' Sunrise II Pipeline

    Slide 16: Transporting Permian Barrels From Connection With Plains' Sunrise II Pipeline

    Texas Shale Pipeline + Export Projects: We Are Now Transporting Permian Barrels From a Connection With Plains’ Sunrise II Pipeline We provide our customer with optionality to supply the Ardmore and McKee refineries with Permian barrels from Plains’ Sunrise II expansion  Service to Ardmore – ~85MBPD

  17. Slide 17: Corpus Facility Handling the Leading Edge of Permian Long-haul Barrels

    Slide 17: Corpus Facility Handling the Leading Edge of Permian Long-haul Barrels

    Texas Shale Pipeline + Export Projects: NuStar’s Corpus Facility is Now Handling the Leading Edge of the Impending Wave of Permian Long-haul Barrels 100 Series NuStar’s Corpus Export Facility 1.0MMbbl 400 Series 200 Series 1.7MMbbl 0.6MMbbl +0.4MMbbl Remaining Footprint +0.6MMbbl Under Construction

  18. Slide 18: Our Project for Trafigura Expands Gulf Coast Export Ability

    Slide 18: Our Project for Trafigura Expands Gulf Coast Export Ability

    Texas Shale Pipeline + Export Projects: Our Project for Trafigura Utilizes Our Existing Assets and Expands Our Ability to Facilitate Growing Gulf Coast Exports Trafigura’s four-year commitment to transport and store WTI on our South Texas System and our Corpus facility will support two projects:  O

  19. Slide 19: Northern Mexico Refined Products Supply

    Slide 19: Northern Mexico Refined Products Supply

    Northern Mexico Refined Products Supply: Mexico’s Refined Product Demand is Expected to Continue to Exceed Its Infrastructure’s Capacity 1,200 Mexico refineries currently operate around 30% of 1,155 1,064 nameplate capacity due to weak returns and historical 1,000 933 976 under-investment 935 800 Wi

  20. Slide 20: Beyond 2019: Increased EBITDA + Decreased Capital Spending

    Slide 20: Beyond 2019: Increased EBITDA + Decreased Capital Spending

    TheBeyond Permian 2019: Basin: Increased EBITDA + PhenomenalDecreased Capital Growth Spending Driving Midstream Opportunities AP Master 8-12-19

  21. Slide 21: In 2020 We Expect a Significant Ramp-Down in Spending

    Slide 21: In 2020 We Expect a Significant Ramp-Down in Spending

    In 2020, With Our 2019 Capital Projects Complete, We Expect a Significant Ramp-Down in Spending We intend to focus on low-spend, low-multiple projects to enhance our existing footprint to take advantage of market opportunities, including St. James and on the West Coast West Coast Biofuel St. James 2

  22. Slide 22: Shale Production Growth Has Reversed Crude Flows to St. James, LA

    Slide 22: Shale Production Growth Has Reversed Crude Flows to St. James, LA

    North American Shale Play Production Growth has Reversed Crude Flows, Which is Now Driving Additional Shale Crude to St. James, LA As rapid growth in U.S. shale production has allowed refiners to replace much of crude imports with domestic crude, imports from outside the U.S. through St. James have

  23. Slide 23: St. James Terminal Capacity, Connectivity and Expandability

    Slide 23: St. James Terminal Capacity, Connectivity and Expandability

    Our St. James Terminal has the Capacity, Connectivity and Potential Expandability to Take Maximum Advantage of Changing Regional Crude Flows as They Develop We have executed contracts for 20MBPD and expect over 30MBPD per month for unit train off-loading driven by favorable price differentials of WT

  24. Slide 24: Continue to Develop Bio-Fuels Logistics Projects for Customers

    Slide 24: Continue to Develop Bio-Fuels Logistics Projects for Customers

    We Will Continue to Develop Bio-Fuels Logistics Projects for Our Customers to Address Market Dislocations Driven by Aggressive Carbon Emissions Reduction Goals in West Coast States Regulatory priorities on the West Coast are dramatically increasing demand for biofuels, which require import Tacoma an

  25. Slide 25: 2019 Project Completion for Continued Growth

    Slide 25: 2019 Project Completion for Continued Growth

    2019 Project Completion for ContinuedSteady Future Improvement: Growth Our 2019 Plan AP Master 8-12-19

  26. Slide 26: Focus on Completing Our 2019 Project Program

    Slide 26: Focus on Completing Our 2019 Project Program

    In the Meantime, We Continue to Focus on Completing Our 2019 Project Program to Generate Solid, Consistent Growth, as Demonstrated by Our Second Quarter Results… Project execution 2019 Projects List:  Selby Renewable Diesel  Stockton Biodiesel  Permian (Co City)/Sunrise Connection Financial  Mid

  27. Slide 27: Safe, Responsible and Efficient Operations Are NuStar's #1 Priority

    Slide 27: Safe, Responsible and Efficient Operations Are NuStar's #1 Priority

    …We Will Continue to Make Safe, Responsible and Efficient Operations NuStar’s #1 Priority… Our safety statistics reflect our commitment to safe, responsible operations  In 2018, as in years past, our safety statistics were substantially better than our peers ➢ 23 times better than the Bureau of Lab

  28. Slide 28: Committed to Our Employees and Communities Across North America

    Slide 28: Committed to Our Employees and Communities Across North America

    … And We Will Remain Committed to our Employees and our Communities Across North America NuStar has been recognized with numerous awards for its strong corporate culture NuStar employees contributed 90,000 volunteer hours in 2018 alone  NuStar maintains local volunteer councils in each community in

  29. Slide 29: Appendix

    Slide 29: Appendix

    Appendix Continued Improvement: Our 2019 Plan

  30. Slide 30: Producers in the Basin Remain Bullish on Permian Growth

    Slide 30: Producers in the Basin Remain Bullish on Permian Growth

    Producers in the Basin Remain Bullish on Permian Growth, Strength & Resiliency “When we first described the cadence over the next “The 2019 drilling programs should exhibit a significant two years, we described 2020 as production numbers productivity increase versus 2018 program. Wider spacing that

  31. Slide 31: Long-Haul Pipelines Will Bring Additional 2.1MMBPD Capacity to Corpus Christi

    Slide 31: Long-Haul Pipelines Will Bring Additional 2.1MMBPD Capacity to Corpus Christi

    Long-Haul Pipelines Will Bring an Additional 2.1MMBPD Capacity to Corpus Christi For now, Gulf Coast export Permian Crude Pipeline Takeaway vs. Production facilities, like Permian Basin 8,000 (thousand barrels per day) producers and shippers, Red Oak 7,000 remain constrained by the Wink to limits of

  32. Slide 32: Port of Corpus Christi Expected to Become Largest U.S. Crude Export Hub

    Slide 32: Port of Corpus Christi Expected to Become Largest U.S. Crude Export Hub

    By Mid-2020, the Port of Corpus Christi is Expected to Become the Largest U.S. Crude Export Hub Regional refiners’ consumption has topped U.S. Gulf Coast Oil Exports by Hub (MMBPD) out, which means that a significant 7.0 Cactus II, Gray Oak proportion of the volumes to be transported and EPIC suppor

  33. Slide 33: New Connections in Taft, Texas Establish Footprint in South Texas Hub

    Slide 33: New Connections in Taft, Texas Establish Footprint in South Texas Hub

    Our New Connections in Taft, Texas Will Establish Our Footprint in This Emerging South Texas Crude Oil Hub The long-haul pipeline projects 2MMbpd Taft from the Permian to South from the Texas were developed to Permian ~15 miles to Ingleside maximize shippers’ destination Harbor optionality, and Taft

  34. Slide 34: West Coast Bio-Fuel Strategy Projects

    Slide 34: West Coast Bio-Fuel Strategy Projects

    West Coast Bio-Fuel Strategy Projects (Scheduled for Completion in 2019-2021) • Together, these projects comprise a renewable diesel/biodiesel distribution system that allows us to capture market share, build important customer relationships with key global producers and achieve higher storage rates

  35. Slide 35: Historic and 2019 Estimated Capital Spending

    Slide 35: Historic and 2019 Estimated Capital Spending

    Historic and 2019 Estimated Capital Spending We are carefully managing our capital spending to ensure we maintain our financial strength and further lower our leverage and continue to grow our EBITDA with high-return projects Next year, we expect lower capital spending  We expect 2020 Permian Crude

  36. Slide 36: Debt Maturity Schedule

    Slide 36: Debt Maturity Schedule

    Debt Maturity Schedule We have applied the proceeds from recent dispositions to our revolver balance, which has allowed us to reduce leverage and redeploy capital to invest in low-multiple projects  $234MM of proceeds from our sale of St. Eustatius operations in July 2019  $270MM of proceeds from

  37. Slide 37: Capital Structure as of June 30, 2019

    Slide 37: Capital Structure as of June 30, 2019

    Capital Structure as of June 30, 2019 ($ in Millions) $1.4B Credit Facility $543 Series D Preferred Units $573 NuStar Logistics Notes (4.75%) 250 Series A, B and C Preferred Units $756 NuStar Logistics Notes (4.80%) 450 Common Equity and AOCI 1,073 1 NuStar Logistics Notes (5.625%) 550 Total Equity

  38. Slide 38: Reconciliation of Non-GAAP Financial Information

    Slide 38: Reconciliation of Non-GAAP Financial Information

    Reconciliation of Non-GAAP Financial Information 38

  39. Slide 39: Reconciliation of Non-GAAP Financial Information (continued)

    Slide 39: Reconciliation of Non-GAAP Financial Information (continued)

    Reconciliation of Non-GAAP Financial Information (continued) 39

  40. Slide 40: Reconciliation of Non-GAAP Financial Information (continued)

    Slide 40: Reconciliation of Non-GAAP Financial Information (continued)

    Reconciliation of Non-GAAP Financial Information (continued) 40

  41. Slide 41: Reconciliation of Non-GAAP Financial Information (continued)

    Slide 41: Reconciliation of Non-GAAP Financial Information (continued)

    Reconciliation of Non-GAAP Financial Information (continued) 41

Source: SEC EDGAR · 8-K filed Aug 14, 2019

More decks from NuStar Energy LP