Tennessee Valley Authority · NYSE:TVC

Tennessee Valley Authority — Investor Presentation (September 2015)

109 slides from Tennessee Valley Authority's investor presentation, Sep 28, 2015

  1. Slide 1: Regional Resource Stewardship Council

    Regional Resource Stewardship Council September 28 and 29, 2015 Knoxville, Tennessee

  2. Slide 2: Safety First

    Safety First Building Emergency Plan Regional Resource Stewardship Council | 2

  3. Slide 3: Agenda – September 28, 2015

    Agenda – September 28, 2015 9:30 TVA Welcome Joe Hoagland, Designated Federal Officer RRSC Welcome Avis Kennedy, Council Chair Agenda Review Lee Matthews, Facilitator 9:50 FACA Briefing Kendra Mansur, Office of the General Counsel 10:00 DFO Briefing Hoagland 10:15 Break 10:30 Updates: Pickwick and B

  4. Slide 4: The Federal Advisory Committee Act and The Regional Resource Stewardship Council

    The Federal Advisory Committee Act and The Regional Resource Stewardship Council FACA Briefing—Eighth Term Kendra Mansur, Attorney Office of General Counsel

  5. Slide 5: RRSC Meeting Protocols

    RRSC Meeting Protocols Agenda - Joe Hoagland, Vice President, Stakeholder Relations is the Designated Federal Officer (DFO) Alternate DFO: John Myers, Director, Environmental Policy & Performance - Agenda prepared and approved by the DFO in consultation with Council Chair, Avis Kennedy - Agenda dist

  6. Slide 6: DFO Briefing

    DFO Briefing Joe Hoagland, Designated Federal Officer

  7. Slide 7: Today's Meeting

    TM Today's Meeting

  8. Slide 8: Meeting Goals

    Meeting Goals • Gain an update on TVA’s Floating Houses EIS • Share update on progress on River Operations Dam Safety Approach at Boone Reservoir • Share information on mitigation work related to Boone Reservoir drawdown • Gain advice on managing Encroachments related to TVA managed public resources

  9. Slide 9: Break Time

    BREAK TIME

  10. Slide 10: Pickwick Landing Dam Boone Dam Rehabilitations

    Pickwick Landing Dam Boone Dam Rehabilitations Andy Dodson Specialist, Dam Safety Engineering

  11. Slide 11: Pickwick Landing Project

    Pickwick Landing Project Project Overview for Pickwick Dam | 11

  12. Slide 12: South Embankment Construction

    South Embankment Construction Project Overview for Pickwick Dam | 12

  13. Slide 13: Pickwick Dam Summary

    Pickwick Dam Summary • South embankment of Pickwick Dam has the potential to liquefy in a major earthquake which could lead to significant damage to the dam. • Downstream risks due to a potential dam breach are limited to the few miles below Pickwick Dam. Risks are minimal at Savannah, Tenn. since f

  14. Slide 14: Interim Risk Reduction Measures

    Interim Risk Reduction Measures  Communication and Education  Enhanced Surveillance and Monitoring Systems  Enhanced Emergency Action Plans TVA has worked with local Emergency Management Agencies (EMAs) to educate the Population at Risk (PAR) TVA has implemented a Community Outreach Program • To

  15. Slide 15: Interim Risk Reduction Measures

    Interim Risk Reduction Measures  Communication and Education  Enhanced Surveillance and Monitoring Systems  Enhanced Emergency Action Plans • Composite Video Composite Video • Enhanced Video Enhanced Video with Thermal • with Thermal Overlay • Overlay Project Overview for Pickwick Dam | 15

  16. Slide 16: Interim Risk Reduction Measures

    Interim Risk Reduction Measures  Communication and Education  Enhanced Surveillance and Monitoring Systems  Enhanced Emergency Action Plans Emergency Action Plan Supplement • Provides specific actions for evaluating alerts from monitoring equipment – Prevents FALSE notifications • Additional info

  17. Slide 17: Pickwick Landing - Path Forward

    Pickwick Landing - Path Forward • Feasibility Study Program • National Environmental Policy Act (NEPA) review • Design and Construction Project Overview for Pickwick Dam | 17

  18. Slide 18: Boone Dam Seepage Update

    Boone Dam Seepage Update Sinkhole Making Boone Better | 18

  19. Slide 19: Boone Dam

    Boone Dam Sinkhole Seepage TVA Dam Safety Update | 19

  20. Slide 20: Filter Construction

    Filter Construction • Installed filter to control erosion & capture sediment • Allowed the return of two units to operation Making Boone Better | 20

  21. Slide 21: Boone Dam – Foundation Preparation

    Boone Dam – Foundation Preparation Hand compacting soils in cavities and voids instead of cleaning and refilling with concrete left dam vulnerable to seepage. Making Boone Better | 21

  22. Slide 22: Investigation Program

    Investigation Program • Geophysical Survey helped determine the locations of the drilling locations. • Types of Geophysical Surveys: • ERI - Electrical Resisitivity imaging • SP - Spontaneous Potential • SR - Seismic Refraction • Microgravity, or simply, Gravity Making Boone Better | 22

  23. Slide 23: Investigation Program

    Investigation Program • Utilized borings to evaluate the interior properties of the dam, foundation beneath the dam and the right rim Making Boone Better | 23

  24. Slide 24: Dye Testing Program

    Dye Testing Program • Confirmation of connection of sinkhole to the tailrace. • Confirmation of connection from crest to sinkhole and crest to headwater Making Boone Better | 24

  25. Slide 25: Right Rim

    Right Rim Sinkhole Seepage TVA Dam Safety Update | 25

  26. Slide 26: Right Rim Influence

    Right Rim Influence Making Boone Better | 26

  27. Slide 27: Seepage Flows at Boone Dam

    Seepage Flows at Boone Dam Making Boone Better | 27 VA

  28. Slide 28: Potential Impacts Downstream

    Potential Impacts Downstream Fort Patrick Henry Dam Kingsport and other communities Major Industries Making Boone Better | 28

  29. Slide 29: Boone Lake – Impacts Upstream

    Boone Lake – Impacts Upstream Residences Marina Marina Marina Making Boone Better | 29

  30. Slide 30: Composite Diaphragm Wall

    Composite Diaphragm Wall Epikarst Grouting 30

  31. Slide 31: Composite Diaphragm Wall

    Composite Diaphragm V\éll Boone Dam Seepage Remediation Stage 2 — Platform Consteuction and HMG Grout Curtain Sinkhol Control Building tuners Muddy Seepage Point HMG Grout Curtain ~~ pea

  32. Slide 32: Composite Diaphragm Wall

    Composite Diaphragm Vall Boone Dam Seepage Remediation Stage 3 — Diaphragm VWValluss Construction / n\n | “Ss y ||

  33. Slide 33: Boone Dam Summary

    Boone Dam Summary • Investigations have been conducted and confirmed a complex network of seepage paths under the dam both from the reservoir to the tailwater and from the right rim. • Internal erosion of the earthen dam due to underground seepage has been confirmed. • Near-term plans include conduc

  34. Slide 34: Boone Reservoir Drawdown Mitigation Strategies

    Boone Reservoir Drawdown Mitigation Strategies

  35. Slide 35: Boone Reservoir Drawdown - Public Awareness

    Boone Reservoir Drawdown - Public Awareness • Dedicated Boone Dam Project Website • On going Media Briefings and Updates • Public Meetings • Focus Group • Twitter and Facebook Updates • Boone Weekly Update electronic newsletter • F/T Public Relations position and local office established (office ope

  36. Slide 36: Boone Reservoir Drawdown – Mitigation

    Boone Reservoir Drawdown – Mitigation Residential Shoreline ‐ Fees • Waive Section 26a application fees for eligible property owners on Boone Reservoir until normal reservoir operations are resumed. • Approved variance to consider requests for temporary docks/ramps to be placed along the shoreline t

  37. Slide 37: Boone Reservoir Drawdown – Mitigation

    Boone Reservoir Drawdown – Mitigation Residential Shoreline ‐ Boats • TVA conducted an informal boat assessment on Boone for those boats stranded in dock lifts. It is estimated that approximately 200 boats remain. • TVA is currently reviewing options for boat extraction assistance. There are several

  38. Slide 38: Boone Reservoir Drawdown – Mitigation

    Boone Reservoir Drawdown – Mitigation Residential Shoreline – Vegetation Management • TVA is also considering several options to manage the successional vegetation in the exposed lakebed. TVA has communicated that vegetation removal or management on private property needs no approval from TVA. Makin

  39. Slide 39: Boone Reservoir Drawdown – Mitigation

    Boone Reservoir Drawdown – Mitigation Fisheries Habitat Enhancement • Partnership with Tennessee Wildlife Resources Agency and private landowners • Native vegetation to be planted in drawdown area – Provides wildlife habitat, erosion control, and aesthetics – Enhances fish habitat • Identification o

  40. Slide 40: Boone Reservoir Drawdown – Mitigation

    Boone Reservoir Drawdown – Mitigation Archaeological Site Protection • Monthly ARPA Patrols • Monitoring of previously recorded sites • Volunteer Site Monitoring Program • Support for ETSU archaeological research • Surveys to identify new sites • Hydro-seeding Making Boone Better | 40

  41. Slide 41: Boone Reservoir Drawdown – Mitigation

    Boone Reservoir Drawdown – Mitigation Public Access • Improves and enhances the only usable public boat launching ramp at Pickens Bridge. • Adds additional boat launching ramps on S. Fork Holston River and at Boone Dam. • Addresses local EMS concerns. • Includes temporary replacement of beach near B

  42. Slide 42: Boone Reservoir Drawdown – Mitigation

    Boone Reservoir Drawdown – Mitigation Commercial Marinas • Loans to help marinas stay in business – 0% now – 5.25% later – 6 of 7 participating • Waiver of permit fees for new requests (i.e. ramps, seawalls) • Waiver of rent Making Boone Better | 42

  43. Slide 43: More Information

    More Information http://www.tva.gov/boonedrawdown/ follow @BooneRepair Making Boone Better | 43

  44. Slide 44: Questions?

    TM Questions?

  45. Slide 45: Overview of TVA Curation Partnerships

    Overview of TVA Curation Partnerships Erin Pritchard Specialist, Archaeologist

  46. Slide 46: TVA Has a Rich Legacy in Archaeological Stewardship

    TVA Has a Rich Legacy in Archaeological Stewardship The stewardship of archaeological sites on TVA began in 1933 when the TVA Board recognized the significance of archaeological sites to be lost by TVA dam construction projects. • Local university archaeologists met with A.E. Morgan to discuss the l

  47. Slide 47: TVA Has a Rich Legacy in Archaeological Stewardship

    TVA Has a Rich Legacy in Archaeological Stewardship Early Archaeological Excavations Labor provided by the New Deal program labor (Works Progress Administration, Federal Emergency Relief Administration, Works Progress Administration) Excavations were conducted on Norris, Wheeler, Pickwick, Guntersvi

  48. Slide 48: University of Alabama Collections

    University of Alabama Collections Office of Archaeological Research Prior Conditions Overview of TVA Curation Partnerships | 48

  49. Slide 49: University of Alabama Collections

    University of Alabama Collections Office of Archaeological Research Project Benefits Artifact storage now meet archival requirements New inventory for easier access to materials Renewed interest in the complex archaeological record in the Tennessee Valley Improved relationships and increased collabo

  50. Slide 50: University of Tennessee Collections

    University of Tennessee Collections McClung Museum of Natural History & Culture Prior Conditions Overview of TVA Curation Partnerships | 50

  51. Slide 51: University of Tennessee Collections

    University of Tennessee Collections McClung Museum of Natural History & Culture Project Benefits Significant archival records now digitized Documents contained in archival quality containers Consistent inventory of material Improved relationships and increased collaboration on research and public ou

  52. Slide 52: Long-term Benefits and Plan

    Long-term Benefits and Plan • Consolidation of collections into fewer repositories - Reduces efforts for management and reporting requirements for agency • Improved collaboration, research and public outreach - Renewed interest in collections by graduate researchers - Increase in cultural resource p

  53. Slide 53: Slide 53

  54. Slide 54: Break for Lunch

    Break for Lunch Meeting will reconvene at 12:45PM

  55. Slide 55: Regional Resource Stewardship Council

    Regional Resource Stewardship Council

  56. Slide 56: Stewardship Update - Introduction

    Stewardship Update - Introduction Rebecca C. Tolene Deputy General Counsel and Natural Resources

  57. Slide 57: TVA Natural Resource Stewardship

    TVA Natural Resource Stewardship FY15 Highlights Completed 238 Projects in 7 States Natural Resource Stewardship Update | 57

  58. Slide 58: TVA Natural Resource Stewardship

    TVA Natural Resource Stewardship Outreach and Partnerships Natural Resource Stewardship Update | 58

  59. Slide 59: Natural Resource Stewardship Work

    Natural Resource Stewardship Work FY15 Projects – TVA Dam Reservations Maintain & Expand Trail System Improve Public Experience Natural Resource Stewardship Update | 59 Expand Accessibility

  60. Slide 60: Tennessee River Aquatic Biodiversity

    Tennessee River Aquatic Biodiversity Network Meeting and Celebration TVA hosted over 130 participants for the Tennessee River Aquatic Biodiversity Network Meeting and Celebration at the Tennessee Aquarium in Chattanooga, TN. Natural Resource Stewardship Update | 60

  61. Slide 61: Tennessee River Cleanup

    Tennessee River Cleanup Living Lands & Waters Tour TVA partnered with communities across the Valley to host the Living Lands and Waters Barge and Classroom Tour along the Tennessee River. Natural Resource Stewardship Update | 61

  62. Slide 62: Natural Resource Stewardship Work

    Natural Resource Stewardship Work FY16 Projects Support Sustainable Tourism in Valley Communities Build Interest in Science & Engineering Engage Stakeholder Groups Natural Resource Stewardship Update | 62

  63. Slide 63: Floating Houses Draft EIS Update

    Floating Houses Draft EIS Update Matthew Higdon NEPA Specialist III

  64. Slide 64: Floating Houses

    Floating Houses Beginning of NEPA Review • A Notice of Intent was published in the Federal Register April 30, 2014, to conduct an environmental review in accordance with the National Environmental Policy Act (NEPA). A 90-day public comment period ended July 29, 2014. • The NEPA review is programmati

  65. Slide 65: Floating Houses

    Floating Houses Scoping Report (February 3, 2015) • Safety of electrical, mooring, and anchoring systems • Water quality: proper management of black and grey water • Need stronger regulation, policing, enforcement • Need minimum safety and environmental standards with regular inspection • Economic,

  66. Slide 66: Floating Houses

    Floating Houses Draft Environmental Impact Statement • Released on June 18, 2015 • Draft EIS evaluates six policy alternatives for managing floating houses and nonnavigable houseboats • Federal Register notice, press release, website, emails, and notice to intergovernmental partners • Available for

  67. Slide 67: Floating Houses

    Floating Houses EIS Management Alternatives • No Action Alternative – Current Management • Alternative A – Allow Existing and New Floating Houses • Alternative B1 – Grandfather Existing and Prohibit New • Alternative B2 – Grandfather but Sunset Existing and Prohibit New • Alternative C – Prohibit Ne

  68. Slide 68: Floating Houses

    Floating Houses EIS Management Alternatives In the Draft EIS, TVA identified Alternatives B1 or B2 as its preference. “TVA’s preference is to continue to allow pre-1978 nonnavigable houseboats in compliance with a current permit, and to permit (i.e. grandfather) existing unapproved floating houses,

  69. Slide 69: Floating Houses

    Floating Houses Public Meetings – Draft EIS Review Period Five public meetings: “open house” format and presentation with Q&As Location Date Attendance Bryson City, NC July 9 75 Lafollette, TN July 21 110 Parsons, TN July 28 45 Webinar Session August 12 30 Johnson City, TN August 18 58 Generally, mo

  70. Slide 70: Floating Houses

    Floating Houses Draft EIS - Press Floating Houses | 70

  71. Slide 71: Floating Houses

    Floating Houses Public Comments Received 137 separate submittals from agencies, organizations, and individuals • Three federal agencies (EPA, DOI, FS) • Six state agencies (TN DEC/TWRA, VA DEQ, KY DEP/SHPO, NC WRC) • Seven organizations (Sierra Club, Southern Environmental Law Center, TN Wildlife Fe

  72. Slide 72: Floating Houses

    Floating Houses Summary of Comments • “TVA should not have allowed this to happen.” • Private use of public resource • Majority stated support for grandfathering NN/FHs. However, NN/FH owners were generally supportive of B1 while opponents were supportive of B2 because it led to removal after sunset

  73. Slide 73: Floating Houses

    Floating Houses Summary of Comments Current NN Owners: • Support grandfathering but oppose sunset (Alternative B2) • Don’t punish the compliant NN owners • Mixed support of new standards (expensive vs needed) • TVA should not have allowed this issue to grow Current FH Owners: • Support grandfatherin

  74. Slide 74: Floating Houses

    Floating Houses Summary of Comments Opposition: • Private use of public reservoirs • Concern over water quality, navigation, crime, and trash • Shoreline landowners opposed to unsightly FH/NNs • Most supported Alt B2 with shorter sunset (20 years), some support of Alt C Agencies: • Agencies expresse

  75. Slide 75: Floating Houses

    Floating Houses Next Steps – NEPA and Rulemaking Currently: • TVA reviewing and responding to substantive comments and revising EIS as needed • Draft Proposed Rule (new standards and rules) Late 2015: • Issue Final EIS in late 2015 (identify preferred alternative) • Publish Notice of Proposed Rule M

  76. Slide 76: Break Time

    BREAK TIME — % Se. = 2 * 4

  77. Slide 77: RRSC Advice Questions

    RRSC Advice Questions 1. Does the Council have additional ideas or guidance on how to prevent encroachments on TVA property, particularly on narrow strips of shoreline land along the lengthy river system? 2. For permanent structures (i.e., portions of homes), should TVA develop more flexible resolut

  78. Slide 78: Overview of US/TVA Property and Encroachment Resolution

    Overview of US/TVA Property and Encroachment Resolution Rebecca C. Tolene Deputy General Counsel and Natural Resources

  79. Slide 79: Purpose

    Purpose Portion of a Porch on TVA • Describe different types of Property on properties Chatuge Reservoir • Overview of reservoir land planning process • Receive committee advice on resolution of encroachments on TVA reservoir property Overview of US/TVA Property and Encroachment Resolution | 79

  80. Slide 80: TVA Property Acquisition and Utilization

    TVA Property Acquisition and Utilization ~1.3 million acres acquired since 1933 Focus for today Overview of US/TVA Property and Encroachment Resolution | 80

  81. Slide 81: TVA's Reservoir Land Planning Process

    TVA’s Reservoir Land Planning Process • Reservoir land management plans guide TVA’s management decisions on natural resources and property administration and provide a clear statement of how TVA intends to manage its public land • Public input is sought during the planning process and completed plan

  82. Slide 82: Land Planning Zones

    Land Planning Zones Project Operations Residential Shoreline Access ~21,200 acres Industrial ~14,000 acres ~4,200 acres Developed Recreation ~21,200 acres Natural Resource Conservation ~182,300 acres Sensitive Resource Management ~50,000 acres Overview of US/TVA Property and Encroachment Resolution

  83. Slide 83: Property Encroachments

    Property Encroachments What is an encroachment? • The placement, construction, or continued existence of a permanent or temporary structure or other privately owned property on, under, in, or over land or land rights owned by another party without permission • Encroachments can occur on TVA property

  84. Slide 84: Encroachment Prevention

    Encroachment Prevention TVA utilizes various tools in an effort to prevent encroachments • Boundary marking and signage • Shoreline inspections • Targeted mailers where there is a high potential for encroachments - Areas where new development is occurring - Areas where minor encroachments have been

  85. Slide 85: Property Encroachments

    Property Encroachments • Despite prevention measures, TVA discovers Unauthorized Dock on private encroachments on Guntersville Reservoir public lands (examples include houses, fences, sheds, make-shift homesteads, unauthorized vegetation removal) • Many of these are corrected through voluntary actio

  86. Slide 86: Type of Encroachments

    Type of Encroachments Top five types of infractions • Water-use facilities (includes docks, piers, boathouses, ramps, etc. that are constructed without approval or not in compliance with approval) • Land-based structures (includes fences, decks, patios, steps, etc. that are constructed without appro

  87. Slide 87: Type of Encroachments

    Type of Encroachments • Some encroachments are temporary and are easily removable - Fences - Storage buildings - Decks and patios • Some are more permanent in nature and are more costly and difficult to remove or remediate - Houses - Driveways - Tree cutting (takes a long time to regenerate) • Some

  88. Slide 88: Encroachments on TVA Power Property

    Encroachments on TVA Power Property • TVA owns approximately 4,200 acres of property for power substations • TVA holds approximately 237,000 acres of transmission right-of-way (primarily easements across private property for transmission lines) • Tools to resolve encroachments on this fee land or ea

  89. Slide 89: Encroachment Resolution

    Encroachment Resolution • Current tools for resolution of reservoir property encroachments – Removal or modification of the encroachment (either by the responsible party or TVA) – Restoration of vegetation (when the encroachment involves tree cutting) – Approval via Section 26a permit, sufferance ag

  90. Slide 90: Encroachment Resolution Issues

    Encroachment Resolution Issues When the encroachment is a permanent structure • Cost to resolve the encroachment can cause a financial burden for the responsible party and/or TVA • Resolution of the encroachment can be very time consuming and require a large amount of TVA staff resources • Some opti

  91. Slide 91: Encroachment Examples

    Encroachment Examples Kentucky Reservoir • House under construction and partially on TVA property discovered in 1999 – Structures on TVA property include partial house, garage, underground boathouse, driveway, and fill – Concrete driveway and patios were also constructed on TVA property but private

  92. Slide 92: Encroachment Examples

    Encroachment Examples Pickwick Reservoir • Owner applied for a dock permit in 2012 – Site inspection revealed encroachments of portions of a house, garage, and porch that were previously existing when the property was purchased – Owner’s survey mapped existing (rather than original) contour property

  93. Slide 93: Encroachment Examples

    Encroachment Examples Chickamauga Reservoir • Owner’s contractor cleared vegetation, trenched, and installed geothermal lines on TVA property zoned for a Habitat Protection Area – Property boundary was well marked and no vegetation removal signs and sensitive area signs were in the immediate area wh

  94. Slide 94: RRSC Advice Questions

    RRSC Advice Questions 1. Does the Council have additional ideas or guidance on how to prevent encroachments on TVA property, particularly on narrow strips of shoreline land along the lengthy river system? 2. For permanent structures (i.e., portions of homes), should TVA develop more flexible resolut

  95. Slide 95: Slide 95

  96. Slide 96: Adjourn for Field Trip

    IVA Adjourn for Field Trip

  97. Slide 97: Regional Resource Stewardship Council

    Regional Resource Stewardship Council September 28 and 29, 2015 Knoxville, Tennessee

  98. Slide 98: Agenda – September 29, 2015

    Agenda – September 29, 2015 8:00 Welcome and Recap Hoagland / Matthews 8:15 Discussion and Initial Advice Matthews / Council 9:00 Public Comment Period Matthews 10:00 Break 10:15 Council Discussion and Matthews / Council Advice 11:30 Wrap Up and Adjourn Kennedy/Hoagland 12:00 Lunch 98 Regional Resou

  99. Slide 99: Recap from Day 1

    Recap from Day 1 Joe Hoagland Designated Federal Officer

  100. Slide 100: Type of Encroachments

    Type of Encroachments Top five types of infractions • Water-use facilities (includes docks, piers, boathouses, ramps, etc. that are constructed without approval or not in compliance with approval) • Land-based structures (includes fences, decks, patios, steps, etc. that are constructed without appro

  101. Slide 101: Type of Encroachments

    Type of Encroachments • Some encroachments are temporary and are easily removable - Fences - Storage buildings - Decks and patios • Some are more permanent in nature and are more costly and difficult to remove or remediate - Houses - Driveways - Tree cutting (takes a long time to regenerate) • Some

  102. Slide 102: Council Discussion and Initial Advice

    Council Discussion and Initial Advice

  103. Slide 103: RRSC Advice Questions

    RRSC Advice Questions 1. Does the Council have additional ideas or guidance on how to prevent encroachments on TVA property, particularly on narrow strips of shoreline land along the lengthy river system? 2. For permanent structures (i.e., portions of homes), should TVA develop more flexible resolut

  104. Slide 104: Public Comment Period

    Public Comment Period • Public participation is appreciated • This is a listening session; responses are typically not provided

  105. Slide 105: Break Time

    BREAK TIME

  106. Slide 106: Council Discussion and Advice

    Council Discussion and Advice

  107. Slide 107: Questions for RRSC

    Questions for RRSC 1. Does the Council have additional ideas or guidance on how to prevent encroachments on TVA property, particularly on narrow strips of shoreline land along the lengthy river system? 2. For permanent structures (i.e., portions of homes), should TVA develop more flexible resolution

  108. Slide 108: Wrap Up and Adjourn

    TM Wrap Up and Adjourn

  109. Slide 109: Thank you and please travel safely!

    Thank you and please travel safely!