Oil & Natural Gas Corp. Ltd. · NSE:ONGC
Oil & Natural Gas — Investor Presentation (November 2011)
56 slides from Oil & Natural Gas's investor presentation, November 2011

Slide 1: Oil & Natural Gas Corporation Ltd. Corporate Presentation
Oil & Natural Gas Corporation Ltd. Corporate Presentation. 1

Slide 2: Presentation overview
Presentation overview 1 Industry scenario Performance FY’11/H1-FY’12 a) ONGC Group 2 b) ONGC c) OVL d) MRPL 3 Initiatives 2

Slide 3: 1. Industry Scenario
1. Industry Scenario

Slide 4: Global Economy
Global Economy Drastic increase in financial volatility World economy projected to grow 4.0% in 2011 & 4.5% in 2012 Real GDP Growth % (Y-to-Y) Accumulating signs of weakness in 2010 2011 10.1 10.3 key advanced economies 9.5 7.8 7.3 7.5 6.4 Sovereign debt and baking sector 5.1 problems in Euro area

Slide 5: Oil demand
Oil demand 2010 witnessed second strongest year of global oil demand growth in last 30 years. Absolute demand expected to surpass pre-recession highs Oil demand grew by 2.4% in 2010; 84.95 mb/d in 2010 against 82.92 mb/d in 2009) Global liquid supply (mb/d) 87.95 Projected demand Projected 2011:

Slide 6: India: Rising consumption
India: Rising consumption Petroleum products registers 2.86% increase in consumption during FY’11. Total consumption 141.75 MMT (137.80 MMT) On Y-to-Y basis consumption increased by 2.86% MS increased by 10.78%; LPG by 9.07% & Diesel by 6.65%. FO /LSHS by (-6.45%) Products basket Consumption of

Slide 7: India: Import dependence
India: Import dependence Increasing import dependence on oil Import dependency increased from 71.85% to 76.54% in last 5 years In FY’11, net import bill for crude oil & petroleum products increases by 22% Import & Export of Crude & Petroleum Products 180 Net import bill of Crude & Products 160 `

Slide 8: 2. Performance a) ONGC Group – FY'11
2. Performance a) ONGC Group – FY’11

Slide 9: O+OEG Production
O+OEG Production Highest ever O+OEG production 62.05 Crude oil production (MMT) 60.74 61.76 61.23 60.93 2.15 1.96 2.22 2.38 2.69 FY’10 FY’11 2.45 2.79 2.95 2.49 2.23 ONGC 24.67 24.42 22.33 23.10 PSC-JV 1.79 2.86 22.44 22.48 23.11 OVL 6.49 6.76 Total 32.95 34.04 5.80 6.84 6.56 6.76 6.49 1.84 1.89 1

Slide 10: ONGC Group: O+OEG Reserves
ONGC Group: O+OEG Reserves Total Reserves (3P): 1,688.29 MTOE 1P 2P 3P 1,688 1,426 Oil Gas Total 1,212 986 ONGC 552.61 659.38 1211.99 961 724 PSC JV 20.37 20.93 41.30 OVL 270.46 164.54 435.00 402 435 Total 843.44 844.86 1688.29 203 35 39 41 ONGC JV OVL Total As on FY’11 10

Slide 11: ONGC Group: Financials
ONGC Group: Financials Highest-ever Turnover & PAT Turnover PAT Net Worth 127,905 114,531 108,679 ` Crore 100,565 18% 12% 22,456 19,404 16% FY'10 FY'11 FY'10 FY'11 FY'10 FY'11 11

Slide 12: 2. Performance b) ONGC – FY'11
2. Performance b) ONGC – FY’11

Slide 13: ONGC: Reserve accretion (3P)
ONGC: Reserve accretion (3P) 24 hydrocarbon discoveries (15 new prospects + 9 new pool) Ultimate Reserve accretion: 83.56 Mtoe the highest in last 2 decades FY’11: Reserve Replacement Ratio (RRR) is 1.76 (with 3P) 90 1.81 82.98 83.56 80 1.72 68.90 70 65.56 1.63 63.82 60 1.54 50 1.45 (MTOE) 40

Slide 14: ONGC: O+OEG Production
ONGC: O+OEG Production Domestic O+OEG production level maintained 52.79 52.96 52.45 52.06 52.60 Crude oil production (MMT) 2.45 2.79 2.23 2.95 2.49 FY’10 FY’11 ONGC 24.67 24.42 22.44 22.33 22.48 23.11 23.10 PSC-JV 1.79 2.86 Total 26.46 27.28 1.84 1.89 1.65 1.79 2.86 Natural gas production (BCM) FY

Slide 15: ONGC: IOR/EOR gains
ONGC: IOR/EOR gains Arresting decline rates in matured fields through IOR/EOR schemes Recovery factor increased from 28% (2000) to 33.5% (2011) 35 15 of 21 IOR/EOR/Redevelopment projects completed 30 Incremental gain in FY’11: 8.48 MMT 25 Cumulative Gain through IOR/ EOR ~ 64 MMT 20 Offshore 15

Slide 16: ONGC: O+OEG production
ONGC: O+OEG production ONGC accounted for 57% of country’s O+OEG production in FY’11 Crude oil: 72% & Natural Gas: 48% Crude oil production Natural gas production OIL 5% OIL 10% Others Others 47% ONGC 18% ONGC 72% 48% ONGC’s production includes its share in PSC JVs Source: MoP&NG 16

Slide 17: 2. Performance b) Resources
2. Performance b) Resources

Slide 18: Maximum NELP Exploration Licenses
Maximum NELP Exploration Licenses ONGC has bid aggressively in NELP rounds; bagged 121 blocks - 51% of 235 blocks- awarded under 8 NELP rounds, either on own or in consortium NELP rounds I II III IV V VI VII VIII Total Blocks awarded 24 23 23 20 20 52 41 32 235 Awarded to ONGC + ONGC Consortia 8+1*

Slide 19: Acreage holding
Acreage holding Despite deregulation and increasing private participation, ONGC is the largest exploration acreage and mining lease holder in India (PEL: 51% & ML: 67%) PEL Areas (Sq. Km) ML Areas (Sq.Km) OIL RIL 2% 28% RIL 1% Cairn OIL 4% 13% ONGC ONGC 67% 51% BHP Billinton Cairn 3% 10% HOEC 2% Oth

Slide 20: Hydrocarbon Reserves
Hydrocarbon Reserves ONGC accounts for 73% of Crude oil & 48% of Gas reserves of the country ~ 61% of O+OEG reserves Crude Oil (MMT) Natural Gas (BCM) OIL 87.35 ONGC 8% 566.37 73% ONGC 550.26 48% Others 511.16 OIL Others 44% 79.13 132.11 10% 17% As on 01.04.2010 20 Source: Hydrocarbon E&P Activities

Slide 21: E&P Infrastructure
E&P Infrastructure State-of-the-art exploration facilities 27+3* Seismic Crews 77+44* 87 (68+19*) Onland Drilling Rigs 34 (9+25*) Offshore 58+30* Work Over Rigs 107 Well Stimulation Units 27+46@ Logging Units 21 * Charter-hired @ plus 37 wire line, 8 LWD charter-hired & Well Shuttle unit

Slide 22: E&P Infrastructure
E&P Infrastructure Globally comparable Production & Transportation facilities 240 Onshore Installations 202 Offshore Installations 26,598 Km Pipelines 17+48* OSVs/MSVs OSV: Offshore Supply Vessels MSV: Multi-purpose Supply Vessel 22 * Charter-hired

Slide 23: Processing Infrastructure
Processing Infrastructure Hazira, Gujarat Handling Capacity: 42 MMSCMD Sour Gas Products: LPG, C2-C3, LAN Uran, Maharashtra Handling Capacity: 20 MMTPA Oil & 16 MMSCMD Gas Products: LPG, ARN, SKO, ATF, Propane, HSD Ankleshwar and Gandhar, Gujarat Handling Capacity: 0.1 MMTPA Oil & 1 MMSCMD Gas Pr

Slide 24: 2. Performance b) ONGC: Financials
2. Performance b) ONGC: Financials

Slide 25: ONGC: Turnover
ONGC: Turnover Turnover up by 12% ` Crore Revenue Sources (` Crore) 69,532 45,483 46,103 FY'10 FY'11 65,049 61,543 61,983 12% 59,058 13,051 7,942 8,305 8,519 FY'07 FY'08 FY'09 FY'10 FY'11 Oil Gas VAP 25

Slide 26: ONGC: Net Profit
ONGC: Net Profit Highest-ever Net Profit; up by 13% ` Crore 18,924 16,702 16,768 15,643 16,126 13% FY'07 FY'08 FY'09 FY'10 FY'11 26

Slide 27: ONGC: Under Recovery
ONGC: Under Recovery FY’11: Total under-recovery ` 24,892 Crore H1FY’12: Total under-recovery ` 17,760 Crore (12,046 + 5,714) Under Recovery (` Crore) Crude Price (US$/bbl) 28,225 Crude oil price realization (US$/bbl) 24,892 22,001 Realizable Discount Realized 17,024 FY’07 66.33 22.11 44.22 FY’0

Slide 28: ONGC: Dividend
ONGC: Dividend Highest-ever Dividend payout of ` 7,486 Crore FY’11: Bonus (1:1) and Share split to ` 5 face value 7,486 Dividend payout ratio (%) 6,844 6,844 7,058 6,631 60 With tax 50 Percentage 40 350% 330% Without tax 320% 320% 30 310% 20 10 Payout in the range of 40-50% 0 FY'07 FY'08 FY'09 FY'

Slide 29: ONGC: H1 FY'12 - Performance
ONGC: H1 FY’12 - Performance Oil & Gas production (MTOE) Financials (` Crore) 26.144 26.117 Turnover 1.118 1.102 38,955 31,949 11.430 11.562 H1 FY'12 H1 FY'11 1.626 1.250 PAT 11.970 12.203 12,737 9,050 H1 FY'12 H1 FY'11 H1 FY'12 H1 FY'11 Crude - ONGC Crude - JV Gas - ONGC Gas - JV

Slide 30: ONGC: Financial Performance
ONGC: Financial Performance % Details H1 FY’12 H1 FY’11 variation Sales Revenue (` Crore) 38,955 31,949 21.9 Net Profit (` Crore) 12,737 9,050 40.7 Subsidy Discount (` Crore) 17,760 8,534 108.1 Gross Realization (US$/bbl) 119.06 79.99 48.8 Net Realization (US$/bbl) 66.52 55.73 19.4 Gross Realization

Slide 31: 2. Performance c) ONGC Videsh Ltd
2. Performance c) ONGC Videsh Ltd

Slide 32: OVL: Global footprint
OVL: Global footprint 18 5 33* Projects in 15 Countries 9 Producing Exploration Discovered 1 Kazakhstan Venezuela 1 1 2 Russia Cuba 2 2 Myanmar Colombia 5 1 1 1 Vietnam Brazil 5 1 Libya 1 1 Iran Nigeria 2 1 Iraq North Sudan 2 1 1 Syria South Sudan * 33rd Project is North Sudan’s 741 km long complete

Slide 33: OVL: O+OEG reserves
OVL: O+OEG reserves 435 Mtoe of ultimate reserves in 12 assets in 8 countries Geographical distribution Oil Gas Total Venezuela 15% Sudan (MMT) (BCM) (Mtoe) 10% P1 104.57 98.34 202.91 Myanmar Vietnam 9% 4% P2 151.91 46.69 198.60 Syria P3 13.98 19.51 33.49 2% Russia Brazil Total 270.46 164.55 435.0

Slide 34: OVL: O+OEG production
OVL: O+OEG production OVL registers highest-ever production: 9.45 Mtoe of O+OEG Odoptu field in Sakhalin commenced production from 15th Sept’2010 present production @54,000bbl/d 7.95 8.80 8.78 8.87 9.45 2.69 1.96 2.22 2.38 4.546 4.561 2.15 1.156 1.311 6.84 6.56 6.49 6.76 5.80 3.390 3.250 H1 FY'12

Slide 35: OVL: O+OEG production
OVL: O+OEG production 9 producing assets in 7 countries Block 5A, Sudan 0.226 Gas (BCM) Oil (MMT) MECL, Colombia 0.468 BC10, Brazil 0.573 0.015 AFPC, Syria 0.647 Sancristobal, Venezuela 0.757 Imperial Russia 0.770 GNOP, Sudan 1.801 Sakhalin-1, Russia 0.415 1.474 2.249 Blcok6.1,Vietnam 0.038 35

Slide 36: OVL: Financials
OVL: Financials Highest-ever Turnover of ` 18,683; up by 21% Turnover (` Crore) PAT (` Crore) 18,424 18,683 16,866 15,383 2807 2691 11,795 2397 21% 2090 1663 29% FY'07 FY'08 FY'09 FY'10 FY'11 FY'07 FY'08 FY'09 FY'10 FY'11 36

Slide 37: OVL: H1 FY'12 Performance
OVL: H1 FY’12 Performance Financials (` Crore) Turnover PAT 122.44 27.17 85.46 7.48 H1 FY'12 H1 FY'11 H1 FY'12 H1 FY'11 37

Slide 38: Satpayev Block, Kazakhstan
Satpayev Block, Kazakhstan Acquired 25% participative interest in Satpayev exploration block in Kazakhstan, OVL signed agreement with KazMunaiGas on 16th April 2011 Satpayev: a shallow water offshore block Agreement signed on 16th April 2011 in presence of Dr. Manmohan Singh, Hon’ble Prime Min

Slide 39: 2. Performance d) MRPL
2. Performance d) MRPL

Slide 40: MRPL
MRPL 11.82 MMTPA capacity state-of-the-art Refinery Acquired majority stake & Management control on 28th March’2003 Currently holds 71.62% of equity (HPCL: 16.96% & others: 11.42%) Capacity being expanded to 15 MMTPA with estimated investment of ` 12,160 Crore Likely commissioning: Dec’201

Slide 41: MRPL: Thru'put
MRPL: Thru’put Highest-ever Refinery Thru’put FY’11: Capacity utilization 107% Thru’put (MMT) 12.53 12.55 12.59 12.50 12.64 10th May’2011 Bagged Petrofed ‘Refinery of the Year’ award for excellent performance during FY’10 FY'07 FY'08 FY'09 FY'10 FY'11 41

Slide 42: MRPL: Financials
MRPL: Financials Highest-ever Turnover; PAT up by 6% FY’11: export of product worth ` 14,604 Crore FY’11: Dividend @12% Turnover (` Crore) PAT (` Crore) 42,719 43,800 37,339 1,272 36,141 1,193 1,177 1,112 32,208 21% 6% 525 FY'07 FY'08 FY'09 FY'10 FY'11 FY'07 FY'08 FY'09 FY'10 FY'11 42

Slide 43: MRPL: H1 FY'12 Performance
MRPL: H1 FY’12 Performance Thruput (MMT) Financials (` Crore) Turnover 26,943 18,581 H1 FY'12 H1 FY'11 6.38 5.78 PAT 310 197 H1 FY'12 H1 FY'11 H1 FY'12 H1 FY'11 43

Slide 44: 3. Initiatives
3. Initiatives

Slide 45: ONGC: East Coast Offshore Development
ONGC: East Coast Offshore Development East coast discoveries to be monetized in 3 phases KG Basin Projects Reliance RAVVA G4-2 Discovery 2002 1. G-1 & GS-15 2. S-1 & Vashista D-1 GS-15/23/KW N-1 E-1 M-1 F-1 3. KG-DWN-98/2 P-1 C-1 A-1 B-1 4. G-4-6, GS-29-1 & G-4-5 G-W R-1 G-1 Q-1 G-E H-1 R-2 VA-1 VA-

Slide 46: ONGC: Daman offshore development
ONGC: Daman offshore development Fast track development of prospects around B-12 & C-24 C - 2 3 C-24 to Fields considered for development: C-39 DAMAN Daman(Main), Daman (North), C-23 102 Kms C-24 C-24 & C-23 C-26 B-12 URAN 46

Slide 47: ONGC: Major projects
ONGC: Major projects New field development Sl. Project Project Cost (` Crore) 1 Development of C-series Fields Phase 1 3,195 2 Development of B-22 cluster Fields 2,921 3 Development of B-46 cluster Fields 1,457 4 Development of B-193 cluster Fields 5,633 5 Additional Development of D-1 Field 2,164 6

Slide 48: ONGC: Major Projects
ONGC: Major Projects IOR/ Redevelopment projects Sl. Project Project cost (` Crore) IOR/ Redevelopment Projects 1 Heera & South Heera Redevelopment 2,305 2 MHS Redevelopment Phase-II 8,813 3 MHN Redevelopment Phase-II 7,133 4 IOR Lakwa-Lakhmani 664 5 IOR Geleki 1,674 6 IOR Rudrasagar 439 E&P Infrast

Slide 49: ONGC: Capital Expenditure
ONGC: Capital Expenditure ` 104,610 Crore Capex in last 5 years FY’11: 98% of Capex on core activities Revised Capex FY’12 28,276 – ` 31,316 Crore (` Crore) 23,559 21,820 Capital projects 47% 17,651 Dev. Drilling 13,305 18% Expl. R&D Drilling 1% 27% Integration Survey 2% 6% FY'07 FY'08 FY'09 FY'

Slide 50: ONGC: Shale gas
ONGC: Shale gas Shale gas strikes in first R&D well in Damodar valley Shale gas integrated Pilot project to drill 4 wells, 2 in Raniganj, West Bengal and 2 wells in North Karanpura, Jharkhand to find the potential of Shale gas in India basins. First well RNSG-1 proved presence of Shale gas on 25

Slide 51: Carbon Management
Carbon Management 19 CDM Projects approved 6 registered with UNFCCC (accruable CERs 209,640 per annum for 10 years) 2 under registration (accruable CERs 25,000+ per annum for 10 years) 4 under development (accruable CERs 45000+ per annum for 10 years) Uran Flare Gas recovery Unit: 97,740 CER

Slide 52: Wind Farm
Wind Farm 51 MW Wind farm commissioned in Gujarat in 2008 102 MW Wind farm planned to be set up in Rajasthan Investment ` 800 Crore Likely commissioning in FY’14 First 51 MW wind farm commissioned in Gujarat on 6th Sept 2008 52

Slide 53: OPaL: ONGC Petro-additions Ltd.
OPaL: ONGC Petro-additions Ltd. Equity holding: ONGC (26%), GSPC (5%), GAIL (19%); Sis & Fis (50%) Project cost: ` 19,500 Crore Scheduled completion: Q3, 2013 Dual feed cracker & polymer plants. Feedstock: Naphtha stream from Uran, Hazira & C2+ Extraction Plant. Contract for Dual feed cracker unit a

Slide 54: OMPL: ONGC Mangalore Petrochemicals Ltd.
OMPL: ONGC Mangalore Petrochemicals Ltd. Equity holding: ONGC (46%), MRPL (3%), to be tied up (51%) Project cost: ` 5,750 Crore Scheduled completion: Q4, 2012 Aromatic Petrochemical Complex producing Paraxylene & Benzene Feedstock: MRPL naphtha & aromatic streams Paraxylene 920,000 TPA Products Benz

Slide 55: ONGC Tripura Power Company Ltd.
ONGC Tripura Power Company Ltd. Equity holding: ONGC (50%), IL&FS (26%), GoT (0.5%), IPO & PE (23.5%) Project cost: ` 3,500 Crore Scheduled completion: Q2, 2012 726.6 MW (2x363.3) Power Project in Tripura for monetizing Tripura Gas Mega power project status obtained from MoP, GOI BHEL awarded contra

Slide 56: 56
56
Source: Internet Archive copy of ongcindia.com
More decks from Oil & Natural Gas Corp. Ltd.
Investor Presentation (August 2026)35 slides · Aug 31, 2026
Corporate Update (October 2025)9 slides · Oct 13, 2025
Investor Presentation (August 2025)36 slides · Aug 29, 2025
FY2024 Earnings Presentation41 slides · May 21, 2024
Investor Presentation (August 2023)44 slides · Aug 29, 2023
Investor Presentation (April 2023)40 slides · Apr 17, 2023