Slide 1: Holistic approach to BESS projects in Finland
Holistic approach to BESS projects in Finland Jaakko Poutamo Sales Manager Merus Power Plc 11/2024
Slide 2: Presentation agenda
Presentation agenda • Who is Merus Power? • How Merus® ESS project development works • What happens in the development phase? • BESS designs in Finland • BESS construction phase • BESS operation & optimization • Overall project management BESS = Battery Energy Storage System 2
Slide 3: Merus Power Plc
Merus Power Plc 2008 Founded Merus Power headquarters, R&D, We design, manufacture Finnish innovative production and test laboratories are in energy storage and power quality solutions Ylöjärvi, Finland. Sales offices in Helsinki, (STATCOM, SVC & active harmonic filters). 140↑ UAE, Colombia and Germ
Slide 4: Merus ESS references from Finland
Merus® ESS references from Finland 2019 Lidl distribution center 2023 Elenia, Securing electricity distribution 1 Järvenpää – 2.6MW / 2.3MWh 2023 Elenia, Securing electricity distribution 2 0.6MW / 0.6MWh and 0.6MW ja 0.6MWh 2020 LEMENE Energy Community Lempäälä – 1.6MW / 1.3MWh 2024 Taaleri, grid b
Slide 5: How Merus ESS project development works
How Merus® ESS project development works COD RTB Development phase Permitting phase Operation phase • Acquiring Grid connection • Final technical concept • Technical O&M • Acquiring suitable land • Final layout Construction Phase • Trading and optimization • Technical concept • Managing the permitti
Slide 6: What happens in the development phase?
What happens in the development phase? • Grid connection capacity and land defines the project boundaries (location, schedule & design) • Land + connection agreement ≠ RTB project • Understand and report how BESS connects to existing grid and impacts its surroundings • Important for both hybrid & st
Slide 7: BESS designs in Finland
BESS designs in Finland • Duration & design: 1h, 2h, or more? • Align MW/MWh ratio based on your project financial structure • AC & DC blocks sized based on secure electrical design • Outdoor conditions: Extreme Finnish weather (freezing temperatures, snow and ice) • Merus Power has containers rated
Slide 8: BESS construction phase
BESS construction phase • Full EPC – Small risk of forgetting crucial tasks • Ground works, foundations, site deliveries, installation, cabling, BoP, connection, commissioning, Fingrid tests, etc… • Know your site and soil – Batteries are heavy • Augmentation – Leave room and infra if possible (MW o
Slide 9: BESS operation & optimization
BESS operation & optimization • O&M – Maximize BESS availability • Not only yearly maintenance visits • Spare part management • 24/7 hotline to improve availability • Remote operation platform • Control room services • Site upkeep • Site guarding, etc. • Optimize your asset by choosing the best mark
Slide 10: Overall project management
Overall project management • This is what you need to master • Land acquisition • Business and financial model development • Permitting • Electrical and mechanical engineering • Battery technology and power electronics • Electrical markets • Local grid codes • Construction and delivery process • Ope