Calpine — Bank of America Merrill Lynch 2010 Power & Gas Leaders Conference
17 slides from Calpine's conference presentation, Sep 29, 2010

Slide 1: Bank of America Merrill Lynch 2010 Power & Gas Leaders Conference
Exhibit 99.1 Bank of America Merrill Lynch 2010 Power & Gas Leaders Conference September 29, 2010 Thad Hill Executive Vice President, CCO

Slide 2: Safe Harbor Statement
Safe HarborStatement Forward-Looking Statements The information contained in this presentation includes certain estimates, projections and other forward-looking information that reflect Calpine’s current views with respect to future events and financial performance. These estimates, projections and

Slide 3: Agenda
Agenda • Introduction to Calpine • Look Back at Last Two Years • 2012 & Beyond 2

Slide 4: National Portfolio of Nearly 29,000 MW
National Portfolio of Nearly 29,000 MW North Southeast 7,336 MW 6,083 MW 26% 21% Texas West 7,433 MW 7,817 MW 26% 27% Peaking Baseload 6,852 MW 3,801 MW 13% 24% Intermediate 18,016 MW 63% Note: Projects Under Advanced Development include Russell City Energy Center and upgrade at existing Los Esteros

Slide 5: Unique Independent Power Producer
Unique Independent Power Producer Calpine is the nation’s largest baseload renewable, natural gas and cogeneration power provider Modern Clean 50 2,500 40 2,000 30 1,500 20 1,000 10 500 - - CPN DYN RRI NRG MIR CPN NRG DYN MIR RRI Source: Energy Velocity (2009). Source: Energy Velocity (2009). Effici

Slide 6: Progress Over the Past Two Years
Progress Over the Past Two Years Old Calpine New Calpine Premier Operating Company Technically Capable Operations • Outstanding safety performance • 92% fleet-wide availability in 2009 Not Focused Strong Operating Cost Performance • No central procurement Costs • Savings of over $100 million vs 2008

Slide 7: Snap-Shots of 2010 Performance
Snap-Shots of 2010 Performance Weather Drove Performance Conectiv Beating Expectations 1,750,000 Geothermal Generation 2% 1,400,000 North Generation 1,050,000 135% West Generation 700,000 11% Southeast 350,000 Generation 7% - Texas Generation Flat CCGT Peakers Source: MDA Earthsat. April 1- Sept. 12

Slide 8: Real Secular Shifts Underway
Real Secular Shifts Underway Shale Gas = Shrinking Coal Margins + Activist EPA = Massive Investment Required 50.00 Views of Potential Retirements: • Wood Mack- 60GW 317 GW • PIRA-40GW 40.00 • Bernstein- 65GW • Barclays- 38GW 30.00 • Credit Suisse- 60GW • BofA ML- 40GW 20.00 139 GW 74-101 GW 38-65 GW

Slide 9: Gas-Fired Generation: A Solution for Tomorrow, Today
Gas-Fired Generation: A Solution for Tomorrow, Today Otay Mesa Energy Center Nuclear Plant Wind Farm Solar Field (CSP) Cost ($/KW) ~$950 $3,000 - $4,500 $1,900 - $2,200 $4,500 - $6,000 Construction 29 mos. 60 –84 mos. 12 –18 mos. 30 –42 mos. Period 1 Land Usage 1/20 th acre / MW Up to 2 acres / MW U

Slide 10: Current Public Policy & Commodity Price Impact on Generation Attractiveness
Current Public Policy & Commodity Price Impact on Generation Attractiveness Clean + New Real Life Impacts: Nuclear Renewables Heavy • Driving competitor M&A Government Calpine’s Support activity towards gas View of the World • State commissions’ Clean Natural Gas Generation rejection of renewable +

Slide 11: Focusing on the Growth of Calpine Fleet
Focusing on the Growth of Calpine Fleet North Geysers Expansion Turbine Upgrades • 11 out of 13 scheduled wells have 2010 – 2011 Growth Projects • 501F: ~15 MWs & ~4.8 IHR1 successfully been completed o 4 Completed • Steam potential for 40-80 MWs o 3 To go in 2010 & 2011 • Potential new unit(s): Sum

Slide 12: Our Vision
Our Vision Premier operating Leader in Stabilize company environmental balance sheet responsibility • Be recognized for top tier • Utilize modern fleet to deliver • Simplify and optimize capital operations performance lower-carbon energy solution structure - Safety • Ensure seat at the table for • I

Slide 13: Appendix
APPENDIX (> CALPINE’ . wee 12

Slide 14: Selected Operating Statistics
Selected Operating Statistics 2Q10 2Q09 2Q10 2Q09 1 Total MWh Generated (in thousands) 20,737 19,940 Average Capacity Factor, excl. Peakers 42.5% 42.3% West 6,294 6,724 West 40.2% 46.0% Texas 8,567 7,922 Texas 52.4% 48.7% Southeast 4,222 3,957 Southeast 35.3% 34.8% North 1,654 1,337 North 31.3% 26.3

Slide 15: Calpine Operating Power Plants – As of July 30, 2010
Calpine Operating Power Plants –As of July 30, 2010 With Load CPN With Peaking Technology Location COD Peaking Type Interest Capacity, Net Capacity West Region Agnews Power Plant* Natural Gas Intermediate CA 1990 28 100% 28 Blue Spruce Energy Center Natural Gas Peaking CO 2003 310 100% 310 Creed Ene

Slide 16: Calpine Operating Power Plants (cont'd) – As of July 30, 2010
Calpine Operating Power Plants (cont’d) – As of July 30, 2010 With Load CPN With Peaking Technology Location COD Peaking Type Interest Capacity, Net Capacity North Region Bayview Oil Peaking VA 1963 12 100% 12 Bethlehem Natural Gas / Oil Intermediate PA 2003 1,130 100% 1,130 Bethpage Energy Center 3

Slide 17: CF CALPINE’
CF CALPINE’
Source: SEC EDGAR · 8-K filed Sep 29, 2010
More decks from Calpine Corporation
Merger or Acquisition (November 2017)12 slides · Nov 16, 2017
Barclays Capital 2015 CEO Energy/Power Conference12 slides · Sep 9, 2015
Investor Day (April 2013)71 slides · Apr 10, 2013
Merger or Acquisition (April 2010)29 slides · Apr 21, 2010
Credit Suisse Energy Summit 201030 slides · Feb 2, 2010
Bank of America - Merrill Lynch 2009 Power & Gas Leaders Conference17 slides · Sep 22, 2009