Terramin Australia Limited · ASX:TZN

Terramin Australia — Corporate Update (August 2016)

19 slides from Terramin Australia's corporate update, August 2016

  1. Slide 1: Terramin General Update

    Terramin General Update Apology from Joe Ranford – General Manager SCCC Quarterly Meeting August 2016 1

  2. Slide 2: Sorry I can’t be there.

    Sorry I can’t be there. 2

  3. Slide 3: Angas Zinc

    Angas Zinc  Regulator site visit – DSD, DEWNR, EPA Site tour and inspection  18th July – Eight govt regulators undertook site visit – the most we have had at once!  Ongoing Closure Plan work continues  TSF cover model feedback positive, data used to update groundwater model, TSF monitoring plan

  4. Slide 4: Terramin in the Media…

    14 Opportunity Sales Service Repair Cre South and Hast Ferace Strathalbyn Ph 0536-2008 \\ High Grade Gold Results established relationships an Ee bi oo fe-open opportunities from 7 i delaide Hills. Newspaper of the Adelaide Hills since 1880 J an d AWARD FOR THE ‘UNFLUSTERED’ FIREMAN || mn FEE ~ OA]

  5. Slide 5: Terramin - Projects

    Terramin - Projects Bird in Hand  Updated Resource published.  252,000 oz (13.3g/t in 588,000 tonnes)  Undertaking mineralogical test work to determine level of gold recovery  Provide an understanding of the neutralising effect of carbonate tails  New resource provides more geological definitio

  6. Slide 6: Martin Janes & Scott Salisbury in Timgad, Algeria

    Martin Janes & Scott Salisbury in Timgad, Algeria 6

  7. Slide 7: Quarterly Environment Report

    Quarterly Environment Report Matt Daniel – Environment and Community Superintendent Angas Zinc 7

  8. Slide 8: Dust – Leading Indicators

    Dust – Leading Indicators  Leading Indicators are not compliance criteria  Investigations are undertaken when leading indicators are reached  Very limited activity happening onsite – Hillgrove once a week  Regional DDGs often receive higher dust levels due to being placed near sensitive receptor

  9. Slide 9: Regional Lead Dust Deposition Q2:2016

    Regional Lead Dust Deposition Q2:2016 May-Pb 239mg/kg, early warning indicator is 150mg/kg – Canola cropping Hi-vol sampler, compliance point – within compliance for all Q2 9

  10. Slide 10: After July heavy rainfalls, TSF remains within compliance

    After July heavy rainfalls, TSF remains within compliance  July – TSF decant surface area 13,068m2 (29/7/2016)  Seepage drains flow rate 3 litres/minute (18/7/2016)  Sediment dam at base of TSF did not overflow 7 6 5 Litres/minute 4 3 2 1 0 10 Drain 1 Drain 2 Drain 3 Drain 4 Drain 5 Total Flow (L

  11. Slide 11: Rainfall at AZM – Onsite Met Station

    Rainfall at AZM – Onsite Met Station Rainfall ‐ mm/month 200 186.13 180 160 140 120 100 80 60 49.91 42.28 40 13.36 13.55 20 0 April May June July August  Average rainfall for Strathalbyn  July: 64.7mm  AZM  186.13mm 11

  12. Slide 12: TSF monitoring bore results

    TSF monitoring bore results Arsenic exceeded the leading indicator in June, receded in July. Correlation with rainfall. 12

  13. Slide 13: TSF bores – other metals

    Zine 35 25 1s sta seine stew iagreaeqaeett | \ —T5FA 1568) TSF) —Leading indicator Iron Lead TSF bores - other metals 200 180 or-inr 9T-une or-Aew otady orew 9T-484 ——TsFA. SFB. ——TSFD Leading indicator

  14. Slide 14: TSF Monitoring Bore Cross Section

    TSF Monitoring Bore Cross Section  Not to scale – conceptual only 14

  15. Slide 15: Closure Plan Update

    Closure Plan Update 15

  16. Slide 16: FMEA Tasks – Completed and Remaining

    FMEA Tasks – Completed and Remaining  Analysis of data, studies and designs continue to be updated in response to the FMEA risk assessment and fortnightly DSD meetings – Must align with Mining Lease conditions  The closure outcome criteria tables are being reviewed with workshops with the EPA, DSD

  17. Slide 17: FYI – Water Quality Burnside Creek, July

    FYI – Water Quality Burnside Creek, July 1200 60 1180 50 1160 1140 40 1120 us/cm NTU 1100 30 1080 20 1060 1040 10 1020 1000 0 Electrical Conductivity @ 25°C Turbidity Burnside In Burnside In Burnside Out Burnside Out Hogben - Downstream of Burnside Creek Hogben - Downstream of Burnside Creek 17

  18. Slide 18: FYI – Water Quality Burnside Creek

    FYI – Water Quality Burnside Creek 0.02 0.018 0.016 0.014 0.012 Mg/L 0.01 0.008 0.006 0.004 0.002 0 Arsenic Cadmium Lead Selenium Zinc Burnside In Burnside Out Hogben - Downstream of Burnside Creek 18

  19. Slide 19: Questions?

    Questions? 19