Cobalt Blue Holdings Ltd. · ASX:COB

Cobalt Blue — Investor Presentation (September 2025)

19 slides from Cobalt Blue's investor presentation, Sep 4, 2025

  1. Slide 1: Minerals for Mobility

    Minerals for Mobility September 2025

  2. Slide 2: Minerals for Mobility

    Minerals for Mobility Critical minerals power the mobile world, but there is a market gap in midstream refining Cobalt Blue is active in battery and electrification commodities, and aims to: Transform resources into opportunities • Unlocking value from diverse feedstocks through proprietary processi

  3. Slide 3: Australia's first refinery aiming to produce cobalt sulphate for batteries and metal for industry/defence

    Australia’s first refinery aiming to produce cobalt sulphate for batteries and metal for industry/defence A generational project at the heart of Australia’s rise as a critical minerals superpower R&D facility transitioning into a commercial-scale battery black mass re-processing plant Copper-zinc-si

  4. Slide 4: Executives and Board

    Executives and Board Andrew Tong Kelvin Bramley Joel Crane CEO CFO & Company Secretary Commercial Manager / IR Andrew is a metallurgist and inventor with Kelvin has over 20 years experience in Joel is a commodity and economic market over 20 years of experience in project senior finance and commercia

  5. Slide 5: Australia's first dedicated cobalt refinery

    Australia’s first dedicated cobalt refinery aiming to produce high-purity cobalt sulphate for the lithium-ion industry and high-grade cobalt metal for defence and industry FID target end-2025  Project partner: Iwatani 30% / 70% COB*  Engineering ~90% complete  Glencore feedstock contract  Typica

  6. Slide 6: Cobalt Prices Poised for Cyclical Recovery

    Cobalt Prices Poised for Cyclical Recovery China’s monthly intermediate cobalt imports vs price  DRC 2025 Export Ban Rebalancing Market 25 Feb 25 $15 DRC Export Ban Announced 20 $12  Battery/Industrial Demand Soaking Up Surplus 000 tonnes Co equiv 15 $9 US$/lb 10 June 25 $6  US DLA stockpile Ban

  7. Slide 7: Broken Hill Cobalt Project

    Demonstration Portal Decline Ancillary infrastructure  Power, water, rail and road connections to existing networks (onsite renewable power generation also being considered). One of the world’s largest undeveloped cobalt Integrated Waste Landforms resources, set to become a generational operation 

  8. Slide 8: Broken Hill Technology Centre and black mass processing

    COB has invested over A$15m in developing a facility that has successfully demonstrated all stages of our minerals processing technology.  Supports ongoing R&D activities (KCR, BHCP, Halls Creek, contract testwork)  Opportunity to commercially treat domestic black mass into Co, Ni, Mn, Li products

  9. Slide 9: Low-cost copper-zinc-silver project optionality

    Optionality for diversified commodity exposure via a low-cost copper-zinc-silver project with near-term exploration planned to test resource growth uplift.  Nil-cash acquisition Stage 1 – Onedin open pit design.  Scoping Study complete Staged Copper–Zinc Development Stage 1 – Onedin Open Pit / Cu

  10. Slide 10: 12-Month Strategic Vision

    12-month Strategic Vision • Grow project into a multi-deposit, long-life copper-zinc-silver operation – leveraging existing infrastructure for capital efficiency & scalability Near-Term Enhancements • Targeted silver recovery (Stage 1) to lift margins • Potential cobalt products (Stage 2) which woul

  11. Slide 11: Corporate work program plan: Next 6-months

    Corporate work program plan: Next 6-months 1. Complete Outstanding Milestones to Kwinana Cobalt Refinery FID • Permitting • Offtake negotiations • Consolidating support for project finance 2. Broken Hill Cobalt Project • Finalise obligations to American Rare Earths Limited, former JV partner • Ongoi

  12. Slide 12: COB Capital Structure

    COB Capital Structure Capital Structure (as at market close 3 September 2025)  Ordinary Shares 444.8m  Performance Rights 6.9m  Options (expiry 23/4/2027 Ex. Price $0.20) 43.5m  Promissory Note (due 1 Oct 2025) $1.0m  Market Cap (undiluted) $22.6m Share Price (as at market close 3 September 202

  13. Slide 13: Kwinana Cobalt Refinery Economics

    Kwinana Cobalt Refinery Economics Refinery to Provide Stable Returns through the Assumptions (100% owned) LT Assumptions Cobalt Price Cycle Cobalt Price US$/lb $12 current, to $28 by 2031 Estimated EBITDA (A$m) $30 Nickel Price US$/lb 7.50 $26 Exchange Rate AUD:USD 0.68 current, to 0.71 by 2029 Fina

  14. Slide 14: Halls Creek Copper-Zinc-Silver Project

    Halls Creek Copper-Zinc-Silver Project Kimberley region of Western Australia, Location 250 km2 tenement package 51% earn-in for $200k COB shares subject to Opportunistic minimum expenditure thresholds, option to Acquisition increase to 75% by 2028 Onedin: 4.8Mt (Indicated) at 0.7% Cu, 3.1% Zn and 38

  15. Slide 15: Halls Creek Financial Parameters, Assumptions & Sensitivities

    Halls Creek Financial Parameters, Assumptions & Sensitivities Parameter Estimated outcome 2027 2028 2029 2030 LT Economic evaluation: Copper1 US$/t 10,002 10,550 10,624 10,828 10,022 Pre-tax NPV 8% (real) A$172m Post-tax NPV 8% (real) A$121m Zinc1 US$/t 2,611 2,578 2,523 2,536 2,780 Pre-tax Internal

  16. Slide 16: Compliance Statements

    Compliance Statements Information included in this presentation is, in part, extracted from reports available via Assumption Input https://www.cobaltblueholdings.com and is referenced in the following Compliance Statements. Cobalt Price US$60,186/t (AU$85,980) The Company confirms that it is not awa

  17. Slide 17: Compliance Statements

    Compliance Statements The Mineral Resource estimate for the BHCP deposits (at a 275 ppm CoEq cut-off) detailed by Mineral Resource classification. Note minor rounding errors may have occurred in compilation of this table. Classification Tonnes (Mt) CoEq (ppm) Co (ppm) S (%) Ni (ppm) Contained Co (kt

  18. Slide 18: Compliance Statements

    Compliance Statements Mineral Resource estimate for the Onedin deposit detailed Slide 9: The information related to the Halls Creek Earn-In Agreement is extracted from classification ASX Announcement released on 18 February 2025 titled ‘COB Diversifies – Major Copper Project Earn in. The information

  19. Slide 19: Disclaimer

    Disclaimer The following notice and disclaimer apply to this investor presentation (Presentation). Forward-looking statements and forecasts You are, therefore advised to read this carefully before reading or making any other use This Presentation contains certain “forward-looking statements” and com