  2. Slide 2: Forward-Looking Statement

    Forward-Looking Statement This presentation contains forward-looking statements. Forward-looking statements involve known and unknown risks, uncertainties and assumptions and accordingly, actual results and future events could differ materially from those expressed or implied in such statements. You

  3. Slide 3: Company Highlights

    Company Highlights Capital Structure (1) Share Price Performance Basic Shares Outstanding (M) 117.4 $0.90 Options (M)(2) 8.5 $0.70 Update RSU and DSU’s (M) 2.5 $0.50 1 Mar ‘23 1 Sep ‘23 1 Mar ‘24 Fully Diluted Shares Outstanding (M) 128.4 Major Shareholders Market Capitalisation (C$) $67M La Mancha

  4. Slide 4: Investment Highlights

    Investment Highlights ❖ Graphite has significant and well-established traditional usage (refractory bricks, lubricants, etc.) ❖ Active Anode Material (“AAM”) is a growth market as an essential input for lithium-ion batteries GRAPHITE ❖ Offtakers seeking diversity of supply as China dominates current

  5. Slide 5: The Role of Graphite

    The Role of Graphite Source: IEA The Anode is Almost Exclusively Made from Graphite 5 www.srgmining.com | TSX.V SRG

  6. Slide 6: The Double Graphite Problem

    The Double Graphite Problem Note: Percentages for mining and EV output based on actual production. All other percentages are based on production capacity 1. Refers to the country where production occurs Source: IEA, FT China Dominates Downstream EV Battery Supply Chain, Especially in Graphite 6 www.

  7. Slide 7: Decoupling vs. De-risking

    Decoupling vs. De-risking Financial Times, 13 February 2023 Financial Times, 30 April 2023 Financial Times, 4 May 2023 Financial Times, 13 March 2023 Bloomberg, 30 March 2023 Bloomberg, 12 August 2023 Volvo, 4 February 2023 Reuters, 1 June 2023 De-risking is the Solution to Complex Supply Chain Real

  8. Slide 8: Vertical Integration Strategy

    Vertical Integration Strategy GRAPHITE CONCENTRATE ~$1,400/T ❖ Updated Feasibility Study on first phase of development completed ❖ Discussions underway to finance construction capital expenditure (debt & equity) - ❖ Target to produce approximately 94ktpa of high-purity flakes in concentrate INCREASI

  9. Slide 9: La Mancha Investment

    La Mancha Investment “La Mancha has seen significant successes in the gold industry, and this investment in SRG is a logical continuation of the Fund’s strategy to invest in commodities necessary to shift the energy system away from one dominated by hydrocarbons. The supply-demand dynamics for clean

  10. Slide 10: Executive Team

    Executive Team Benoit La Salle, FCPA, FCA, MBA – Director and Chairman of the Board: Founder, President & CEO of Semafo, Current President & CEO of AYA Gold & Silver Inc. and Executive Chairman of Sama Resources Inc. Matthieu Bos, MSc – President and Chief Executive Officer: Former Executive Vice Pr

  11. Slide 11: Lola Graphite Project Mining License

    Lola Graphite Project Mining License 1 Mining Permit (#22709) 1 SRG Mining Inc. 94 km2 Lola Graphite Project 2 Exploration Permit (#23178) SRG Mining Inc. 3 92 km2 Gogota Nickel-Cobalt Project 4 5 1 2 “Zone Stratégique” 3 Guinea Ministry of Mines 99 km2 4 “Zone Stratégique” 4 Guinea Ministry of Mine

  12. Slide 12: Lola Graphite Project

    Lola Graphite Project ❖ Completed NI 43-101 compliant Bankable Updated Feasibility Study March 2023 by DRA ❖ Environmental and mining permit received from Government of Guinea ❖ 15 year mining permit awarded on Nov. 2019 for 94 Km2 Resource Statement (Cut-Off Cg 1.0% oxides, 1.4% FR) Category Tonnag

  13. Slide 13: Flake Distribution

    The 4 Key Resource Qualities 8 8 1&2 0 Size Distribution & Grade 30 SP20 Purification Results Head Grade 4.14% Cg PPM Limit Parameter Overall Recovery 84.2% Al 3.4 <20 ICP Results Alkaline Roasting Ca 15.1 25.0 Mass Recovery 84.5% Cr 4.5 <5 Concentrate Grade 95.4% Cu 0.9 <5 (July 2022) Distr. Grade

  14. Slide 14: Feasibility Study Results

    Feasibility Study Results 2023 FS – 94ktpa Sensitivity Analysis Direct $136M Price $1,120 $1,260 $1,400 $1,540 $1,681 Indirect $25M Avg. $36M $45M $53M $62M $71M Sensitivity (Post-Tax) Capex Contingency $17M CFO Owner’s Cost $6M NPV8% $78M $148M $218M $287M $357M Total $185M IRR 15% 20% 25% 29% 33%

  15. Slide 15: Capital and Operating Costs

    Capital and Operating Costs Pre-Production Capital Costs Operating Costs (US$/t) Mining $8M Mining (contract mining) $171 Process Plant $62M Process $323 Tailings & Water Management $4M Site General & Administrative $51 Site Infrastructure $11M Direct $545 Power Plant & Distribution $36M Concentrate

  16. Slide 16: Key Focus Areas & Opportunities

    Key Focus Areas & Opportunities ❖ Increased plant production to 100ktpa graphite concentrate (from 50ktpa in 2019 FS) ❖ NI 43-101 compliant Feasibility Study (“FS”) completed in March 2022 EPC PROPOSAL MINE [H1 2024] ❖ Solicited EPC proposals for mine development, aim to reduce development capital (

  17. Slide 17: Appendix

    Appendix 17 www.srgmining.com | TSX.V SRG

  18. Slide 18: Synthetic vs. Natural Graphite

    Synthetic vs. Natural Graphite TOP 10 PRODUCERS OF NATURAL GRAPHITE (2020E, tonnes) 8 Sulfur Nitrogen Particulate 80g 14g 6g 0 Oxide Oxide Matter 5kg of CO2 Per kg of graphite SYNTHETIC GRAPHITE 1-2kg of CO2 Per kg of graphite NATURAL GRAPHITE SYNTHETIC GRAPHITE NATURAL GRAPHITE Water and air pollut

  19. Slide 19: Flake Size Distribution Comparison

    Flake Size Distribution Comparison FLAKE SIZE DISTRIBUTION 100% 90% 80% 70% 60% 50% 40% 30% 20% 10% 0% Syrah Battery Minerals Mason Graphite Sovereign NextSource SRG Nouveau Monde Triton South Star Northern (Mozambique) (Mozambique) (Canada) (Malawi) (Madagascar) (Guinea) (Canada) (Mozambique) (Braz

  20. Slide 20: ESG Principles

    ESG Principles ❖ Health, safety, and environmental leadership come first ❖ Target ZERO Recordable Incident Rate and ZERO Environmental Incident Rate ❖ Development in line with best practice health, safety and environmental standards HSE ❖ Active engagement with national and regional stakeholders and

  21. Slide 21: 1320 Graham boulevard, suite 132 Mont-Royal, Quebec Canada H3P 3C8

    1320 Graham boulevard, suite 132 Mont-Royal, Quebec Canada H3P 3C8 [email protected] TSX.V: SRG 21 www.srgmining.com | TSX.V SRG

SRG Mining — Investor Presentation (March 2024) on 6ix