Slide 1: September 2026 Quarterly Update
rsonal use only SEPTEMBER 2026 QUARTERLY UPDATE ASX Code: AMI 28 October 2026
Slide 2: Forward Looking Statements
FORWARD LOOKING STATEMENTS rsonal use only This presentation has been prepared by Aurelia Metals Limited (‘AMI’ or the ‘Company’). It should not By its very nature, production and exploration for gold and base metals is a high risk business and is not be considered as an offer or invitation to subsc
Slide 3: Highlights: Production growth driving cash generation
HIGHLIGHTS Production growth driving cash generation rsonal use only Gold, copper and zinc production increased Highest Cobar Region operating cash flow since 2018 Cash building with liquidity above $200M Peak plant expansion nearing completion Great Cobar project remains on budget and schedule New
Slide 4: Production and Costs
PRODUCTION AND COSTS Strong start to FY27 with increased gold, copper and zinc production rsonal use only Gold Production (koz) Copper Production (kt) Unit MarQ JunQ SepQ FY27 Measure Guidance Continuing toProduction Gold benefit from high grade (koz) 43% of FY27 Production Copper guidance midpoint
Slide 5: Mining Supports Production Growth
MINING SUPPORTS PRODUCTION GROWTH Consistent mine development and ore production rsonal use only Development rates sustained Mining rates building ahead of above 1,500m/qtr plant expansion 1,547 160 1,528 1,506 148 Peak 1,359 107 113 Dec 25 Mar 26 Jun 26 Sep 26 Dec 25 Mar 26 Jun 26 Sep 26 Qtr Qtr Qt
Slide 6: Gold, Copper and Zinc Production Increased
GOLD, COPPER AND ZINC PRODUCTION INCREASED Higher grades and strong throughput lift metal production rsonal use only Tonnes processed (kt) maintained near ROM stocks increased that will support record levels expanded plant throughput rates 230 226 123 104 197 187 61 37 Dec 25 Mar 26 Jun 26 Sep 26 De
Slide 7: Peak Plant Expansion Nearing Completion
PEAK PLANT EXPANSION NEARING COMPLETION Expanded capacity from Q3 FY27 rsonal use only Tertiary Ball Mill: Final tie-in and commissioning underway • Ball mill and new cyclone cluster installed • Final tie-in scheduled for late October • Commissioning to be completed in Q2 FY27 • Expected to lift cop
Slide 8: Great Cobar on Budget and Schedule
GREAT COBAR ON BUDGET AND SCHEDULE Fresh air raise (FAR) works mark the next major development milestone rsonal use only Image: Great Cobar long section looking west south-west showing planned development Mine development of 506m for the quarter through to FY28 Total of 2,380m completed to date Surf
Slide 9: Exploration: Peak South Mine continues to deliver
EXPLORATION Peak South Mine continues to deliver exciting results Image: Long section of the Peak South Mine area with recently reported drillholes with significant intersections. rsonal use only Peak – Kairos Significant gold intersected between the Peak and Kairos deposits1 10.0m (8.5m ETW) @ 1.3%
Slide 10: Operating Cash Flow Driving Liquidity Higher
OPERATING CASH FLOW DRIVING LIQUIDITY HIGHER Balance sheet benefiting from strong operating performance rsonal use only Cobar Region operating cash flow this Net cash increased to $160.7M. quarter is highest result since 2018 Liquidity of over $200M provides growth flexibility 65.3 65.3 40.0 200.7 (
Slide 11: Key Focus Areas
KEY FOCUS AREAS Deliver safe, predictable operating performance rsonal use only Drive productivity and cost improvement initiatives Embed asset management fundamentals Execute growth projects, build operational readiness Continue advancing orebody knowledge Attract, develop and retain a high-perform
Slide 12: Contact
CONTACT T: +61 7 3180 5000 E: [email protected] Level 10, 10 Felix Street rsonal use only BRISBANE QLD 4000 GPO Box 7 BRISBANE QLD 4001 aureliametals.com