  1. Slide 1: Strong Heritage Strong Future Investor Presentation

    Strong Heritage Strong Future Investor Presentation December, 2013

  2. Slide 2: Forward-Looking Statements

    Forward - Looking Statements 3 This report contains forward - looking statements within the meaning of the Private Securities Litigation Reform Act of 1995, including, without limitation, statements about the proposed change in corporate structure as well as statements as to the expectations, belief

  3. Slide 3: Great Equipment, Great People

    Great Equipment Great People A Reputation For Operational Excellence, Built Around… 4 Great Equipment Industry leading position in high - spec jack - ups Building four advanced UDW drillships One of the youngest fleets in the industry Industry leading day rates and utilization 90 years of operationa

  4. Slide 4: Rowan's Strategic Transitions And Achievements

    Rowan’s Strategic Transitions And Achievements June 2011 Sold manufacturing business for $1.1 billion in cash June 2011 Initiated four rig, $3 Bn UDW drillship expansion September 2011 Sold Land business for $510 million in cash December 2011 Completed jack - up newbuild program – $3 Bn over 5 years

  5. Slide 5: Rowan's Fleet Is Geographically Diversified

    Rowan’s Fleet Is Geographically Diversified 6 6 / North Sea 10 / Middle East 4 / SE Asia 19 High - spec Jack - ups 8 Premium Jack - ups 3 Commodity Jack - ups with Skid - base Capability 7 / US GOM Drillship #1 4 Ultra - Deepwater Drillships Under Construction 1 / Med 2 / Trinidad Drillship #2 Jack

  6. Slide 6: Strong Backlog Growth And Diversified Customer Base

    7 Strong Backlog Growth And Diversified Customer Base $1.2 Bn $1.5 Bn 2010 2011 2012 Current $2.2 Bn $4.4 Bn 25% 12% 46% 8% 2% 2% 3% 2% Norway Middle East Deepwater UK SEA Egypt GOM Trinidad Growing Backlog Distributed By Geography Rowan’s Diverse Customer Base

  7. Slide 7: Rowan Is The Leader In High-spec Jack-ups

    Rowan Is The Leader In High - spec Jack - ups Number of High - spec Jack - ups 0 2 4 6 8 10 12 14 16 18 20 Current By YE 2016 19 Rowan High - spec Jack - ups Includes data supplied by ODS - Petrodata, Inc; Copyright 2013 (as of 10/09/13) 8

  8. Slide 8: Rowan Achieves Higher Day Rates And Utilization

    Rowan Achieves Higher Day Rates And Utilization Comparison of Current Day Rates: Rowan vs. Peers (000s) Comparison of Utilization 2003 – 2013YTD: Rowan vs. Peers 0 20 40 60 80 100 Rowan Peers (1) Peers include DO, RIG, NE, SDRL/ NADL, and ESV $279 $149 $141 $124 $177 $140 $125 $115 $0 $50 $100 $150

  9. Slide 9: Global Jack-up Fleet Totals

    Global Jack - up Fleet Totals 505 Rigs Total Utilization Is 88%, Marketed 95% 10 US GOM Indian Ocean North Sea Mediterranean Middle East Southeast Asia Mexico C&S America West Africa Australia 59% 59 Rigs 96% 46 Rigs 87% 15 Rigs 93% 27 Rigs 100% 33 Rigs 100% 2 Rigs 91% 77 Rigs 89% 141 Rigs 85% 20 Ri

  10. Slide 10: Competitive Jack-up Utilization At 95%

    Competitive Jack - up Utilization At 95% 0 100 200 300 400 500 600 Total Supply CS / OOS China / Iran Competitive Supply 505 Total Jack - ups 41 Cold Stacked / OOS 56 Non - competitive countries 408 Competitive Jack - ups 60% older than 25 years 95% Utilization 88% Utilization 11 Includes data suppl

  11. Slide 11: Jack-up Market Continues To Bifurcate

    Jack - up Market Continues To Bifurcate 20 40 60 80 100 IS, MS, MC <300'IC 300'IC 350'+ IC(including High Spec) High Spec* Worldwide Utilization By Rig Class % * Excludes Chinese Rig, Master Driller Includes data supplied by ODS - Petrodata, Inc; Copyright 2013 (as of 10/09/13) 12

  12. Slide 12: What's Driving Bifurcation In The J/U Markets?

    What’s Driving Bifurcation In The J/U Markets? • Operators need greater rig capabilities to drill challenging wellbore designs » Deep shelf gas » Long reach horizontals » HPHT » Large pipe programs/heavy string weights • IOCs and NOCs are focused on achieving lower wellbore costs rather than the low

  13. Slide 13: Newbuild Jack-ups Should Replace Aging Rigs

    Newbuild Jack - ups Should Replace Aging Rigs 14 6 5 2 4 16 22 46 13 0 10 20 30 40 50 60 2013 2014 2015 2016+ Contracted Not Contracted 300’IC+ Newbuilds Under Construction: 114 Total 48 22 27 • 15% Contracted • Only 32 of the 114 units under construction are high - spec • 57 jack - ups have been or

  14. Slide 14: Newbuild Jack-ups Needed To Replace Aging Fleet

    Newbuild Jack - ups Needed To Replace Aging Fleet 15 Jack - ups by Year Built Includes data supplied by ODS - Petrodata, Inc; Copyright 2013 (as of 10/09/13) JACK - UPS DELIVERED TO - DATE 158 0 10 20 30 40 50 60 70 80 90 310 JACK - UPS OVER 25 YEARS 278 JACK - UPS IN LATEST CYCLE

  15. Slide 15: High-Spec Dayrates Climb Through Newbuild Cycle

    $0 $50,000 $100,000 $150,000 $200,000 $250,000 Premium* High Spec 0 100 200 300 400 2000 2001 2002 2003 2004 2005 2006 2007 2008 2009 2010 2011 2012 2013 High - Spec Dayrates Climb Through Newbuild Cycle Average Earned Day Rate Includes data supplied by ODS - Petrodata, Inc; Copyright 2013 (as of 10

  16. Slide 16: A Wave Of Jack-up Retirements Could Be Coming

    0 50 100 150 200 250 300 A Wave Of Jack - up Retirements Could Be Coming 17 World jack - up rig population over 40 years old is growing… Includes data supplied by ODS - Petrodata, Inc; Copyright 2013 (as of 10/09/13) # of jack - ups 40+ years JACK - UPS OVER 40+ YEARS IN 10 YEARS 288 18 JACK - UPS O

  17. Slide 17: Rowan Is Entering UDW Market – With Advantages

    Rowan Is Entering UDW Market – With Advantages • Long standing brand reputation for operational excellence and customer satisfaction • Very high specification drillship design with built - in redundancies • Core team of highly experienced and respected deepwater professionals already in place • Cont

  18. Slide 18: Recent Rowan UDW Drillship Milestones

    Recent Rowan UDW Drillship Milestones 19 Rowan Renaissance Rowan Resolute Rowan Reliance 2. Rowan Resolute September 2 7 – Launched from Dry Dock 1. Rowan Renaissance November 17 – Successfully completed sea trials October 2 – Held Naming Ceremony 3. Rowan Reliance September 30 – Completed keel layi

  19. Slide 19: UDW Drillships Contracted Delivery Schedule

    3 of 4 UDW Drillships Contracted 20 Delivery December 2013 2013 2014 2015 3 Year Contract Commences March 2014 Rowan Renaissance 1 Delivery June 2014 2 Rowan Resolute Delivery October 2014 3 Rowan Reliance Delivery March 2015 4 Rowan Relentless 3 Year Contract Commences September 2014 3 Year Contrac

  20. Slide 20: UDW Man Power Ramp Up On Schedule

    UDW Man Power Ramp Up On Schedule 21 Rowan Renaissance • Experienced, UDW technical managers in place • Transferring rig personnel from jack - up crews to man portion of UDW rigs • Renaissance 99% complete – 44% of crew will be local Angolan Nationals • Expect staffing for first UDW rig to be comple

  21. Slide 21: Deepwater Demand Fundamentally Strong

    Deepwater Demand Fundamentally Strong 2008 – 2013 YTD, Water Depth 4,000’ and Greater 2008 2009 2010 2011 2012 1H 2013 Announced Discoveries by Year 31 36 40 29 53 2 6 2 2 2 4 4 3 10 11 6 1 1 3 5 1 1 5 52 13 8 1 7 1 Includes data supplied by ODS - Petrodata , Inc; Copyright 2013 (as of 08/01/13) 23

  22. Slide 22: Floater Market Bifurcating At A Fast Pace

    Floater Market Bifurcating At A Fast Pace 50 60 70 80 90 100 <5,000' 5,000'-7,499' 7,500'-9,999' 10,000'+ % Worldwide Utilization by Water Depth Includes data supplied by ODS - Petrodata, Inc; Copyright 2013 (as of 10/09/13) 23

  23. Slide 23: Drillships Will Drive Sector Leading EPS Growth

    85% 114% 95% 70% 10% 32% 42% 176% 170% 97% 103% 50% 48% 56% 0% 50% 100% 150% 200% 250% RDC NE ATW SDRL DO ESV RIG Estimated Earnings Growth Δ 2012( a) - 2014(e) Δ 2012( a) - 2015(e) FactSet e stimates as of 11/25/2013 Drillships Will Drive Sector Leading EPS Growth 24 Expect further EPS growth in 20

  24. Slide 24: Rowan Multiples Now More In Line With Peers

    Rowan Multiples Now More In Line With Peers As of April 12, 2012 Aggregate Value Price to Share Price to Earnings to EBITDA Book Price 2012 2013 2014 2012 2013 2014 Value ($) (x) (x) (x) (x) (x) (x) Seadrill 50.27 16.7x 10.5x 8.9x 7.4x 6.1x 5.7x 1.1x Transocean 37.27 11.9x 11.0x 9.8x 10.5x 9.6x 8.4x

  25. Slide 25: Focused On Execution

    2.71% 3.37% 3.31% 3.93% 1.89% 1.65% 3.27% 2.47% 1.37% 0.80% 0.74% 2.50% Q1-11 Q2-11 Q3-11 Q4-11 Q1-12 Q2-12 Q3-12 Q4-12 Q1-13 Q2-13 Q3-13 Q4-13 Est. Focused On Execution 25% 20% 27% 17% 11% 11% 14% 10% 9% 8% 13% 9% Q1-11 Q2-11 Q3-11 Q4-11 Q1-12 Q2-12 Q3-12 Q4-12 Q1-13 Q2-13 Q3-13 Q4-13 Est. Out of S

  26. Slide 26: Investment Grade Balance Sheet

    (in millions) Actual 09/30/2013 Projected 12/31/2013 Cash and available credit $1,759 ~$1,200 Total Debt $2,009 $2,009 Total Debt - to - Cap 30% 29% Net Debt - to - Cap 17% 24% 27 Investment Grade Balance Sheet (Baa3/BBB - ) Rowan Newbuild Capex With Four Drillships $ 517 MM $ 452 MM 2013 2014 2015

  27. Slide 27: Rowan Focused On Optimum Allocation Of Capital

    Rowan Focused On Optimum Allocation Of Capital • Return on investment analysis drives all capital decisions » Sensitivity analysis – Capital cost, Operating Cost, Day Rate, Tax Rate • Regular consideration of all options for available capital » Newbuilding , purchasing, investments in existing fleet

  28. Slide 28: FS 25) comm cearevine

    FS 25) comm cearevine t ma

  29. Slide 29: Appendix

    Appendix 30

  30. Slide 30: Rowan Drillships Built With The Operator In Mind

    Rowan Drillships Built With The Operator In Mind • Two seven - ram BOPs • Equipped with 12,000 ft of riser • DP - 3 compliant with retractable thrusters • Five mud pumps with dual mud systems • Four million pound riser tensioning system • Third load path • Accommodations for 210 people on board 31 E

  31. Slide 31: 2013 Operating Cost Components

    2013 Operating Cost Components 52% 11% 18% 4% 3% 3% 9% Labor & Fringes Employee-related * R&M Insurance Rig moves Rebillables All other ** 32 * Employee - related costs include training, catering and crew transportation ** Other includes rentals, medics, agent commissions, satellite communications a

  32. Slide 32: Multiple Factors Will Impact Operating Costs

    Multiple Factors Will Impact Operating Costs Estimated Amount (in Millions) Gilbert Rowe in Service $10 - 15 Higher Expense Operating Areas $40 - 45 Shipyard Stays – Increase in Capitalized Expense ($5 – 10) Wage Increases (6% ) $10 - 15 Deepwater Support $10 - 15 Shorebase Expense Increases / Other

  33. Slide 33: Current Rowan Avg. Regional Offshore Rig Operating Costs

    Current Rowan Avg. Regional Offshore Rig Operating Costs Region Jack - ups Gulf of Mexico Mid 40s – Mid $50s Egypt Mid - High $60s Middle East Low $50s – low $70s U.K. North Sea Low $80s Norway North Sea Mid - High$150s Southeast Asia Mid $50s – Mid $60s Trinidad Mid – High $60s 34 (000’s per day) A

  34. Slide 34: Glossary of Terms

    Glossary of Terms Blowout Preventer (BOP): An emergency shut - off device comprised of a series, or “stack”, of valves that shut the wellbore in the event that hydrocarbons enter the wellbore and pressure containment is compromised. The BOP is intended to serve as a pressure control system of last r

  35. Slide 35: Investor Contact

    Investor Contact: Suzanne M. Spera Director, Investor Relations [email protected] Rowan Companies 2800 Post Oak Blvd. Suite 5450 Houston, TX 77056 713.621.7800 www.rowancompanies.com