S.N.T.G.N. Transgaz SA · BVB:TGN
S.N.T.G.N. Transgaz SA — Investor Presentation (September 2020)
60 slides from S.N.T.G.N. Transgaz SA's investor presentation, Sep 30, 2020

Slide 1: Company Presentation 2020
COMPANY PRESENTATION 2020 A RESPONSIBLE COMPANY, A COMPANY OF THE FUTURE!

Slide 2: Message from the General Director
SNTGN TRANSGAZ is the technical operator of the National Natural Gas Transmission System and ensures the performance in terms of efficiency, transparency, safety, non-discriminatory access and competitiveness of the national strategy established for domestic and international transmission, natural g

Slide 3: Vision, Mission, Activities
VISION, MISSION, ACTIVITIES MODERN, DYNAMIC EXCELLENCY ORIENTED COMPANY! VISION The company intends to become an internationally recognized gas transmission operator, a leader on the energy market in the region, with a ACTIVITIES modern national gas transmission system, integrated at European level

Slide 4: Main Components of the Gas Transmission System
MAIN COMPONENTS OF THE GAS TRANSMISSION SYSTEM Over 13,600 km of main gas transmission pipelines and connections CURRENT NTS INFRASTRUCTURE for gas supply, of which 369 km international gas transmission pipelines; 1,128 gas metering stations; 4 gas metering stations for international gas trans

Slide 5: Certifications, Corporate Governance, Shareholding
CERTIFICATIONS, CORPORATE GOVERNANCE, SHAREHOLDING SHAREHOLDING WE TRANSMIT GAS IN EFFICIENCY AND MAXIMUM SECURITY CONDITIONS As of 2008, TRANSGAZ is an active presence on the capital market in Romania, being listed on the Bucharest Stock Exchange. CERTIFICATIONS In line with the unbundling requirem

Slide 6: Organizational Structure
ORGANIZATIONAL STRUCTURE TRANSGAZ is structured by functional units (divisions, units, departments, offices, compartments etc.) and production entities (9 regional offices, sectors, laboratories, working units etc.). TRANSGAZ has a great number of engineers and The evolution of the number of employe

Slide 7: Efficient Capabilities in Research and Design
EFFICIENT CAPABILITIES IN RESEARCH AND DESIGN The research and design activity includes very complex strategic activities aiming at: Rehabilitation and upgrading of the gas transmission system so as to increase safety; Increasing energy efficiency; 146 Metering gas flows; 125 Environmental and labou

Slide 8: Natural Gas Transmission (1)
NATURAL GAS TRANSMISSION (1) CIRCULATED NATURAL GAS Circulated natural gas (including storage) – mil.m3- rolling 12 months 13,703 13,561 13,466 13,544 13,274 13,210 13,234 13,345 13,300 13,022 13,119 12,911 Ian.19 Feb.19 Mar.19 Apr.19 May 19 June 19 July 19 Aug.19 Sep.19 Oct.19 Nov.19 Dec.19 Q I 201

Slide 9: Natural Gas Transmission (2)
NATURAL GAS TRANSMISSION (2) TECHNOLOGICAL CONSUMPTION Price (lei/MWH) for technological consumption 105.37 105.04 108.37 108.37 108.47 109.21 108.2 100.03 99.95 99.88 100.4 100.81 Ian.19 Feb.19 Mar.19 Apr.19 May 19 June 19 July 19 Aug.19 Sep.19 Oct.19 Nov.19 Dec.19 Technological consumption in tota

Slide 10: Main Strategic Objectives 2017-2021
MAIN STRATEGIC OBJECTIVES 2017-2021 As a gas transmission system operator certified according to the Third Continuity of the activity and ensuring safety and security of gas supply Increasing the level of security of the NST and gas supply safety Energy Package, of July 2010 TRANSGAZ is member of EN

Slide 11: Transgaz Investment Program 2019-2028
TRANSGAZ’ INVESTMENT PROGRAM 2019-2028 MAJOR PROJECTS EASTRING ~ 4 BILLION EURO 11

Slide 12: Major Development Projects 2019-2028 (I)
MAJOR DEVELOPMENT PROJECTS 2019-2028 (I) Project Estimated Financing Completion Project no Project value Project importance sources date status mil. Euro (mil. Euro) Ensuring a natural gas transmission capacity to Hungary of 1.75 bcm/y and 1.5 bcm/y to Bulgaria. Own sources: Development on Romania's

Slide 13: Major Development Projects 2019-2028 (II)
MAJOR DEVELOPMENT PROJECTS 2019-2028 (II) Project Estimated Completion Project Financing sources no. Project value Project importance date status (mil. Euro) mil. Euro Own sources: 9.33 Upgrading the gas metering stations at interconnection points to increase the level of energy 7.8 Upgrading GMS Is

Slide 14: Major Development Projects 2019-2028 (III)
MAJOR DEVELOPMENT PROJECTS 2019-2028 (III) The financing modalities considered for the achievement of the key SNTGN Transgaz SA seeks, to obtain, through sustained efforts, financial projects for the development of the National Transmission System support for the financing of investment projects hav

Slide 15: Main Development Projects 2019-2028 (IV): Project Benefits
THE MAIN DEVELOPMENT PROJECTS 2019-2028 (IV) PROJECT BENEFITS integration of the natural gas market and interoperability of natural gas transmission systems in the region; the convergence of gas prices in the region; increasing the flexibility of the European gas transmission system by bidirectional

Slide 16: Corridor between Bulgaria and Hungary (BRUA), Phase 1
Corridor between Bulgaria and Hungary (ROHUAT /BRUA), Phase 1 Aim: development of the gas transmission capacity between the Romanian and the Bulgarian and Hungarian gas transmission systems Capacity: 1.75 bcm/y to Hungary 1.5 bcm/y to Bulgaria Necessary investments: 32’’x63 bar 479 km pipeli

Slide 17: Corridor between Bulgaria and Hungary (BRUA), Phase 2
Corridor between Bulgaria and Hungary (ROHUAT / BRUA), PHASE 2 Aim: The project aims to increase the gas flow to Hungary through the Horia - Csanadpalota Proiectul major de dezvoltare a coridorului Bulgaria– România–Ungaria– Austria (BRUA)-Faza 2 interconnector Conducte SNT existente Conducta BRUA

Slide 18: Access to New Black Sea Gas Sources
ACCESS TO NEW BLACK SEA GAS SOURCES Aim: create a transmission infrastructure for taking over to be produced in the Black Sea Necessary investments: the Black Sea shore–Amzacea pipeline, 32.5 km, Ø 48” (Dn1200) the Amzacea–Podișor pipeline, 275.9 km, Ø 40” (Dn1000) Total estimated costs: 371

Slide 19: Interconnection of the NTS with the T1 Pipeline and Reverse Flow at Isaccea
INTERCONNECTION OF THE NTS WITH THE T1 PIPELINE AND REVERSE FLOW AT ISACCEA Aim: create a transmission corridor between Bulgaria, Romania and Ukraine ensure physical reveres flow at the Negru Vodă 1 point, according to EU Regulation 994/2010 Necessary investments: Phase1 rehabilitation of Dn 8

Slide 20: NTS Developments in the North-Eastern area of Romania
NTS Developments in the North-Eastern area of Romania Aim: enhancing gas supply to North – East Romania ensuring 1.5 bcm/y transmission capacity at the interconnection point between the transmission systems of Romania and Moldova Necessary investments: construction of a DN 700 x 104.1 km pipel

Slide 21: Enlargement of the BRUA Corridor, Phase 3
Enlargement of the BRUA bidirectional transmission corridor (ROHUAT/BRUA), Phase 3 Aim: development of gas transmission capacity on the Oneşti – Coroi – Haţeg – Nădlac corridor depending on the Black Sea or other onshore blocks gas volumes Necessary investments: rehabilitation of some pipeline s

Slide 22: New NTS Developments for Taking Over Black Sea Gas
New NTS developments for taking over Black Sea gas Aim: creation of an additional point for taking over natural gas discovered in the submarine exploitation perimeters of the Black Sea Necessary investments: construction of a 24.37 km DN 500 gas transmission pipeline from the Black Sea shore to

Slide 23: NTS Interconnection with the Gas Transmission System in Serbia
NTS interconnection with the gas transmission system in Serbia Aim: enhancing security of energy supply to the region Necessary investments: construction of an approximately 97km long pipeline in the Recaș – Mokrin direction of which about 85 km on the territory of Romania and 12 km on the terri

Slide 24: Upgrading GMS Isaccea 1 and GMS Negru Vodă 1
Upgrading GMS Isaccea 1 and GMS Negru Vodă 1 Aim: increasing the level of energy security in the region Necessary investments: construction of two new bidirectional gas metering stations, replacing the existing ones . In the case of GMS Isaccea 1 the station will be built in the current station

Slide 25: Interconnection with Ukraine in the Gherăești – Siret Direction
Interconnection with Ukraine in the Gherăești – Siret direction Aim: increasing energy security to the region Necessary investments: the construction of a 130 km gas transmission pipeline and the related facilities, in the Gherăești – Siret direction construction of a cross-border gas metering

Slide 26: Upgrading Gas Transmission Infrastructure in North-Western Romania
Development/Upgrading of the gas transmission infrastructure in the North-Western part of Romania Aim: creation of new gas transmission capacities Necessary investments: construction of a pipeline and of the related equipment in the direction Horia–Medieșu Aurit construction of a pipeline and

Slide 27: Increase in Capacity of Romania-Bulgaria Interconnection, Giurgiu-Ruse
Increase in the gas transmission capacity of the interconnection Romania-Bulgaria, in the Giurgiu-Ruse direction Aim: enhancing security of energy supply to the region Necessary investments: construction of a new gas transmission pipeline and related facilities construction of a new Danube und

Slide 28: EASTRING - Romania
EASTRING - Romania Aim: EASTRING will ensure the most cost-reflective and direct transmission route between the gas platforms from the Western European region and the Balkans/Western Turkey. The possibility to diversify transmission routes and gas supply sources will safeguard the regional securit

Slide 29: Modernization of SMG Isaccea 2 and SMG Negru Vodă 2
Modernization of SMG Isaccea 2 and SMG Negru Vodă 2 - new project proposed in PDSNT 2020-2029 under approval Aim: increasing the level of energy security in the region Necessary investments: modernization of the existing gas metering stations Total estimated costs: 26.65 mil. Euro Estimated co

Slide 30: Modernization of SMG Isaccea 3 and SMG Negru Vodă 3
Modernization of SMG Isaccea 3 and SMG Negru Vodă 3 - new project proposed in PDSNT 2020-2029 under approval Aim: increasing the level of energy security in the region Necessary investments: modernization of the existing gas metering stations Total estimated costs: 26.65 mil. Euro Estimated co

Slide 31: SNT Interconnection at the LNG Terminal on the Black Sea Coast
SNT interconnection at the LNG terminal located on the Black Sea coast - new project proposed in PDSNT 2020-2029 under approval Aim: taking over natural gas from the Black Sea coast Necessary investments: realization of an interconnection of the national natural gas transmission system at the LN

Slide 32: Interconnection with the Gas Transmission System of Moldova
Interconnection between the Gas Transmission System of Romania and the the Gas Transmission System of the Republic of Moldova, in the Iaşi – Ungheni – Chișinău direction Iași – Ungheni – Phase I; Ungheni – Chișinău – Phase II Aim: Increasing interconnectivity between Romania and the Republic of Mold

Slide 33: Financial Results 2019
FINANCIAL RESULTS 2019 1. Statement of comprehensive income as at 31.12.2019 2. Statement of financial standing as at 31.12.2019 3. Revenue drivers 4. Expenses drivers 5. Main indicators 33

Slide 34: Financial Results 2019 (1)
FINANCIAL RESULTS 2019 (1) STATEMENT OF COMPREHENSIVE INCOME AS AT 31.12.2019 (1) Amendments THOUSAND LEI 2017 2018 2019 2019/2018 Absolute Relative Operating revenue before the balancing and the construction activity according to IFRIC12 1,719,993 1,608,437 1,576,667 -31,770 -2% Revenue from the ba

Slide 35: Financial Results 2019 (2)
FINANCIAL RESULTS 2019 (2) STATEMENT OF COMPREHENSIVE INCOME AS AT 31.12.2019 (2) Amendments 2017 2018 2019 2019/2018 THOUSAND LEI Absolute Relative Revenue from the domestic transmission activity 1,338,047 1,178,420 1,192,598 14,178 1% Revenue from the international transmission activity 333,290 32

Slide 36: Financial Results 2019 (3)
FINANCIAL RESULTS 2019 (3) STATEMENT OF FINANCIAL STANDING AS AT 31.12.2019 2017 2018 2019 Amendments 2019/2018 THOUSAND LEI Absolute Relative Fixed assets 3,197,707 3,490,424 4,484,129 993,706 28% Movable assets 1,523,897 1,505,384 1,285,039 -220,345 -15% Total assets 4,721,604 4,995,807 5,769,168

Slide 37: Financial Results 2019 (4): Main Indicators
FINANCIAL RESULTS 2019 (4) MAIN INDICATORS 2019 2018 EBITDA in total sales 29.27% 43.03% EBITDA in equity 14.23% 20.19% Gross profit rate 22.65% 33.46% 1,850,405 Return on equity 9.21% 13.35% Current liquidity 2.58 3.59 1,741,929 Immediate liquidity 1.60 2.99 Leverage 17.44% 6.28% Interest coverage

Slide 38: Stock Exchange TGN Evolution (1)
STOCK EXCHANGE TGN EVOLUTION (1) MAIN CORPORATE EVENTS WITH AN IMPACT UPON THE SHARE PRICE IN 2019 38

Slide 39: Stock Exchange TGN Evolution (2)
STOCK EXCHANGE TGN EVOLUTION (2) TGN EVOLUTION 426.00 408.00 408.50 398.00 370.00 369.00 369.50 360.00 364.00 354.50 365.00 360.00 370.00 355.00 351.50 352.50 351.00 356.00 316.00 341.00 339.00 328.00 333.00 330.00 January February March April May June July August September October November December

Slide 40: Interim Financial Results as at 30.09.2020
INTERIM FINANCIAL RESULTS AS AT 30.09.2020 1. Interim Income statement as of 30.09.2020 2. Interim Balance sheet as of 30.09.2020 3. Revenue drivers 4. Expenses drivers 5. Main business drivers 6. Main indicators 40

Slide 41: Interim Income Statement 30.09.2020 (1)
INTERIM FINANCIAL RESULTS AS AT 30.09.2020 1. Interim income statement as of 30.09.2020 (1) MAIN INDICATORS CHANGES 30.09.2020 30.09.2019 THOUSAND LEI 9M2020/9M2019 (unaudited) (unaudited) Absolute Relative Operational income before the balancing and construction activity according to IFRIC12 1,006,

Slide 42: Interim Income Statement 30.09.2020 (2)
INTERIM FINANCIAL RESULTS AS AT 30.09.2020 1. Interim income statement as of 30.09.2020 (2) MAIN INDICATORS CHANGES 30.09.2020 30.09.2019 THOUSAND LEI 9M2020/9M2019 (unaudited) (unaudited) Absolute Relative Revenues from domestic gas transmission activity 878,327 791,478 86,849 11% Revenues from int

Slide 43: Indicators vs Revenue and Expense Budget
INTERIM FINANCIAL RESULTS AS AT 30.09.2020 Main economic and financial indicators achieved as at 30.09.2020 compared with the Revenue and Expense Budget approved by GOSM Resolution no. 2 / 04.03.2020 CHANGES 30.09.2020 REB 9M2020/9M2019 THOUSAND LEI (unaudited) 30.09.2020 Absolute Relative Operation

Slide 44: Interim Balance Sheet as of 30.09.2020
INTERIM FINANCIAL RESULTS AS AT 30.09.2020 2. Interim Balance Sheet as of 30.09.2020 CHANGES THOUSAND LEI 30.09.2020 31.12.2019 Absolute Relative FIXED ASSETS 5,585,377 4,484,129 1,101,248 25% CURRENT ASSETS 975,365 1,285,039 -309,674 -24% TOTAL ASSETS 6,560,742 5,769,168 791,574 14% EQUITY 3,804,59

Slide 45: Main Revenue Drivers (1)
INTERIM FINANCIAL RESULTS AS AT 30.09.2020 3. Main revenue drivers (1) Revenues 9M 2020 vs. Revenues 9M 2019 (thousand lei) 3,000,000 2,500,000 2,000,000 1,500,000 1,000,000 500,000 - 9M2019 Revenues Revenues from the Capacity booking Financial revenues Other revenues Revenues from the Revenues from

Slide 46: Main Revenue Drivers (2)
INTERIM FINANCIAL RESULTS AS AT 30.09.2020 9M2020 compared to 9M2019 3. Main revenue drivers (2) Operating revenue before the balancing and construction activity, according to IFRIC12 decreased by 7% as compared to 9 months 2019, which is lower by LEI 79,162 thousand. The revenue was influenced main

Slide 47: Main Revenue Drivers (3)
INTERIM FINANCIAL RESULTS AS AT 30.09.2020 9M2020 compared to 9M2019 3. Main revenue drivers (3) revenue from capacity booking higher by LEI 186,911 thousand due to: - booked capacities higher by 3,997,776 MWh, with a positive influence of LEI 8,134 thousand; - capacity booking tariff higher by LE

Slide 48: Main Costs Drivers (1)
INTERIM FINANCIAL RESULTS AS AT 30.09.2020 4. Main costs drivers (1) Expenses 9M2020 vs. 9M2019 (thousand lei) 2,600,000 2,100,000 1,600,000 1,100,000 600,000 100,000 9M2019 Cost of assets Depreciation Employees Cost of repairs Expenses with Expenses with Other Taxes and Financial Royalties Technolo

Slide 49: Main Costs Drivers (2)
INTERIM FINANCIAL RESULTS AS AT 30.09.2020 9M2020 compared to 9M2019 4. Main costs drivers (2) Operating costs before the balancing and construction activity according to IFRIC12 decreased by 5% as compared to 9 months 2019, which is lower by LEI 45,183 thousand. The company made savings of LEI 91,9

Slide 50: Main Business Drivers (1)
INTERIM FINANCIAL RESULTS AS AT 30.09.2020 5. Main business drivers (1) Natural gas volumes circulated (including storage quantities) - mil.cm - rolling 12 months 13.703 13.561 13.300 13.250 13.213 13.228 13.210 13.079 12.960 12.758 12.543 12.339 Oct. 19 Nov. 19 Dec. 19 Jan. 20 Feb. 20 Mar. 20 Apr.

Slide 51: Main Business Drivers (2)
INTERIM FINANCIAL RESULTS AS AT 30.09.2020 5. Main business drivers (2) Natural gas aquisition price for technological consumption (RON/MWH) 114,06 114,11 114,20 114,24 115,99 115,85 114,95 108,47 109,21 108,20 105,65 104,22 Oct.19 Nov.19 Dec.19 Jan.20 Feb.20 Mar.20 Apr.20 May 20 Jun.20 Jul.20 Aug.2

Slide 52: Main Indicators
INTERIM FINANCIAL RESULTS AS AT 30.09.2020 30.09.2020 compared to 30.09.2019 6. Main indicators THOUSAND LEI 1,301,749 9 months 2020 9 months 2019 1,117,139 EBITDA in total sales 33.94% 29.94% EBITDA in total equity 9.97% 10.58% Gross profit ratio 22.22% 20.38% Return on capital 5.38% 6.10% Current

Slide 53: Stock Exchange TGN Evolution (1)
INTERIM FINANCIAL RESULTS AS AT 30.09.2020 Stock Exchange TGN Evolution (1) 53

Slide 54: Stock Exchange TGN Evolution (2)
INTERIM FINANCIAL RESULTS AS AT 30.09.2020 Stock market index Position held in the Stock Exchange TGN Evolution (2) TGN share 30.09.2020 name componence of the index BET 4.72% 6 ROTX 3.85% 7 370.00 360.00 364.00 365.00 330.00 341.00 339.00 355.00 351.50 BET-NG 13.78% 3 BET-TR 4.56% 6 330.50 BET-XT 4

Slide 55: Stock Exchange TGN Evolution (3)
INTERIM FINANCIAL RESULTS AS AT 30.09.2020 Stock Exchange TGN Evolution (3) 55

Slide 56: Stock Exchange TGN Evolution (4)
INTERIM FINANCIAL RESULTS AS AT 30.09.2020 Stock Exchange TGN Evolution (4) 56

Slide 57: Transgaz Compared to Peers
INTERIM FINANCIAL RESULTS AS AT 30.09.2020 TRANSGAZ COMPARED TO PEERS 10.04 EV/EBITDA 11.73 Company P/E P/BV EV/EBITDA 0.90 Enagas Spain 11.50 1.72 10.10 P/BV 2.47 SNAM SpA Italy 12.80 2.30 12.40 Fluxys Belgium 35.20 3.40 12.70 9.40 P/E Average 19.83 2.47 11.73 19.83 Transgaz Romania 9.40 0.90 10.04

Slide 58: Transgaz Partners
Transgaz Partners BULGARTRANSGAZ ICC Romania International Chamber Of Commerce Directorate General for Energy CIA Camera de Comerț, Industrii și Agricultură Sibiu GIE Gas Infrastructure Europe AMCHAM Romania Black Sea Oil and Gas CRE Centrul Român al Energiei ROMGAZ World Energy Council CPGNJATAC AR

Slide 59: Corporate Social Responsibility
The essential role of TRANSGAZ in the energy field in Romania and Europe is naturally complemented by the desire to support the real needs of all those who are constantly contributing to the smooth running of its operations. CORPORATE SOCIAL RESPONSIBILITY Consistent with the principle of applying r

Slide 60: www.transgaz.ro
TRANSGAC www.transgaz.ro
Source: Internet Archive copy of transgaz.ro
More decks from S.N.T.G.N. Transgaz SA
Investor Presentation (June 2026)49 slides · June 2026
Investor Presentation (February 2026)42 slides · February 2026
Investor Presentation (May 2025)36 slides · May 13, 2025
Transgaz — Investor Presentation (November 2024)40 slides · Nov 28, 2024
Investor Presentation (September 2023)33 slides · Sep 30, 2023
Investor Presentation (2023)31 slides · 2023