Kansas City Southern

Kansas City Southern — Corporate Update (August 2020)

39 slides from Kansas City Southern's corporate update, Aug 4, 2020

  1. Slide 1: PSR at Kansas City Southern Webcast Featuring Q&A with Chris Wetherbee, CITI

    Exhibit 99.1 KANSAS CITY SOUTHERN PSR at Kansas City Southern Webcast Featuring Q&A with Chris Wetherbee, CITI © KANSAS © KANSAS CITY SOUTHERN KCS August 4, 2020

  2. Slide 2: Safe Harbor Statement

    Safe Harbor Statement This presentation contains forward-looking statements within the meaning of Section 27A of the Securities Act of 1933, as amended, Section 21E of the Securities Exchange Act of 1934, as amended and the Private Securities Litigation Reform Act of 1995. In addition, management ma

  3. Slide 3: Presenters & Agenda

    Presenters & Agenda . Welcome & Introductions . PSR Initiatives – Network Operations & Performance Metrics – Service Design & Border Operations – Operations Decision Support – Fuel Conservation – Equipment Utilization – Mechanical – Engineering – PSR Dashboard & Scorecard . PSR at KCS: Future-State

  4. Slide 4: Key Messages

    Key Messages . Cross-functional team has developed and implemented PSR initiatives that cover all aspects of KCS operations . Structural changes made to operations during Q220 will provide lasting benefit to cost structure . Uncovering new opportunities to improve network efficiencies, customer serv

  5. Slide 5: KCS' PSR Implementation is Driving Financial Results Well Ahead of the Industry

    KCS’ PSR implementation is Driving Financial Results Well Ahead of the Industry TTM Revenue Change TTM Volume Change TTM Adj. Operating Ratio Change -1% -0.5pts -5% Better -8% -9% -3.4pts KCS Class I ex. KCS KCS Class I ex. KCS KCS Class I ex. KCS TTM Adj. Operating TTM Adj. Net Income TTM Adj. EPS

  6. Slide 6: Network Operations & Performance Metrics

    NETWORK OPERATIONS & PERFORMANCE METRICS STEVE TRUITT, VP AND CHIEF TRANSPORTATION OFFICER DAVID EATON, DIRECCIÓN EJECUTIVA DE OPERACIONES ERWIN BERNAL, SUBDIR. CENTRO DE CONTROL Y OPERACIONES TIM LIVINGSTON, GENERAL MANAGER NOC & RESOURCE PLANNING NICOLAS KLEIN, SUPERINTENDENT NETWORK OPERATIONS ©

  7. Slide 7: Update on Key Metrics to Measure PSR Progress & Performance

    Update on Key Metrics to Measure PSR Progress & Performance YoY FY 2020 Metric Q2 2019 Q2 2020 Change Current B/(W) Goal Velocity (mph) 12.5 17.1 37% 17.0 14.8 Terminal dwell (hours) 21.2 20.3 4% 18.0 22.3 Train length (feet) 5,999 6,921 15% 6,350 7,226 Car miles per day 104.6 118.6 13% 135.0 109.4

  8. Slide 8: PSR Initiatives are Delivering Superior Dwell and Velocity Performance

    PSR Initiatives are Delivering Superior Dwell and Velocity Performance Indexed Velocity Performance Since Q418 First Week of October 2018 = 1.00 1.9 1.8 1.7 1.6 1.5 1.4 1.3 1.2 1.1 1 0.9 KCS Industry Excluding KCS Indexed Dwell Performance Since Q418 First Week of October 2018 = 1.00 1.15 1.10 1.05

  9. Slide 9: Monitoring the Health of the Network

    Monitoring the Health of the Network Investments in data analytics and dashboards facilitate real-time monitoring of the health and performance of our network . Early a.m. dashboard review lays groundwork for productive morning ops calls, trouble-shooting & rapid response . Data facilitates route-ca

  10. Slide 10: PSR is Delivering Results in Key Operating Metrics

    PSR is Delivering Results in Key Operating Metrics GTM per Crew Start GTM's (000's) per Active Loco Car Miles per Day 118.2 3% 12% 125,486 22% Better 519,675 Better Better 504,331 96.6 111,863 TTM Q219 TTM Q220 TTM Q219 TTM Q220 TTM Q219 TTM Q220 Revenue Carloads per Train Train Productivity Foreign

  11. Slide 11: Improved Efficiency Driving Opportunities to Reduce Crew Starts

    Improved Efficiency Driving Opportunities to Reduce Crew Starts Case Study: Leal Crew Change Sanchez to Benjamin Mendez . Improved operations resulting in higher velocity eliminated the need for the Leal Crew board . KCS recently received approval to begin running trains from Sanchez to Benjamin Men

  12. Slide 12: Locomotive Fleet Management

    Locomotive Fleet Management U.S. Daily Available Horsepower 1.2 180 PSR initiatives and a 170 culture of excellence 1.1 160 are driving improved 1.0 150 performance of key 0.9 140 assets 0.8 130 0.7 120 . Available horsepower Available Available Horsepower (millions) 0.6 110 GTM perAvailable Horsepo

  13. Slide 13: U.S. Operations Resource Management

    U.S. Operations Resource Management . Historically, taxi and lodging expenses were driven by volumes - Reaction in March and April to COVID caused uptick - Efficiency has increased as volumes have improved U.S. Taxi & Lodging Expense (dollars in thousands) 110,000 100,000 $1,002k $995k $970k $971k 9

  14. Slide 14: Service Design

    SERVICE DESIGN OLIVIA DAILY, VP PURCHASING © KANSAS CITY SOUTHERN KCS 14

  15. Slide 15: Service Design Improvements Driving Longer Trains

    Service Design Improvements Driving Longer Trains While Maintaining Customer Service Levels . Train start plans were rapidly adjusted during COVID downturn in Q220 . The service design team is working to maintain longer trains through T.S.P. modifications as volumes improve, while keeping trip plan

  16. Slide 16: Border Capacity

    BORDER CAPACITY MIKE WALCZAK, VP NETWORK PLANNING & FINANCE © KANSAS CITY SOUTHERN KCS 16

  17. Slide 17: Border Windows Strategy

    Border Windows Strategy Current State: Four, 6-hour windows per day alternating between north and southbound fleeting Future State: Trains are dispatched as they arrive at the border. Faster and more consistent transit expected to result in: . Improved customer service . Improved border security . E

  18. Slide 18: Operations Decision Support

    OPERATIONS DECISION SUPPORT ANASTASIA AUSTIN, VP REVENUE & YIELD MANAGEMENT © KANSAS CITY SOUTHERN KCS 18

  19. Slide 19: Actual Train Starts Pacing Well Below Pre-COVID Pro Forma Train Starts

    Actual Train Starts Pacing Well Below Pre-COVID Pro Forma Train Starts, Driving Efficiencies as Volumes Return 110 6,500 100 6,000 Train Length (in feet) 90 5,500 ~7,225 80 ~23% increase in train length helping to 70 5,000 improve carload-to- DailyCarloads DailyTrain Starts 60 train start 4,500 rati

  20. Slide 20: Train Start Strategy Varies With Traffic Type

    Train Start Strategy Varies With Traffic Type Daily Carloads vs. Train Starts Daily Train Starts Daily Carloads 6,500 6,000 5,500 99 97 97 5,000 93 DailyCarloads 74 4,500 69 70 59 4,000 2019 Jan-20 Feb-20 Mar-20 Apr-20 May-20 Jun-20 Jul-20 Review opportunities to Balancing efficiencies with transit

  21. Slide 21: Train Level Analysis To Drive Revenue & Margin Improvement

    Train Level Analysis To Drive Revenue & Margin Improvement Utilize Existing Segment & Recent vs. historical Days of the week Capacity to Interchange level performance variability trends drive revenue & margin gains 30 Day 7/1 7/2 7/3 7/4 7/5 7/6 7/7 7/8 7/9 7/10 7/11 7/12 7/13 7/14 7/15 7/16 7/17 7/

  22. Slide 22: Fuel Conservation

    FUEL CONSERVATION CHAD DEVENNEY, AVP OPERATING PRACTICES © KANSAS CITY SOUTHERN KCS 22

  23. Slide 23: Reviewing Trains by Type & Segment to Identify Opportunities to Reduce Power

    Reviewing Trains by Type & Segment to Identify Opportunities to Reduce Power . KCS’ fuel team is reviewing tonnage table ratings to identify segments of track where trains are being overpowered – KCS recently revised the tonnage ratings on five districts in Mexico, allowing for lower horsepower per

  24. Slide 24: Case Study: Increased Train Tonnage Driving Improved Fuel Efficiency on Lazaro Trains

    Case Study: Increased Train Tonnage Driving Improved Fuel Efficiency on Lazaro Trains Morelia to Lazaro Cardenas – 2018 Pre-PSR 16,000 2.80 14,000 Average Fuel 12,000 Efficiency Of 1.43 2.30 10,000 8,000 1.80 6,000 4,000 1.30 TrainTonnage (Bars) Fuel Fuel Efficiency(Dots) 2,000 0 0.80 Intermodal Man

  25. Slide 25: Equipment Utilization

    EQUIPMENT UTILIZATION CARY TIPPINS, AVP INTERNATIONAL ASSET UTILIZATION © KANSAS CITY SOUTHERN KCS 25

  26. Slide 26: Improving Car Cycle Times, Lease Returns and Buyouts Reducing Equipment Expense

    Improving Car Cycle Times, Lease Returns and Lease Buyouts are Driving Structural Reductions to Equipment Expense 18,000 Equipment Expense: 44% Down $38 Foreign Cars Online: 23% Down 17,000 $35 16,000 $32 15,000 $29 14,000 $26 13,000 $23 Foreign Cars Online EquipmentExpense (Millions) 12,000 $20 11,

  27. Slide 27: Grain Fleet Optimization

    Grain Fleet Optimization . Improved cycle times led to 600+ surplus grain cars in 2019 . Elected to sell into the surplus equipment instead of scrapping/selling the cars, driving incremental business: – New shipments from Veracruz to Mexico City – Growth in cross-border shipments to Apaseo and Monte

  28. Slide 28: KCS' Cross-Border Grain Network Provides Long Unit Train Hauls

    KCS’ Cross-Border Grain Network Provides Long, Unit Train Hauls of up to 2,100 Miles © KANSAS © KANSAS CITY SOUTHERN KCS 28

  29. Slide 29: Mechanical

    MECHANICAL MIKE WALCZAK, VP NETWORK PLANNING & FINANCE © KANSAS CITY SOUTHERN KCS 29

  30. Slide 30: Mechanical Initiatives are Driving Results

    Mechanical Initiatives are Driving Results . PSR has driven improvements across Mechanical Headcount* the mechanical department 866 15% Down 856 . Lower active fleet drove 15% lower headcount as well as locomotive and 784 785 782 car shop rationalizations 774 . Storage and disposal of ‘bad actor’ 74

  31. Slide 31: Engineering

    ENGINEERING MANNY LOUREIRO, VP & CHIEF ENGINEER © KANSAS CITY SOUTHERN KCS 31

  32. Slide 32: Engineering Initiatives & Improvements

    Engineering Initiatives & Improvements . 2Q OPEX down 16% YoY – Overtime controls – down 44% 2Q20 vs PY Engineering Operating Expense (in millions) – Headcount down 6.5% 16% Down YoY – Contractor headcount down 30% $39 $39 $38 $38 . Productivity improvements – Rail and tie productivity up 9-26% $35

  33. Slide 33: Asset Management & Service

    Asset Management & Service . Hurricane Hanna response Service Failure Improvements – Core subdivision impacted in Mexico Kansas City to Shreveport – 11 washouts, restored in 25 hours . Track work is complete on major 56 45 traffic corridors 37 30 . Engineering fleet cars 23 – 25% reduction in fleet

  34. Slide 34: PSR Initiative Management & Results Measurement

    PSR INITIATIVE MANAGEMENT & RESULTS MEASUREMENT BRENT VANDER ARK, VP FINANCIAL SERVICES © KANSAS CITY SOUTHERN KCS 34

  35. Slide 35: Accountability & Execution Framework

    Accountability & Execution Framework We’ve established a process and infrastructure to ensure our progress is embedded into our culture…. Functional Leader Ownership Fuel Service Design Locomotive Car Crew Mgmt. Engineering Annually Quarterly Monthly • Initiatives identified • Test/validate targets

  36. Slide 36: On Track to Deliver 2020 PSR Savings of $95M

    On Track to Deliver 2020 PSR Savings of $95M ($ in millions) Total PSR Program Annualized OpEx Savings of $150M FY 2019 FY 2020 OpEx Category Actual OpEx Incremental Savings OpEx Savings Ongoing Compensation & $8 $39 Owner Benefits Initiatives Lower Crew Starts Depreciation $5 $4 from Train Transpor

  37. Slide 37: PSR at KCS – Future State

    PSR AT KCS – FUTURE STATE SAMEH FAHMY, EVP PRECISION SCHEDULED RAILROADING © KANSAS CITY SOUTHERN KCS 37

  38. Slide 38: Fireside Chat Moderated by Chris Wetherbee, CITI

    FIRESIDE CHAT MODERATED BY CHRIS WETHERBEE, CITI © KANSAS © KANSAS CITY SOUTHERN KCS 38

  39. Slide 39: © KANSAS © KANSAS CITY SOUTHERN KCS 39

    © KANSAS © KANSAS CITY SOUTHERN KCS 39

Kansas City Southern — Corporate Update (August 2020) on 6ix