  1. Slide 1: Deccan Gold Mines Limited

    DECCAN GOLD MINES LIMITED ONLY LISTED GOLD EXPLORATION COMPANY IN INDIA. PROJECTS STRATEGICALLY LOCATED WITHIN WORLD CLASS GEOLOGICAL ARCHAEN GOLD PROVINCE. JUNE 2018 No 5, 19th Main Road 4th Sector, HSR Lay Out B Bangalore l – 560 102 Karnataka, India www.deccangoldmines.com 1

  2. Slide 2: Gold Exploration and Mining

    Gold Exploration and Mining Gold is a precious metal. It has emotional, cultural and financial value and different people across the globe buy gold for different reasons, reasons often influenced by a range of national socio-cultural factors, local market conditions and wider macro- economic drivers

  3. Slide 3: DGML's Footprint of Gold Tenements

    DGML’S FOOT PRINT OF GOLD TENEMENTS ¾ Explored 7000 sq sq..km area in the states of Karnataka, AP, Kerala and id tifi d 40 gold identified ld prospectst for f further detailed exploration. exploration. ¾ A total of 21 Prospecting Licence applications (PL) and 2 Mining Lease applications (ML) have be

  4. Slide 4: Dharwar Shimoga Belt Project

    DHARWAR SHIMOGA BELT PROJECT ™ DGML explored an area of around 5000 sq km of the Dharwar-Shimoga Greenstone belt covered under 2 RP blocks. ™ Gold mineralization in all the prospects is hosted within sulphidic banded ferruginous chert. ™ Succeeded in identifying 22 gold prospects. prospects ™ Prospe

  5. Slide 5: Ganajur Main Gold Deposit & Its Satellite Prospects

    GANAJUR MAIN GOLD DEPOSIT & ITS SATELLITE PROSPECTS: • DESPL explored an area of 1,542 Sq km under d a Reconnaissance R i P Permit it (RP) that th t resulted in locating several significant gold prospects that include Ganajur Main Gold project and the adjacent prospects in th Ganajur-Karajgi the G j

  6. Slide 6: Ganajur Main, Karajgi Main and Ganajur SE Prospects

    HUT P 300 meters of strike length was delineated which is open along the strike and depth. HIGH GRADE KARAJGI MAIN P. Resource of 26800 ozs GANAJUR MAIN P. averaging 3.06 MEASURED AND g/t Au under C INDICATED JORC Indicated RESOURCE 305000 and Inferred OZS. categories OPEN PITTABLE. SIGNFICANT DEPTH

  7. Slide 7: Ganajur Main P - Typical Drill Hole Cross Section

    GANAJUR MAIN P- TYPICAL DRILL HOLE CROSS SECTION 7

  8. Slide 8: Feasibility Studies for the Ganajur Gold Project

    FEASIBILITY STUDIES FOR THE GANAJUR GOLD PROJECT: 9 DESPL commissioned SRK Mining g Services ((India)) Pvt. Ltd,, ((SRK)) in the y year 2011 to complete an updated mineral resource estimate and to undertake a Scoping Study and Preliminary Economic Assessment for the Ganajur Main Gold Deposit. 9 The

  9. Slide 9: Ore Reserves - Ganajur Main Gold Deposit

    MINERAL RESOURCE STATEMENT Classification Deposit Tonnes( Au Mt) Upgradation of Mineral Resources to Measured Oxide 0.58 2.8 Ore Reserves: Sulphide 1.70 4.0 Total Snowden has estimated 2.14 Measured 2.30 3.7 million tonnes (Mt) @ 3.63 grams per tonne (g/t) gold as Oxide 0.13 1.9 Proved Ore Reserves,

  10. Slide 10: Metallurgy and Ore Processing

    • Metallurgy: • As part of the FS significant amount of g metallurgical test work was carried out at various laboratories such as AMTEL in Canada, ALS Perth, and Brisbane in Australia and Shiva Analyticals in India. • p Flotation test results on the sulphide ore has indicated a sulphidesulphur recov

  11. Slide 11: Flow Sheet - Gold Ore Process

    GANAJUR GOLD PROJECT FLOW SHEET- GOLD ORE PROCESS 11

  12. Slide 12: Mining Method

    Mining: The mining method is conventional open pit mining with load, haul and drill blast activities performed by an experienced mining contractor. It is planned that the mining contractor will buy b k the back th waste t for f use ini their th i civil i il operations ti elsewhere. l h The Ganajur g

  13. Slide 13: Highlights of Feasibility Studies - Financial

    HIGHLIGHTS OF FEASIBILITY STUDIES-FINANCIAL The financial model demonstrates net cash flows of USD 133 million (M) before tax over the life of the mine (LOM). The Net Present Value (NPV) at 5% DCF is USD 91.6 M and USD 61.4 61 4 M before and after tax respectively. respectively The Internal Rate of

  14. Slide 14: Summary of Total Life of Mine Costs

    Summary of total Life of Mine costs Item Unit Value Pre-production capital USD M 46 6 46.6 Production sustaining USD M 3.1 capital Total Capital Costs USD M 49.7 Total Mining USD M 21.6 Total Processing USD M 55.8 Onsite Labour USD M 1.2 Total Operating Costs USD M 78.5 Royalties USD M 14.9 Taxation

  15. Slide 15: Break Even Analysis

    Break Even: A break even analysis after taxation was undertaken on the gold price and gold grade for NPV(Table 8). The analysis shows that the Project breaks even at a gold price of USD 701/oz of gold and gold grade of 1.90 g/t as compared to the average gold grade of 3.4 g/t at Ganajur Main Gold de

  16. Slide 16: Ganajur Gold Mine Project Approval Status

    GANAJUR GOLD MINE PROJECT APPROVAL STATUS LAND ACQUISITION PROCESS • DESPL received a Government Order (G.O.) on 28th April 2012 for allotment of 200 acres of land for the Ganajur Main Gold Mining and Ore Processing Plant. • The G.O. has also facilitated land acquisition process through Karnataka In

  17. Slide 17: Power for Plant and Mine; Water

    Power for Plant and Mine: DESPL's application for obtaining 5 MW power from a HT110 kilovolt-amperes (kV ) power line (kVa) li f from B Basavanakatti k i substation (13.24 kms) has been sanctioned by Karnataka Power Transmission Corporation Limited (KPTCL) under self execution i scheme h i February

  18. Slide 18: Railways and Environmental Clearance

    Railways: • DESPL has entered into an agreement g with the South Western Railwayy for execution of the project. SW Railway, Mysore accorded permission for laying water pipe line below the railway line near Ganajur. • We are in talks for reputed engineering companies for undertaking this job on a tur

  19. Slide 19: Ganajur Gold Project - Project Implementation Plan

    GANAJUR GOLD PROJECT- PROJECT IMPLEMENTATION PLAN Subject to grant of LoI ACTIVITY 2018 2019 2020 Q1 Q2 Q3 Q4 Q1 Q2 Q3 Q4 Q1 Q2 Q3 Q4 A. Regulatory Approvals • LOI and Approval Mining Plan by IBM • Land Acquisition • Environmental clearance (processing Plant) • Environmental clearance (Mine) • Execu

  20. Slide 20: Benefits to Be Accrued from the Projects

    The benefits to be accrued from the projects are substantial. • Deccan Gold has top p class asset base located in World Class and Geologically g y Potential Gold Province. • Dedicated and focussed Management with strong shareholder support • Gold Price 0utlook is positive with ever increasing demand

  21. Slide 21: Karajgi Main Prospect

    KARAJGI MAIN PROSPECT Karajgi Main is located at 1 km South East of Ganajur Main Prospect. It is rated by DGML as one of the most important p amongg the p prospects p in the PL block. A total of 3 auriferous zones were defined trending northwest and dipping pp g towards northeast. Zone-1 and 2 with

  22. Slide 22: Ganajur SE Prospect

    GANAJUR SE PROSPECT • Ganajur southeast prospect (GSEP) is located around 1.2 km SE off Ganajur G j Main M i prospect. t • Channel sampling and the follow up DTH, drilling carried out during th R.P. the R P tenure t h l d DESPL to helped t delineate a mineralized zone for a length of 455 metres. Enc

  23. Slide 23: Karajgi Hut Prospect

    Karajgi Hut prospect: The Karajgi Hut prospect is located around 600m NE of Karajgi Main prospect. Geological mapping during PL indicated presence of two parallel BIF bands with a g of 530 metres. Ground IP g cumulative strike length geophysical p y surveyy has indicated a moderate IP anomaly in thi

  24. Slide 24: Dharwar Cluster - DESPL's Applications

    DHARWAR CLUSTER DESPL’s Applications Extent Village Taluk sq.kms 4 1. Mangalagati Dharwad 1.5 2. Bhavihal Dharwad 3 Turkara- 3. T k 1.7 Belgaum Sigehalli 2 4. Kulavalli Belgaum Amongst these Mangalagatti PL application was granted by the Karnataka State Government on 11- 10-2012 10 2012 after obtain

  25. Slide 25: Mangalagatti and Bhavihal Prospects

    MANGALAGATTI AND BHAVIHAL PROSPECTS • Manglagatti and Bhavihal prospects are located 12 to 20 kms north of Dharwar city. • They form part of the ‘Dharwar Cluster’ of gold bearing Chert bands. The Dharwar cluster comprises of Mangalagatti SE, Mangalagatti Main, Main East and Bhavihal prospects . • Al

  26. Slide 26: Hutti-Maski Greenstone Belt Prospects

    HUTTI-MASKI GREENSTONE BELT PROSPECTS • India is a historically recognized as one of the oldest ggold miningg centers in the world. The ancient Indian gold mining history goes back to 8000 years, which is as old as the Vedic Times and evidences show that there were about 900 panning sites all over t

  27. Slide 27: Extension of Hutti Mine Lodes - Hutti North PL Block

    EXTENSION OF HUTTI MINE LODES INTO DESPL’S APPLIED PL AREA- Hutti North PL Block • Hutti North PL Block is located immediately north of the currently operating Hutti Gold Mi in Mine i Raichur R i h District Di t i t in i Karnataka. K t k • The Hutti Gold Mines has produced in excess of 1.8Moz to a v

  28. Slide 28: Hirenagnur Prospect

    Hirenagnur Prospect: • DGML considers Hirenagnur prospect as one of its best discoveries which is located 6.5 kms southeast of Hutti Gold Mines. i • Systematic exploration by means of geochemistry, ground geophysics, RC drilling and structural mapping has established a large mineralized HIRENAGNUR-Y

  29. Slide 29: Hirenagnur Prospect

    HIRENAGNUR PROSPECT DHN-11 ( ( ( ( ( ( ( ( ( DHN-10 (2m x 3.72 g/t • A preliminary resource of 6.0 tonnes of ((9m x 1.24g/t) g ) 12m x 1.5 g g/t)) Au is estimated averaging 2.72 g/t over IHN-6 10-15 m width. This is just based on 4m x 1.45 g/t very limited drilling. ( ( ( • The results of Hirenagnur

  30. Slide 30: Chinchergi-Wandalli Prospect

    Chinchergi-Wandalli Prospect 1. This block is an excellent exploration target defined by DGML as a result of extensive geochemical exploration, geological mapping, ground magnetic survey and limited Reverse Circulation drilling. 2. DGML targeted a part of the major WNW trending Chinchergi- Amareshwa

  31. Slide 31: Yatkal Prospect

    YATKAL PROSPECT Yatkal Prospect is situated along the southern margin of the North Huttti R.P. Block and gold is found in the granites intruding the Hutti volcanic belt. Yatkal prospect is situated 10 kms south-east of Hutti. Gold mineralization is noticed in quartz veins emplaced along sheared and

  32. Slide 32: Prospects in South Hutti Block

    PROSPECTS IN SOUTH HUTTI BLOCK The south Hutti RP block originally covered 315 sq km to the south of Hutti Gold Mines During the RP tenure the following studies were carried out : • Data compilation of all previous exploration and ancient mine sites • Comprehensive stream geochemical sampling over t