Unigold Inc. · TSXV:UGD

Unigold — Investor Presentation (October 2026)

23 slides from Unigold's investor presentation, October 2026

  1. Slide 1: Moving to Development in the Caribbean

    TSX.V: UGD FSE: UGB1 CORPORATE PRESENTATION ⏐ CANADA MOVING TO DEVELOPMENT IN THE CARIBBEAN October 2026

  2. Slide 2: Forward Looking Statements

    Forward Looking Statements Certain statements contained in this presentation, including statements regarding events and financial trends that may affect our future operating results, financial position and cash flows, may constitute forward-looking statements within the meaning of the federal securi

  3. Slide 3: Why Invest in Unigold

    WHY INVEST IN UNIGOLD OXIDE PROJECT PRODUCTION Low CapEx TARGETS (US$36MM), low Conceptual annual impact, fast production is recoveries, quick targeted at 50,000oz build (12 months expanding to 150,000 estimated) low AISC oz as sulphide pit (US$829) ramps up PATH TO PRODUCTION SULPHIDE PROJECT STRON

  4. Slide 4: Capital Structure

    CAPITAL STRUCTURE Unilateral decision by President to stop all work on Goldquest Romero As at Oct 30, 2025 Property – decision does TSX.V: UGD not apply to Unigold or Neita Property Shares Outstanding 338,803,817 Warrants (Sep 2027, avg $0.16) 1,400,000 Warrants (Feb 2028, avg $0.22) 4,083,500 Warra

  5. Slide 5: CSR Programs are Important

    CSR Programs are Important REFORESTATION URBAN DEVELOPMENT Tree nursery in Restauracion has New children’s play capacity for 450,000 areas and fitness seedlings per year. zones in Central Park Reforestation of the Repair and Neita River Valley replacement of underway In water mains, road TECHNICAL C

  6. Slide 6: Location and Infrastructure

    LOCATION AND INFRASTRUCTURE Unigold holds two Mineral Exploration Concessions in the DR:: • Neita Norte • Neita Sur Closest port is at Monte Cristi, (80 km north) or Puerto Plata (190 km northeast) Closest international airport is at Puerto Plata or Santiago (160 km east) Properties are accessed by

  7. Slide 7: Neita Sur Concession Area - 9,990 Ha

    Neita Sur Concession Area - 9,990 Ha 5 Km Candelones Oxide Reserves Lomita Piña Sulphide Resources 2.291 million oz M&I 0.203 million oz Inferred

  8. Slide 8: Neita Sur Concession Area - Exploration Targets

    Neita Sur Concession Area - Exploration Targets

  9. Slide 9: Oxide Target

    OXIDE TARGET Candelones Hill Looking South Open Pit Area Heap Leach Area

  10. Slide 10: Sulphide Deposit

    SULPHIDE DEPOSIT The Sulphide Resources represent an opportunity to significantly extend the operations at Candelones. Sulphides have about 2.3 New Zone million ounces in M&I (@ Oxide (outside of US$3500/oz) Project resource envelope) Open Pit Resources are constrained by drilling not geology – mine

  11. Slide 11: Candelones Deposit

    CANDELONES DEPOSIT There are two 16 m @ 10.78 g/t Au distinct projects at Candelones: • Oxides at surface Candelones Main: Oxides and • Sulphides underlying sulphides to the east Candelones Extension: Sulphides, possible oxides further to the east

  12. Slide 12: Candelones Sulphide Deposit

    CANDELONES SULPHIDE DEPOSIT Significant Intersections from drilling 2016-2021 Target A Target B Target C • 30.0 m @9.02 g/t Au, 0.6% Cu • 18.5 m @ 10.18 g/t Au, 1.52% Zn • 34.9 m @ 6.19 g/t Au, 0.6% Cu • 7.0m @ 21.9 g/t Au, 2.7% Cu • 15.8 m @ 11.36 g/t Au, 0.4% Cu • 34.0 m @ 4.15 g/t Au, 0.4% Cu • 1

  13. Slide 13: 2026 Mineral Resource Estimate (US$3500/oz)

    2026 Mineral Resource Estimate (US$3500/oz) Contained Total Gold Silver Copper Contained Contained Category Copper Tonnes (g/t) (g/t) (%) Gold (Koz) Silver (Koz) (Klbs) Measured 31,001,872 1.13 2.13 0.10 1,125 2,127 71,794 Indicated 38,133,903 0.95 1.75 0.07 1,167 2,150 60,148 M+I 69,135,774 1.03 1.

  14. Slide 14: Candelones Sulphide Resource

    Candelones Sulphide Resource • Resource modelling and estimate completed in 2026 used US$3500/oz gold • Deepest drilling approx. 425 m below surface; deposit is open to depth Red > 2 g/t Au Purple > 5 g/t Au • Drilling in 2021 extended mineralization to the East (intersected 116.5 m returning 0.84 g

  15. Slide 15: Sulphide Project Design Parameters

    Sulphide Project Design Parameters No Economic Studies have been completed Total gold produced (oz) 1.5 million to 2.0 million Projected average Gold recovery (%) 90% to 95% Projected average annual gold produced (oz) 125,000 to 175,000 Projected total initial Capex (US$) $250 to $400 million Projec

  16. Slide 16: Exploration Targets

    EXPLORATION TARGETS Drilling to Date Target # metres Candelones Main 222 30,689 Extension 225 82,198 Connector 106 12,380 Total 553 125,267 Neita Sur - other NEITA NORTE targets 120 28,624 Neita Norte - other NEITA SUR targets 21 4,559 Total 694 158,450 Other Exploration Work Surface trenching (metr

  17. Slide 17: Neita Norte Concession

    NEITA NORTE CONCESSION 2024 option Agreement with Barrick Unigold granted Barrick the exclusive option to acquire a 60% undivided interest in the Neita Norte Exploration Concession: 1. US$2.5 million minimum expenditures over the first three years, 2. US$8 million minimum expenditures over six years

  18. Slide 18: 2027 Key Drivers of Share Price Performance

    2027 Key Drivers of Share price Performance • Sulphide drilling to commence in Q4 2026 and continue throughout H1 2027 • Sulphide project PFS in Q2 2027 • Initiation of ESIA in Q1 2027 when design parameters and alternative surface infrastructure areas are identified • Exploration drilling in latter

  19. Slide 19: Appendices and Notes

    Pu UNIGOLD Appendices and Notes

  20. Slide 20: Notes relating to 2026 Mineral Resource Estimate

    Notes relating to 2026 Mineral Resource Estimate 1. The Mineral Resource Estimate used a marginal NSR cut-off of US$32.75/t for the conceptual open pit evaluation of sulphides and transition material, and US$23.75/t for Oxide material, while a marginal NSR cut-off of US$92.75/t was applied to the co

  21. Slide 21: Management

    MANAGEMENT Joseph Hamilton, P. Geo, CFA Ramon Tapia Donna McLean Chairman of the Board of Directors Country Director Chief Financial Officer and Chief Executive Officer Joe is a Professional Geologist with over 35 years of experience in mineral Sr. Ramón Tapia is Country Director in the exploration,

  22. Slide 22: Board of Directors

    BOARD OF DIRECTORS Joseph Hamilton, Joseph Del Campo, CPA, Steven Haggarty, P.Eng. Osvaldo Oller Juana Barcelo P. Geo CMA Director Director Director Chairman of the Board of Director Mr. Haggarty is the Mr. Oller is the Vice Ms. Barcelo is an experienced business and Directors and Chief Executive Au

  23. Slide 23: Contact Information

    unigoldinc.com TSX.V: UGD unigoldinc.com CONTACT INFORMATION Ste. 1800 - 372 Bay St. Joseph Hamilton Toronto, Canada, M5H 2W9 Chairman & CEO [email protected]

Unigold — Investor Presentation (October 2026) on 6ix