Nuenergy Gas Limited · ASX:NGY

Nuenergy Gas — Investor Presentation (October 2012)

15 slides from Nuenergy Gas's investor presentation, Oct 8, 2012

  1. Slide 1: Independent Gas in Place Certification of Shale Gas Resource in Indonesian PSCs

    ABN 50 009 126 238 ASX ANNOUNCEMENT 8 October 2012 For personal use only  INDEPENDENT GAS IN PLACE CERTIFICATION OF SHALE GAS RESOURCE PRESENCE IN INDONESIAN PRODUCTION SHARING CONTRACTS (PSCs)  PROGRESS ON MUARA ENIM PILOT WELL DEVELOPMENT  PT PERUSAHAAN LISTRIK NEGARA (PLN) CONFIRMS INTEREST IN

  2. Slide 2: Location Map and Pilot Program Update

    ABN 50 009 126 238 NuEnergy has the capability and advantage to commercialise these additional resources considering the strategic location of the PSCs. All of NuEnergy’s Indonesian PSCs are adjacent to major gas pipeline infrastructure connected to the following significant undersupplied gas market

  3. Slide 3: Update - Sale of Power from Pilot Development Site

    ABN 50 009 126 238 UPDATE - SALE OF POWER FROM PILOT DEVELOPMENT SITE NuEnergy is planning to install a small scale power generation unit at the ME Well#2 site for self-generation and to enable early revenue from sale of surplus power into the local power grid. For personal use only The Indonesian N

  4. Slide 4: On Track in Indonesia & East Africa to Generate Shareholder Value

    For personal use only On Track in Indonesia & East Africa to Generate Shareholder Value October 2012 1

  5. Slide 5: Investment Highlights

    Investment Highlights • Strategically positioned CBM acreage - 3 Production Sharing Contracts (PSCs) adjacent to major domestic & export gas pipelines, power infrastructure and under supplied gas markets in the prospective Indonesian South Sumatra coal For personal use only basin. Other CBM majors (

  6. Slide 6: Company Summary

    Company Summary INDONESIA Shares on Issue/Unlisted South Sumatra Basin PSCs: 200m/18.3m For personal use only Options Muara Enim (ME) (40% participating share, Partner: PERTAMINA) (Ordinary Shares – ASX:NGY) • Completed two core wells . Conversion of CBM well #2 for pilot Market Cap at $0.10/Share $

  7. Slide 7: Strategy to Unlock Value

    Strategy to Unlock Value Generate Proof of Resource & Capture PSC Upside For personal use only NSAI Resource • NSAI resource certification – complete Certification Announcement • Pilot Testing to show permeability – Q4 2012 • Release Pilot Development Project and up-scaled gas development economics

  8. Slide 8: Board & Senior Management

    Board & Senior Management Graeme Robertson – Chairman and Non Executive Director BA, FAICD, MAIE • Over 30 years experience in the coal, infrastructure and power development industries. CEO and Managing Director of New Hope For personal use only Corporation 1987–2005 (ASX:NHC) • During this period h

  9. Slide 9: Exploration & Production

    For personal use only Exploration & Production Indonesia East Africa 6

  10. Slide 10: Indonesia – Strategic PSC Location / High Prices

    Indonesia – Strategic PSC Location / High Prices • Major gas infrastructure connects the PSCs to the undersupplied Java, Singapore and Chevron Duri steam flood gas markets • For personal use only The export and domestic markets to which NuEnergy’s PSCs are connected to via pipeline yield netback pro

  11. Slide 11: Indonesia Operations – South Sumatra Status

    Indonesia Operations – South Sumatra Status Results to date: • Positive gas content results of 115 to 145 scf/t (higher than For personal use only both the Powder River Basin in the US and the Western Canadian Sedimentary Basin) support the planned development of a pilot production plant • Muara Eni

  12. Slide 12: East Africa Operations – Tanzania Status Update

    East Africa Operations – Tanzania Status Update • NuEnergy has completed JV agreements with: 1. Tancoal Energy Ltd (a PPP of Intra Energy Corporation For personal use only (ASX:IEC) and the National Development Corporation (NDC) of Tanzania) 2. Tanzacoal East Africa Mining Ltd (a subsidiary of IEC a

  13. Slide 13: East Africa Operations – Malawi Status Update

    East Africa Operations – Malawi Status Update Malawi: For personal use only • NGY has a 100% participating interest in Exclusive Prospecting Licence (EPL0360/12) covering 346 km2 in the south of Malawi • The license covers both CBM and shale gas exploration • Past geological studies show in this EPL

  14. Slide 14: Thank-You

    For personal use only NGY drill site Muara Enim THANK-YOU NGY drill site Tanzania Radial Jetting unit – ME Pilot Well 11

  15. Slide 15: Disclaimer

    Disclaimer • This presentation has been prepared by NuEnergy Capital Limited (“NuEnergy” or the “Company”) and is being provided for For personal use only the sole purpose of providing preliminary background financial, operational and other information to enable shareholders and/or prospective inves

NuEnergy Gas — Investor Presentation (October 2012) on 6ix