Markwest Energy Partners LP — Hart's Marcellus Midstream Conference 2012
14 slides from Markwest Energy Partners LP's conference presentation, Mar 20, 2012
Slide 1: Hart's Marcellus Midstream Conference
Hart’s Marcellus Midstream Conference Randy Nickerson Senior VP and Chief Commercial Officer March 2012
Slide 2: Forward-Looking Statements
Forward-Looking Statements This presentation contains forward-looking statements and information. These forward-looking statements, which in many instances can be identified by words like “could,” “may,” “will,” “should,” “expects,” “plans,” “project,” “anticipates,” “believes,” “planned,” “proposed
Slide 3: Geographic Footprint
Geographic Footprint UTICA • Joint Venture with EMG • Under construction: • 200 MMcf/d cryogenic processing complex in Harrison County, Ohio • 100,000 Bbl/d fractionation, storage, and marketing complex in Harrison County • Noble County processing complex SOUTHWEST • Granite Wash, Woodford, Cotton V
Slide 4: Growth Driven by Customer Satisfaction
Growth Driven by Customer Satisfaction 4 MarkWest Ranked #1 in Natural Gas Midstream Services Customer Satisfaction EnergyPoint Research, Inc. 2011 Customer Satisfaction Survey
Slide 5: MarkWest Liberty Marcellus Project Schedule
MarkWest Liberty Marcellus Project Schedule 5 Houston I, II, III Houston Processing and Fractionation Complex Houston I, II, and III 355 MMcf/d C3+ Fractionation 60,000 Bbl/d C3 pipeline TEPPCO Deliveries NGL Storage 1.3 MM Bbls Truck Loading 8 Bays Under Construction Rail Loading (2Q12) 200 Rail ca
Slide 6: Houston Processing and Fractionation Complex
Houston Processing and Fractionation Complex 6
Slide 7: Majorsville Processing and Fractionation Complex
Majorsville Processing and Fractionation Complex 7
Slide 8: MarkWest Liberty has the ability to recover ethane at all of its processing plants
MarkWest Liberty has the ability to recover ethane at all of its processing plants and to transport the ethane to de-ethanization facilities via its extensive NGL gathering system • MarkWest Liberty is constructing three large de-ethanizers at its Houston and Majorsville processing complexes • The f
Slide 9: Increasing Demand for US Ethane
Increasing Demand for US Ethane 9 US Ethylene Industry's Max Capability to Crack Ethane (1000 BPD) 0 200 400 600 800 1,000 1,200 1,400 1,600 1,800 2,000 2011 2012 2013 2014 2015 2016 2017 2018 2019 2020 Low Probability New Plants High Probability New Plants Converisons/Expansions/Restarts 2011 C2 Cr
Slide 10: Project Mariner: A Comprehensive Solution
Project Mariner: A Comprehensive Solution 10 MarkWest Houston Fractionator Mariner East Mariner West New MarkWest Liberty Pipeline Existing Sunoco Pipeline Existing Sunoco Pipeline Sarnia Pittsburgh Philadelphia Proposed Shell Ethane Cracker
Slide 11: Mariner East: An Ethane and Propane Solution
Mariner East: An Ethane and Propane Solution • Mariner East is a scalable project that can deliver ethane and propane to attractive North America and international NGL markets • Mariner East would transport a mixed E/P stream to Marcus Hook (Philadelphia) where the E/P mix would be fractionated into
Slide 12: MarkWest Utica Overview
MarkWest Utica Overview 12 Harrison Processing and Fractionation Complex Under Construction Harrison I (3Q12) 40 MMcf/d Harrison II (1Q13) 125 MMcf/d Harrison III (2013) 200 MMcf/d C3+ Fractionation (4Q13) 60,000 Bbl/d C3 pipeline (4Q13) TEPPCO Deliveries De-ethanization (1Q14) 40,000 Bbl/d Truck Lo
Slide 13: MarkWest is the Midstream Leader in Northeast Shales
MarkWest is the Midstream Leader in Northeast Shales 13 Utica Shale Marcellus Shale Huron Shale
Slide 14: 1515 Arapahoe Street Tower 1, Suite 1600 Denver, Colorado 202 Phone: 303-925- 9200 Investor
1515 Arapahoe Street Tower 1, Suite 1600 Denver, Colorado 80202 Phone: 303-925- 9200 Investor Relations: 866-858-0482 Email: [email protected] Website: www.markwest.com 14
MarkWest Energy Partners — Hart's Marcellus Midstream Conference 2012 on 6ix