Arya Resources Ltd · TSXV:RBZ

Arya Resources — Investor Presentation (March 2023)

28 slides from Arya Resources's investor presentation, March 2023

  1. Slide 1: Green Energy for the Future

    TSX-V: RBZ CORPORATE PRESENTATION GREEN ENERGY FOR THE FUTURE MARCH 2023

  2. Slide 2: Disclaimer

    Disclaimer No stock exchange, securities commission, or other regulatory authority has approved or disapproved the information contained in this presentation. This presentation includes certain “forward-looking statements.” All statements other than statements of historical fact included in this pre

  3. Slide 3: Dunlop Class 1 Nickel-Sulphide Deposit

    Dunlop Class 1 Nickel- Sulphide Deposit Nickel, Copper, Cobalt & Platinum-Group Elements (PGE) SASKATCHEWAN, CANADA Carbon Capture and Sequestration (CCS) Potential 3

  4. Slide 4: Russian Nickel Supply Disruptions

    NICKEL FUNDAMENTALS Russian Nickel Supply Disruptions LONDON, Feb 22, 2022 (Reuters):Stocks in LME-registered warehouses have fallen to 82,314 tonnes from more NICKEL SITUATION (Source: S&P Global Platts, Feb 24, 2022) than 260,000 tonnes in April last year, and the premium for cash nickel over thre

  5. Slide 5: Saskatchewan's Resource Industry Leader in the Canadian and Global Mining Sector

    SASKATCHEWAN, CANADA Saskatchewan’s Resource Industry Leader in the Canadian and Global Mining Sector WORKFORCE Well-trained, reliable, productive SIGNIFICANT MINERAL PRODUCTION POTASH URANIUM ~30% world’s largest producer 25% of world production Dunlop Nickel Copper Project OIL NATURAL GAS 2nd larg

  6. Slide 6: Resources (Open Pit & Underground)

    DUNLOP PROJECT Resources (Open Pit & Underground) Historical non 43-101 compliant Resources++ Zones (Probable & Possible) Open Pit Tonnes Ni (%) Cu (%) CuEq (%)* Width (m) A&B 2,084,250 0.55 0.39 1.46 14.9 C 323,500 1.46 0.31 3.14 8.4 D 91,100 0.98 0.3 2.2 8.7 E 783,200 0.56 0.34 1.43 8.8 Sub-Total

  7. Slide 7: Mineral Tenure & Location

    DUNLOP PROJECT Mineral Tenure & Location Current mineral claim 2,826 acres (1,143 Ha) Planned expansion of mineral claims to Dunlop Nickel Copper Project 4,059 acres (1,643 Ha) SASKATCHEWAN Year around highway access Additional greenfield Ni-Cu projects acquisition plan(s) TSX.V: RBZ | AryaResources

  8. Slide 8: Value Proposition

    DUNLOP PROJECT Value Proposition Undervalued relative to peers Market Capitalization (C$Million)* Ni Eq Grade (%) $418 2.76% $377 0.65% $5 Underground $234 Open Pit MEDIAN = $145M 1.00% 0.74% 0.82% $95 MEDIAN = 0.36% 0.43% $52 0.30% $33 $33 $35 $35 0.21% 0.25% 0.12% Giga Clean Air Nickel Class 1 Tar

  9. Slide 9: Projected Supply Deficit of "Battery-Grade" Nickel

    DUNLOP PROJECT Projected Supply Deficit of “Battery-Grade” Nickel Surging demand for nickel sulphide Nickel listed as ‘critical’ in Canada’s 1.83 mt 4000 New nickel supply (‘battery-grade’) for energy storage uses, Critical Mineral List 2021 needed by 2040 especially electric vehicles 630 kt 3500 Ne

  10. Slide 10: Battery Boost

    DUNLOP PROJECT Battery Boost Demand from electric vehicle batteries will spur a group of metals 2019 v 2030 demand growth Nickel 14.0 Aluminum 14.0 Phosphorus 13.0 Iron 13.0 Copper 10.0 Graphite 10.0 Lithium 9.0 Cobalt 3.0 Manganese 3.0 Source: Bloomberg NEF TSX.V: RBZ | AryaResourcesLtd.com | GREEN

  11. Slide 11: Nickel Stats

    NICKEL FUNDAMENTALS Nickel Stats (Three-month nickel on the London Metal Exchange briefly jumped to a record high on March 8, 2022 above $100,000 per tonne from $20,000 per tonne in January, 2022) TSX.V: RBZ | AryaResourcesLtd.com | GREEN ENERGY FOR THE FUTURE 12

  12. Slide 12: The Green Choice for Nickel Potential

    DUNLOP PROJECT The Green Choice for Nickel Potential  Lowest carbon intensity in global nickel industry  Non acid-generating host rock  No toxic heavy-metal leaching  Potential to lower carbon footprint based on CO2 sequestration in tailings: Net Carbon Negative or Carbon Neutral TSX.V: RBZ | Ar

  13. Slide 13: Key Lake Southwest, Haultain and Li/REE Projects

    Key Lake Southwest (KLSW), Haultain and Li/REE Projects Uranium SASKATCHEWAN, CANADA 14

  14. Slide 14: The Uranium Market

    URANIUM FUNDAMENTALS The Uranium Market Nuclear needs to double by 2050 to achieve the Paris Accord 1.5°C goal Nuclear energy now provides about 10% of the world’s electricity from Reactors are also critical for marine propulsion where it has played an 443 power reactors. important role in the world

  15. Slide 15: The Uranium Market

    URANIUM FUNDAMENTALS The Uranium Market In addition to the reactors currently operating, there are over 50 (the exact number varies slightly according to sources3,4) and more than 425 either planned or proposed, including a $1 billion project in Wyoming funded by Bill Gates and Warren Buffett5. USA2

  16. Slide 16: Nuclear Power Demand Continues to Increase

    URANIUM FUNDAMENTALS Nuclear Power Demand Continues to Increase Uranium named as the No.1 investment Morgan Stanley’s Commodity Research has named Uranium as the No. 1 Nuclear power capacity and uranium investment for the next 12 months1 demand is greater now than ever, 1 Source: mining.com August 1

  17. Slide 17: The Uranium Market

    URANIUM FUNDAMENTALS The Uranium Market Reactor Builds at 25 year high 437 Current Reactors in Operation +59 Under Construction +89 Planned +340 Proposed More reactors operating now than in any other time in history RUSSIA: 46 Most Japanese reactors EUROPE: 23 coming back online due to strong regula

  18. Slide 18: World Energy Crisis

    URANIUM FUNDAMENTALS World Energy Crisis Facing Energy Crisis, Germans, Warily, Give Analysis: France braces for uncertain Nuclear a Second Look winter as nuclar power shortage looms Global Energy Crisis Spurs a Japan turns back to nuclear Revival of Nuclear Power in Asia power in significant policy

  19. Slide 19: The Athabasca Basin, Saskatchewan

    URANIUM CLAIMS The Athabasca Basin, Saskatchewan Project Location The Athabasca Basin region is home to 10 of the 15 highest grade uranium deposits in the world, with about 20 times the international average purity1. Discovered in the 1940s, the area has been in active production for over 60 years S

  20. Slide 20: Location

    URANIUM CLAIMS Location Athabasca Basin, Saskatchewan KLSW Haultain Li/REE TSX.V: RBZ | AryaResourcesLtd.com | GREEN ENERGY FOR THE FUTURE 21

  21. Slide 21: Haultain Project

    URANIUM CLAIMS Haultain Project Airborne Magnetics Current mineral claim 20,625 acres (8,347 Hectares) TSX.V: RBZ | AryaResourcesLtd.com | GREEN ENERGY FOR THE FUTURE 22

  22. Slide 22: Key Lake Southwest (KLSW)

    URANIUM CLAIMS Key Lake Southwest (KLSW) Historic Work Compilation map Airborne Conductive trend Radiometric anomaly Current mineral claim Rock Type boundary 13,133 acres (5,315 Hectares) Area of elevated radon in water Shear Zone or structural lineament TSX.V: RBZ | AryaResourcesLtd.com | GREEN ENE

  23. Slide 23: Wedge Lake Gold

    Wedge Lake Gold SASKATCHEWAN, CANADA 24

  24. Slide 24: Wedge Lake, Saskatchewan, Canada

    WEDGE LAKE Wedge Lake, Saskatchewan, Canada Location Current mineral claim 2,974 acres (1,203 Ha) Wedge Lake Year around highway access Option to Earn 100%: SASKATCHEWAN 105,000 Cash / 5 Years $1,000,000 Exploration Expenditures / 5 Yrs. 1MM Common Shares / 5 Yrs. 2.5% NSR (1% at $1MM) TSX.V: RBZ |

  25. Slide 25: Gold Deposit Expansion Potential

    WEDGE LAKE Gold Deposit Expansion Potential 3,900 m Strike Length Twin zone Gold Deposit (450 m strike length): • 101,250 Au Oz @ 5.15 g/t Au* Several high priority targets over the remaining 3,450 m strike length: T-6 Zone drill results include: • 14.23 g/t Au over 26.6 m • 52.45 g/t Au over 1.5 m

  26. Slide 26: Capital Structure

    CORPORATE Capital Structure IPO Price $ 0.125 CPC Common Shares++ 4,013,329 ++ CPC 25% escrow release 503,332 ++ CPC 75% escrow balance 1,509,997 Financing Shares (NFT) 19,330,000 Financing Shares (FT) 2,000,000 Basic Issued and Outstanding 25,409,995 Warrants* 4,080,000 Fully Diluted** 30,387,595 *

  27. Slide 27: Management / Directors Biographies

    CORPORATE Management / Directors Biographies Lance Morginn Rasool Mohammad Paul Sorbara Director President, Chief Executive Officer Director Mr. Morginn served as the Chief Executive Officer and and Director Mr. Sorbara, Founder, Director President of Golden Goliath Director of Blockchain since Nove

  28. Slide 28: Management / Directors Biographies

    CORPORATE Management / Directors Biographies Robert Webb Oliver Foeste, CPA, CA Director Chief Financial Officer Mr. Foeste holds a Bachelor of Commerce degree (with distinction) from the University of Robert joined the Government of Canada in 1990 holding positions as Canada’s Science Victoria (200

Arya Resources — Investor Presentation (March 2023) on 6ix