Rowan Companies plc

Rowan Companies — Raymond James Institutional Investor Conference 2009

30 slides from Rowan Companies's conference presentation, Mar 10, 2009

  1. Slide 1: Rowan Companies, Inc. at Raymond James Institutional Investor Conference

    Slide 1: Rowan Companies, Inc. at Raymond James Institutional Investor Conference

    Rowan Companies, Inc. Matt Ralls, President & CEO Raymond James Institutional Investor Conference March 10, 2009

  2. Slide 2: Forward Looking Statements

    Slide 2: Forward Looking Statements

    2 Forward Looking Statements This report contains forward looking statements within the meaning of the Private Securities Litigation Reform Act of 1995, including, without limitation, statements as to the expectations, beliefs and future expected financial performance of the Company that are based o

  3. Slide 3: Company and Strategy Overview; Operations Review; LeTourneau Technologies

    Slide 3: Company and Strategy Overview; Operations Review; LeTourneau Technologies

    3 Company and Strategy Overview Operations Review LeTourneau Technologies Strengths and Growth Trends

  4. Slide 4: Offshore Drilling, Land Drilling and Manufacturing Divisions

    Slide 4: Offshore Drilling, Land Drilling and Manufacturing Divisions

    4 Offshore Drilling Land Drilling LTI Offshore Products LTI Drilling Systems LTI Mining Products Concentrate on the high-spec, premium jack-up market and own a manufacturing division that supports our drilling operations. Manufacturing LTI Steel Products

  5. Slide 5: Revenue Breakdown By Segment

    Slide 5: Revenue Breakdown By Segment

    5 Revenue Breakdown By Segment Offshore 60% Manufacturing 29% Offshore 57% Manufacturing 32% 2006 2007 2008 Offshore 55% Manufacturing 34% Land 11% Land 11% Land 11%

  6. Slide 6: EBITDA Breakdown By Segment

    Slide 6: EBITDA Breakdown By Segment

    6 Our Core Business EBITDA Breakdown By Segment Offshore 83% Manufacturing 9% Offshore 79% Manufacturing 11% 2006 2007 2008 Offshore 79% Manufacturing 11% Land 8% Land 10% Land 10%

  7. Slide 7: Investment Highlights

    Slide 7: Investment Highlights

    7 Investment Highlights State-of-the-Art Equipment Own 10 of the 25 high-spec jack-ups in the world today Youngest jack-up fleet among our principal competitors Operational Excellence Highly skilled, loyal workforce and experienced leadership Our customers come to us to drill their most challenging

  8. Slide 8: Our Priorities

    Slide 8: Our Priorities

    8 Our Priorities Operational Execution Safety, health and environmental compliance Technology leadership Industry-leading utilization Financial Discipline Reduce company-wide operating and overhead costs Focus on liquidity and capital efficiency Discontinued quarterly cash dividend Newbuild cancella

  9. Slide 9: Manufacturing Objectives

    Slide 9: Manufacturing Objectives

    9 Manufacturing Objectives Manage LTI for an eventual monetization Missed the window in 2008 Relative dependence on rig construction means delaying until there is greater visibility Serve global markets with excellent product slate Strong market acceptance of LTI jack-up designs Developing a very co

  10. Slide 10: High Spec Jack-up Rigs

    Slide 10: High Spec Jack-up Rigs

    High Spec Jack-up Rigs 22 jack-up rigs working in the U.S. Gulf of Mexico, the Middle East, North Sea and West Africa 19 premium cantilever jack-up rigs 3 conventional jack-up rigs with skid base capability Capable of drilling to depths of up to 35,000 feet in up to 550 feet of water 4Q08 Average da

  11. Slide 11: High-spec Jack-up Fleet

    Slide 11: High-spec Jack-up Fleet

    11 High-spec Jack-up Fleet 6 additional rigs under newbuild program Increasing capabilities to meet our customer's needs for completing the deepest drilling in the toughest environments Gorilla Class 3 Rigs 300-350 ft. 116-C 7 Rigs 350 ft. Slot 2 Rigs 250-300 ft. Slot 1 Rig TARZAN CLASS 4 Rigs Super

  12. Slide 12: High Spec Jack-up Rigs Worldwide

    Slide 12: High Spec Jack-up Rigs Worldwide

    High Spec* Jack-up Rigs 437 Total Rigs 25 High Spec Rigs 94% 6% 25 High Spec Rigs 40% 60% 10 Rowan Rigs * High Spec jack-up rigs are defined as 2M pound hookload or greater Other 12

  13. Slide 13: TARZAN Class

    Slide 13: TARZAN Class

    TARZAN Class J.P. Bussell 13 196' 215'-4" Hookload: 2M lbs Cantilever Reach: 60' Leg Length: 445' # Mudpumps / HP: 3 / 3,000 HP ea. Total Engine HP: 12,900 Variable Load Drilling: 7.7M lbs Tarzan Class

  14. Slide 14: EXL Class Newbuild Jack-up

    Slide 14: EXL Class Newbuild Jack-up

    EXL Class Newbuild Jack-up 14 206' 243' Hookload: 2M lbs Cantilever Reach: 70' Leg Length: 477' # Mudpumps / HP: 3 / 2,200 HP ea. Total Engine HP: 12,900 Variable Load Drilling: 7.3M lbs Tarzan Class EXL Class

  15. Slide 15: 240-C Class

    Slide 15: 240-C Class

    240-C Class Rowan Mississippi 15 220' 228' Hookload: 2.5M lbs Cantilever Reach: 80' Leg Length: 491' # Mudpumps / HP: 3 / 3,000 HP ea. Total Engine HP: 15,050 Variable Load Drilling: 9.7M lbs Tarzan Class EXL Class 240 C Class

  16. Slide 16: Super Gorilla Class

    Slide 16: Super Gorilla Class

    Hookload: 2.5M lbs Cantilever Reach: 100' Leg Length: 713' # Mudpumps / HP: 3 / 3,000 HP ea. Total Engine HP: 15,050 Variable Load Drilling: 11.9M lbs Super Gorilla Bob Palmer 16 306' 300' Tarzan Class EXL Class 240 C Class Super Gorilla

  17. Slide 17: Superior Day Rates

    Slide 17: Superior Day Rates

    17 Rowan's state of the art technology and high spec rig fleet combined with our qualified and well trained crews gives us an edge over our competition. Superior Day Rates Includes data supplied by ODS-Petrodata, Inc; Copyright 2009 and Rowan Companies, Inc. as of 02/25/09

  18. Slide 18: Newbuild Plan Revisions

    Slide 18: Newbuild Plan Revisions

    18 Newbuild Plan Revisions 2 0 0 9 2 0 1 0 2 0 1 1 Ralph Coffman (240-C #2) Q4 2009 Rowan EXL #2 Q3 2010 Rowan EXL #1 Q2 2010 Rowan EXL #3 Q4 2010 Rowan EXL #4 TBD Joe Douglas (240-C #3) TBD Construction Halted Construction Halted

  19. Slide 19: 2009 Capital Expenditure Guidance

    Slide 19: 2009 Capital Expenditure Guidance

    2009 Capital Expenditure Guidance 19 Estimated capital expenditures total $560 million Newbuilds - EXLs (4) Newbuilds - 240Cs (2) Maintenance Contractually- Required Upgrades Other

  20. Slide 20: Fleet Contract Backlog

    Slide 20: Fleet Contract Backlog

    20 Fleet Contract Backlog Total backlog of approximately $1.7 billion

  21. Slide 21: Offshore Drilling Expenses

    Slide 21: Offshore Drilling Expenses

    Offshore Drilling Expenses 21 (Millions) * 2009 Operating costs assumes a 10% increase in insurance cost; actual amount is unknown at this time.

  22. Slide 22: Premium Land Rigs

    Slide 22: Premium Land Rigs

    22 Premium Land Rigs 32 land rigs in Texas, Oklahoma and Alaska; 28 currently marketed Land Rig 86 was delivered in January and Land Rig 87 is under construction and should begin operations during the first quarter of 2009 26 of our land rigs are 2,000 HP or greater and capable of drilling wells to

  23. Slide 23: LeTourneau Technologies, Inc.

    Slide 23: LeTourneau Technologies, Inc.

    LeTourneau Technologies, Inc. 23 One of only five mills in the world producing high-strength plate steel with the thickness required for jack-up elevating racks Steel Products Dominant market share for world's largest front loaders Large, consistent, profitable after market business Mining Products

  24. Slide 24: Growth Driven by External Sales

    Slide 24: Growth Driven by External Sales

    24 Growth Driven by External Sales 2003 - 2009 Revenues ($MM) $399 $660 $971 Two thirds of revenues are from external customers $263 $250 $1,143 $715 * 2009 Budgeted Revenues and Margin

  25. Slide 25: Newbuild Jack-ups: 1998-2008

    Slide 25: Newbuild Jack-ups: 1998-2008

    1998 1999 2000 2001 2002 2003 2004 2005 2006 2007 2008 Newbuilds 4 2 4 0 5 3 4 3 10 15 29 Supply 378 381 385 386 388 388 386 388 392 405 425 Attrition 1 1 1 1 3 5 7 7 2 1 4 Newbuild Jack-ups: 1998-2008 Newbuild Jack-ups / Attrition Total Fleet Attrition Total Fleet 22% of the newbuilds over the last

  26. Slide 26: Newbuild Jack-ups: 1998-2011

    Slide 26: Newbuild Jack-ups: 1998-2011

    1998 1999 2000 2001 2002 2003 2004 2005 2006 2007 2008 2009 2010 2011 Newbuilds 4 2 4 0 5 3 4 3 10 15 29 36 26 12 Supply 378 381 385 386 388 388 386 388 392 405 425 461 487 499 Attrition 1 1 1 1 3 5 7 7 2 1 4 Projected Fleet with all newbuilds Newbuild Jack-ups: 1998-2011 Newbuild Jack-ups / Attriti

  27. Slide 27: Projected Fleet Excluding Newbuilds at Risk

    Slide 27: Projected Fleet Excluding Newbuilds at Risk

    1998 1999 2000 2001 2002 2003 2004 2005 2006 2007 2008 2009 2010 2011 Newbuilds 4 2 4 0 5 3 4 3 10 15 29 27 17 9 Supply 378 381 385 386 388 388 386 388 392 405 425 452 469 478 Attrition 1 1 1 1 3 5 7 7 2 1 4 17 0 3 Projected Fleet excluding Newbuilds at risk Newbuild Jack-ups: 1998-2011 Newbuild Jac

  28. Slide 28: Newbuild Jack-ups: 1998-2018

    Slide 28: Newbuild Jack-ups: 1998-2018

    1998 1999 2000 2001 2002 2003 2004 2005 2006 2007 2008 2009 2010 2011 2012 2013 2014 2015 2016 2017 2018 Newbuilds 4 2 4 0 5 3 4 3 10 15 29 27 17 9 Supply 378 381 385 386 388 388 386 388 392 405 425 435 452 458 455 450 440 425 411 398 387 Attrition 1 1 1 1 3 5 7 7 2 1 4 17 0 3 3 5 10 15 14 13 11 New

  29. Slide 29: Global Oil Consumption Scenarios

    Slide 29: Global Oil Consumption Scenarios

    Global Oil Consumption Scenarios 29 Source: Simmons & Company International * Based upon a company estimated decline rate of 6% Existing Production 30 mm 57 mm Additional Required Capacity (b/d)

  30. Slide 30: Rowan Companies, Inc. Investor Contact

    Slide 30: Rowan Companies, Inc. Investor Contact

    2800 Post Oak Blvd. Suite 5450 Houston, TX 77056 713.621.7800 www.rowancompanies.com Rowan Companies, Inc. Investor Contact: Suzanne M. McLeod Director, Investor Relations [email protected]

Source: SEC EDGAR · 8-K filed Mar 10, 2009

More decks from Rowan Companies plc