Brahmaputra Infrastructure Ltd. · BSE:BRAHMINFRA

Brahmaputra Infrastructure — Q4 FY2024-25 Earnings Presentation

23 slides from Brahmaputra Infrastructure's earnings presentation, May 2025

  1. Slide 1: Brahmaputra Infrastructure Limited March Quarter Audited Results

    Brahmaputra Infrastructure Limited March Quarter Audited Results FY 2024-25 – (Q-4)

  2. Slide 2: Safe Harbor

    Safe Harbor • This presentation and the accompanying slides (the “Presentation”), which have been prepared by Brahmaputra Infrastructure Limited (the “Company”), have been prepared solely for information purposes and do not constitute any offer, recommendation or invitation to purchase or subscribe

  3. Slide 3: EPC Business overview of the Company

    EPC Business overview of the Company • EPC Business : We are an Infrastructure company which provides EPC (Engineering, Procurement and Construction) services for Infrastructure Projects in India since 1998. We have the presence on PAN India basis and have a strong presence in Northern India such as

  4. Slide 4: Major ongoing EPC Projects of the Company

    Major ongoing EPC Projects of the Company • Construction of single line BG cut & cover tunnels from Ch.32075m to 32300m(approx length 225m), Ch . 41800m to 42000m (approx length 200m), Ch.47480m to Ch.47650m)approx length 170m) and Ch.48535m to 48635m (approx length 100m) in between stations Kawnpui

  5. Slide 5: Other Major ongoing EPC Projects of the Company

    Other Major ongoing EPC Projects of the Company • Protection of cutting and embankment by construction of RCC retaining wall, catch water drain, sub-surface drain, shot creting/providing concrete canvas, geo-jute textile turfing on slopes, finishing of blanketing materials etc. in between station Ka

  6. Slide 6: Other Major ongoing EPC Projects of the Company

    Other Major ongoing EPC Projects of the Company • OPERATION & MAINTENANCE OF DESCOPED LENGTH OF 2 LANE WITH PAVED SHOULDER TANOT- JAISALMER [TANK CHOWK(KM.123+550) TO JAISALMER BYPASS (KM.125.573) LENGTH -2.023 KM] OF NH-68 & 2/4 LANE WITH PAVED SHOULDER OF JAISALMER-PHALODI SECTION OF NH-11 FROM KM

  7. Slide 7: Other Major ongoing EPC Projects of the Company

    Other Major ongoing EPC Projects of the Company • Palashbari and Gumi/ Guwahati West subproject (Guwahati West) underwater riverbank protection works (Section 1) and above water riverbank protection (Section 2) (Package No.W2-PG(B)GW Lot 1) • Palashbari and Gumi/ Guwahati West subproject (Guwahati W

  8. Slide 8: Assam Hills Medical College and JLN Hospital Ajmer projects

    Construction Of Assam Hills Medical College Construction of Medicine Block at JLN & Research Institute, Diphu, Karbi Anglong. Hospital, Ajmer, Rajasthan. Construction of Pediatricks Block and multi River Bank protection/erosion control measures level parking. on the left bank pf river Subansiri adja

  9. Slide 9: Gandhinagar Railway Station and highway maintenance projects

    Major upgration of Gandhinagar (Jaipur) Railway Maintenance of National Highways from Tihu Station of Jaipur Division of North Western to Puthimari section of NH-31 in the State of Railway through EPC. Assam. Construction of single line BG cut & cover tunnels from in Short Term Improvement & Routine

  10. Slide 10: Operation & Maintenance and New BG Railway line projects

    Operation & Maintenance Of Descoped Length Of NBQ-GLPT-KYQ Doubling Project (Assam). 2 Lane With Paved Shoulder Tanot-Jaisalmer To Jaisalmer Bypass. In The State Of Rajasthan. Construction of foundation and sub structure over New BG Railway line project. pile foundation for Tall Bridge of new BG Rai

  11. Slide 11: Bridge, railway doubling and ASU Campus projects

    Construction of sub-structure and super-structure Maintenance of 3 lane Brahmaputra Bridge on pile foundation of major bridges in connection including their expansion joints & bearing, with double line work of New Bongagaon-Agthori providing all necessary signboard, road doubling project. furniture

  12. Slide 12: Real Estate Business overview

    Real Estate Business overview • Real Estate Business : In terms of Real Estates Segment Business, Company has successfully executed Housing and Commercial Projects, few of the main projects are : • Industrial Park : Brahmaputra Industrial Park is located on the northern side of the Brahmaputra river

  13. Slide 13: Shopping Mall City Centre

    Shopping Mall City Centre City Center located in Guwahati, Assam is the largest shopping centre in Northeast India with a sprawling 4 lakh sqft. space for retail, F&B, and entertainment. It provides a unique opportunity to brands by having dual entrance points from both the important roads of Guwaha

  14. Slide 14: Major Brands in Shopping Mall City Centre

    Major Brands in Shopping Mall City Centre

  15. Slide 15: Major Brands in Shopping Mall City Centre

    Major Brands in Shopping Mall City Centre

  16. Slide 16: Major Brands in Shopping Mall City Centre

    Major Brands in Shopping Mall City Centre

  17. Slide 17: Major Brands in Shopping Mall City Centre

    Major Brands in Shopping Mall City Centre

  18. Slide 18: Financial Highlights (YOY) & (QOQ) Analysis

    Financial Highlights of the Company (YOY) & (QOQ) Analysis (In Crores) Particulars ( In Crores) Q-4 Q-3 Q-o-Q FY 2024-25 FY 2023-24 Y-o-Y FY 2024-25 FY 2024-25 Growth (%) Growth (%) Total Income from 103.10 32.44 247.14 221.11 217.83% 11.78% operations (Net) Depreciation 0.34 0.35 1.49 1.75 Profit b

  19. Slide 19: Segment Results (YOY) & (QOQ) Analysis

    Segment Results of the Company (YOY) & (QOQ) Analysis (In Crores) Particulars ( In Crores) Q-4 Q-3 Q-o-Q FY 2024-25 FY 2023-24 Y-o-Y FY 2024-25 FY 2024-25 Growth (%) Growth (%) Segment Revenue EPC 97.77 25.40 285.35% 224.11 200.96 11.52% Real Estates and Other 5.33 7.05 23.02 20.15 14.26% Income Tot

  20. Slide 20: Board of Directors

    Board of Directors of the Company • Sanjeev Kumar Prithani – Joint Managing Director • Sanjay Kumar Mozika – Joint Managing Director • Raktim Acharjee – Whole Time Director • CA. Vikas Keshri– Independent Director • Lalit Kumar – Independent Director • Anju Kumari – Independent Director

  21. Slide 21: KMP's & Auditors of the Company

    KMP’S & AUDITORS OF THE COMPANY • Manoj Kumar Prithani – CEO • Raktim Acharjee – CFO • Vivek Malhotra – Company Secretary • Goyal Nagpal & Co- Statutory Auditors • Gurvinder Chopra & Co- Cost Auditors • Sachin Kumar Shrivastav – Secretarial Auditors

  22. Slide 22: Bankers

    Bankers of the Company

  23. Slide 23: For further information, please contact

    For further information, please contact: Mr. Vivek Malhotra GM ( Finance) & Company Secretary Phone : 011-42290200 Email id : [email protected]

Brahmaputra Infrastructure — Q4 FY2024-25 Earnings Presentation on 6ix