Novagold Resources Inc. · AMEX:NG

Novagold Resources — TD Securities Mining Conference 2018

38 slides from Novagold Resources's conference presentation, January 2018

  1. Slide 1: TD Securities Mining Conference

    TSX, NYSE American: NG | novagold.com | January 2018 TD Securities Mining Conference

  2. Slide 2: Cautionary Statements Regarding Forward-Looking Statements

    CAUTIONARY STATEMENTS REGARDING FORWARD-LOOKING STATEMENTS This presentation includes certain “forward-looking statements” within the meaning of applicable securities laws, including the United States Private Securities Litigation Reform Act of 1995. All statements, other than statements of historic

  3. Slide 3: What Makes NOVAGOLD Unique?

    WHAT MAKES NOVAGOLD UNIQUE? A DEVELOPMENT-STAGE COMPANY WITH TWO PROJECTS OF EXCEPTIONAL SCALE, QUALITY, AND JURISDICTIONAL SAFETY DONLIN GOLD 50/50 with Barrick Poised to be one of the largest gold producers in the world Location: Southwest Alaska GALORE CREEK 50/50 with Teck Potential to be one of

  4. Slide 4: Donlin Gold: The Right Project

    DONLIN GOLD: THE RIGHT PROJECT ARGUABLY THE MOST IMPORTANT GOLD PROJECT IN THE WORLD TODAY SIZE PARTNERSHIPS Among the largest present Strong partnerships with and/or future gold mines local stakeholders in the world JURISDICTION GRADE High-grade open- pit mine Donlin Gold Located in Alaska, one of

  5. Slide 5: Development Projects the Size of Donlin Gold Are Scarce

    DEVELOPMENT PROJECTS THE SIZE OF DONLIN GOLD ARE SCARCE A RESOURCE FOUR TIMES THE SIZE OF THE PEER GROUP AVERAGE 60 49.8 50 40 0.53 g/t 39.0 39.0 9.8 M&I Gold Resource (millions of ounces) million oz million oz 2.24 30 g/t 20 18.8 Donlin Gold Peer Group Avg. 0.52 g/t 11.5 9.5 10 8.0 8.0 0.68 6.7 0.7

  6. Slide 6: Donlin Gold: Quality Grade Double the Average Gold Deposit

    DONLIN GOLD: QUALITY GRADE DOUBLE THE AVERAGE GOLD DEPOSIT IN THE WORLD AMONG THE WORLD’S HIGHEST-GRADE OPEN PIT GOLD DEPOSITS World Donlin Gold Average Grade1 Resource Grade2 1.13g/t 2.24g/t While industry average grades are declining, Donlin Gold’s grade provides resilience through commodity price

  7. Slide 7: Expected to Be One of the Industry's Top Producing Assets

    DONLIN GOLD: EXPECTED TO BE ONE OF THE INDUSTRY’S TOP PRODUCING ASSETS A REMARKABLE RESOURCE AMONG UNDEVELOPED GOLD DEPOSITS IN THE AMERICAS Donlin Gold’s size, grade and projected 1.60 production profile clearly distinguish it from its peers 1.40 1.1 2 Projected Annual Gold Production (millions of

  8. Slide 8: Large Gold Deposits Are Critical for Sustainability of Gold Industry

    LARGE GOLD DEPOSITS ARE CRITICAL FOR THE SUSTAINABILITY OF THE GOLD INDUSTRY SCARCITY OF QUALITY ASSETS FURTHER EXACERBATED BY LONG DEVELOPMENT TIMELINES o New discoveries have become increasingly rare o Gold is an under-owned currency that enjoys a well-earned place in global finance o On the deman

  9. Slide 9: Only Undeveloped Asset in This Category in North America

    DONLIN GOLD: ONLY UNDEVELOPED ASSET IN THIS CATEGORY IN NORTH AMERICA 2016 TOP TEN GOLD PRODUCING MINES ONLY SIX MINES/PROJECTS IN THE WORLD SLATED TO PRODUCE >1M OUNCES PER YEAR 39.0Moz Donlin Gold 2.5Moz 33.0Moz Kupol Olimpiada 48.2Moz 9.5Moz 12.4Moz Muruntau Goldstrike Cortez 47.9Moz Lihir Island

  10. Slide 10: Donlin Gold: Excellent Exploration Potential

    DONLIN GOLD: EXCELLENT EXPLORATION POTENTIAL MULTIPLE DRILL PROSPECTS AND TARGETS EXIST ALONG THE 8 KM GOLD MINERALIZED TREND THE NEXT BIG GOLD DISCOVERY MAY BE AT DONLIN GOLD o From 2006 to 2011, M&I resources increased 135% (16.6Moz to 39.0Moz) through a well- executed exploration program o Future

  11. Slide 11: Partners Shared Mindset to Enhance Value and Build Optionality

    DONLIN GOLD: PARTNERS SHARED MINDSET TO ENHANCE VALUE AND BUILD OPTIONALITY BARRICK AND NOVAGOLD – PERFECTLY ALIGNED PARTNERSHIP POSITIONED TO MAXIMIZE DONLIN GOLD PROJECT OPTIMIZATION o Both partners are focused on further improving the project’s value and reducing initial capital costs: • Evaluati

  12. Slide 12: Drill Program Aimed at Further Enhancing Project Economics

    DONLIN GOLD: DRILL PROGRAM AIMED AT FURTHER ENHANCING PROJECT ECONOMICS BARRICK AND NOVAGOLD ARE FOCUSED ON CAPITALIZING ON THE FLEXIBILITY INHERENT IN DONLIN GOLD’S UNIQUE CHARACTERISTICS OF LARGE SIZE AND SUPERIOR GRADE o Selective mining has been identified as an opportunity to further improve mi

  13. Slide 13: Significant Value Upside with Higher Gold Prices

    DONLIN GOLD: SIGNIFICANT VALUE UPSIDE WITH HIGHER GOLD PRICES EXTRAORDINARY LEVERAGE TO THE GOLD PRICE NPV (US$ BILLIONS) NPV5 INCREASES ~20X $30.0 WITH ~2X INCREASE IN GOLD PRICE $27.0B o Project has a positive return that increases substantially with higher gold prices $25.0 27 YEAR MINE LIFE NPV

  14. Slide 14: Life of Mine Agreements with Alaska Native Corporations

    DONLIN GOLD: LIFE OF MINE AGREEMENTS WITH ALASKA NATIVE CORPORATIONS TIME-HONORED RELATIONSHIPS WITH STAKEHOLDERS o Donlin Gold is located on private land specifically selected for its resource development potential • ANCSA1 established 40 years ago; resolved Alaska Native land claims • Lands valuab

  15. Slide 15: Leverage in a Place Where You Can Keep the Rewards

    DONLIN GOLD: LEVERAGE IN A PLACE WHERE YOU CAN KEEP THE REWARDS AT A TIME OF EXTREME GEOPOLITICAL UNCERTAINTY, ALASKA IS WELCOMING NEW RESPONSIBLE DEVELOPMENT JURISDICTIONAL APPEAL: • Mineral potential • Established mining industry • Political and social stability • Excellent local partnerships • A

  16. Slide 16: Project Permitting Is on Track

    DONLIN GOLD: PROJECT PERMITTING IS ON TRACK THE CORPS EXPECTS TO PUBLISH THE FINAL ENVIRONMENTAL IMPACT STATEMENT IN EARLY 2018 DEVELOPMENT TIMELINE: 16 years ̴6 ̴4 27+ years ENVIRONMENTAL STUDIES 1.5 Moz/year first five full years1 EXPLORATION & CONSTRUCTION PERMITTING OPERATION 1.1 Moz/year life o

  17. Slide 17: A Thorough, Transparent, and Established Environmental Review Process

    DONLIN GOLD: A THOROUGH, TRANSPARENT, AND ESTABLISHED ENVIRONMENTAL REVIEW PROCESS SUPPORTING THE CORPS IN COMPLETING THE FINAL STEPS IN EIS PROCESS WHILE WORKING WITH ALASKA TO SECURE STATE PERMITS National Environmental Policy Act (NEPA) review nearing completion – supports agency decision- making

  18. Slide 18: Donlin Gold: Looking Ahead

    DONLIN GOLD: LOOKING AHEAD NEXT STEPS IN DONLIN GOLD’S DEVELOPMENT o Obtain federal and major state permits o Advance optimization work looking at reducing up front cost while maintaining full upside value • Use of selective mining methods • Innovative technologies, automation, modular off-site cons

  19. Slide 19: Galore Creek: A Significant Copper-Gold-Silver Asset

    GALORE CREEK: A SIGNIFICANT COPPER-GOLD-SILVER ASSET POTENTIAL TO BE ONE OF THE LARGEST, HIGHEST-QUALITY, LOWEST-COST COPPER PRODUCERS IN CANADA Copper Gold Silver 7Blbs Grade: 0.59% 5Moz Grade: 0.32g/t 102Moz Grade: 6.02g/t P&P RESERVES1 1) Galore Creek project estimates as per the pre-feasibility

  20. Slide 20: Galore Creek: Significant Upside Potential with Higher Copper Prices

    GALORE CREEK: SIGNIFICANT UPSIDE POTENTIAL WITH HIGHER COPPER PRICES PROJECT HAS POSITIVE RETURNS THAT INCREASE SIGNIFICANTLY WITH RISING COPPER PRICES NPV (US$ BILLIONS) $4.0 $3.5B $3.1B $3.0 $2.6B 18 YEAR MINE LIFE A significant NPV at 7% $2.1B copper-gold-silver NPV at 5% $2.0 $1.6B asset in Cana

  21. Slide 21: Clear Focus and Strong Funding to Execute on All Fronts

    CLEAR FOCUS AND STRONG FUNDING TO EXECUTE ON ALL FRONTS SUFFICIENT CASH ON HAND TO PROGRESS DONLIN GOLD THROUGH PERMITTING TOTAL 2017 BUDGET ($ MILLIONS)2 $27 Donlin Gold – permitting 10 $88M Donlin Gold – drill program 4 cash and term deposits1 Galore Creek 2 G&A, working capital and other 11 SPEND

  22. Slide 22: Top Institutional Shareholders

    TOP INSTITUTIONAL SHAREHOLDERS 51% OF SHARES ISSUED & OUTSTANDING HELD BY SIX LARGEST SHAREHOLDERS2 26.3% Electrum Strategic Resources LP 7.6% Fidelity Management & Research Company $1.2B 6.8% Paulson & Co. Inc. MARKET CAP1 4.5% Van Eck Associates Corporation 3.0% The Baupost Group, L.L.C. 2.7% Tocq

  23. Slide 23: Upcoming Catalysts

    UPCOMING CATALYSTS KEY COMPANY MILESTONES ON THE HORIZON o NOVAGOLD 2017 fourth quarter and year-end results o Donlin Gold drill results o Donlin Gold final EIS expected to be published by the U.S. Army Corps of Engineers o Expect receipt of Donlin Gold Record of Decision and major Federal wetlands

  24. Slide 24: The NOVAGOLD Opportunity

    THE NOVAGOLD OPPORTUNITY SAFE GEO-POLITICAL STRONG BALANCE SHEET ENVIRONMENT $88M cash + term deposits Alaska and British Columbia, as of August 31, 2017 top-rated mining jurisdictions TOP TIER ASSETS ACCOMPLISHED Donlin Gold – Large, LEADERSHIP TEAM high-grade deposit well Extensive experience adva

  25. Slide 25: Appendix

    APPENDIX

  26. Slide 26: Donlin Gold: Project Highlights

    DONLIN GOLD: PROJECT HIGHLIGHTS POISED TO BE ONE OF THE LARGEST GOLD PRODUCERS IN THE WORLD Reserves: 33.9 Moz Au (505M tonnes ore)1 Resources: 39.0 Moz M&I (inclusive of reserves) and 6.0 Moz Inferred1 Mine Life: ~27 years Production: Year 1-5,1.5 Moz/year; LOM,1.1 Moz/year Operation: Open-pit, con

  27. Slide 27: Galore Creek: Project Highlights

    GALORE CREEK: PROJECT HIGHLIGHTS POTENTIAL TO BE ONE OF CANADA'S LARGEST COPPER MINES Reserves: 6.8 Blb Cu; 5.5 Moz Au; 102 Moz Ag (528M tonnes ore)1 Resources: 8.9 Blb Cu; 8.0 Moz Au; 136 Moz Ag (inclusive of reserves)1 Mine Life: ~18 years Production: Year 1-5, 400 Mlb/year Cu; LOM, 340 Mlb/year C

  28. Slide 28: Donlin Gold: Other Permit Applications

    DONLIN GOLD: OTHER PERMIT APPLICATIONS NEARLY 100 PERMITS ARE REQUIRED Major federal permits or reviews o CWA Section 404/RHA Section 10 (USACE) o Rights of Way (BLM) o Pipeline Special Permit (PHMSA) – Public Notice Complete o PSD Air Quality Permit Review (EPA) – Completed, Permit Issued o EFH Con

  29. Slide 29: Permitting in the U.S.

    DONLIN GOLD: PERMITTING IN THE U.S. LARGE PROJECTS HAVE BEEN SUCCESSFULLY PERMITTED Project Name Location Metal Time Description • Expansion Red Dog Alaska Lead/zinc ~2 years • EIS completed in 2009 • Development started on schedule in 2010 • Expansion – new heap leach facility Fort Knox Alaska Gold

  30. Slide 30: Alaska's Mining Industry

    ALASKA’S MINING INDUSTRY MINING IS A GROWING FORCE IN ALASKA’S ECONOMY WITH SIX PRODUCING MINES AND NINE ADVANCED EXPLORATION PROJECTS Producing Mines: Fort Knox Kinross Gold Corp Red Dog Teck Resources Limited Greens Creek Hecla Mining Company Kensington Coeur Mining Inc Pogo Sumitomo Metal Mining

  31. Slide 31: Donlin Gold: Capital Expenditures

    DONLIN GOLD: CAPITAL EXPENDITURES OUR OPTIMIZATION EFFORTS ARE FOCUSED ON REDUCING UPFRONT CAPITAL WHILE MAINTAINING FULL UPSIDE VALUE Areas US$M1 Opportunities1 Mining 345 Leasing equipment ~$170M of $345M Site preparation/roads 236 Process facilities 1,326 Oxygen plant could be built by third part

  32. Slide 32: Expected to Provide Three Decades of Low Cost Production

    DONLIN GOLD: EXPECTED TO PROVIDE THREE DECADES OF LOW COST PRODUCTION LOW OPERATING CASH COSTS AND ALL-IN SUSTAINING COSTS FIRST FIVE YEARS LIFE OF MINE Cash Costs1 Per Ounce Cash Costs1 Per Ounce Open-pit mining2 133 Open-pit mining2 270 Processing 208 Processing 257 G&A, royalties, land & other3 7

  33. Slide 33: NOVAGOLD: Company History Highlights

    NOVAGOLD: COMPANY HISTORY HIGHLIGHTS THE GOLD DEVELOPMENT COMPANY FOR THE 21ST CENTURY o 1984 incorporated in Nova Scotia – Gerald McConnell as CEO leads exploration company initially focused on gold properties in Nova Scotia, later exploration expands throughout the Americas o 1998 Rick Van Nieuwen

  34. Slide 34: NOVAGOLD: The Board of Directors

    NOVAGOLD: THE BOARD OF DIRECTORS INDUSTRY LEADERS TO BRING DONLIN GOLD THROUGH PERMITTING & BEYOND Dr. Thomas Kaplan • Chairman and CIO of The Electrum Group LLC, a privately held natural resources investment management Chairman company that controls a diversified portfolio of precious and base meta

  35. Slide 35: NOVAGOLD: The Management Team

    NOVAGOLD: THE MANAGEMENT TEAM INDUSTRY LEADERS TO BRING DONLIN GOLD THROUGH PERMITTING & BEYOND • Former President of Barrick Gold North America Gregory Lang • 35+ years experience building & operating major open-pit and underground mines (Goldstrike, President and CEO Cortez, Turquoise Ridge, Bald

  36. Slide 36: NOVAGOLD: Reserve/Resource Table

    NOVAGOLD: RESERVE/RESOURCE TABLE Donlin Gold* Tonnage (100%) Grade (100%) Metal (100%) NOVAGOLD Share (50% ) GOLD Mt g/t Au koz Au koz Au Reserves1 Proven 7.7 2.32 573 286 Probable 497.1 2.08 33,276 16,638 P&P 504.8 2.09 33,849 16,924 Resources3, inclusive of Reserves Measured 7.7 2.52 626 313 Indic

  37. Slide 37: NOVAGOLD: Reserve/Resource Table (Con't)

    NOVAGOLD: RESERVE/RESOURCE TABLE (CON’T) Notes: a. These reserve and resource estimates have been prepared in accordance with NI 43-101 and the CIM Definition Standard, unless otherwise noted. b. See numbered footnotes below on resource information. c. Rounding and significant figures may result in

  38. Slide 38: Contact Us

    CONTACT US NOVAGOLD RESOURCES INC. Suite 720 – 789 West Pender Street Vancouver, BC Canada V6C 1H2 T 604 669 6227 TF 1 866 669 6227 F 604 669 6272 www.novagold.com [email protected] Mélanie Hennessey Erin O’Toole VP, Corporate Communications Senior Stakeholder Relations Specialist melanie.hennessey@

NOVAGOLD Resources — TD Securities Mining Conference 2018 on 6ix