Hindustan Zinc Limited · NSE:HINDZINC
Hindustan Zinc — Investor Presentation (February 2018)
6 slides from Hindustan Zinc's investor presentation, Feb 8, 2018
Slide 1: Analyst Meet 8 February 2018
@ Hindustan Zinc RZ vedanta transforming elements Analyst Meet 8 February 2018
Slide 2: Volume and costs
transforming elements Volume and costs iw vedanta Zinc - Lead $850/t = $950-975/t + Brownfield exploration growth to + Higher silver recovery in lead, three * Key structural initiatives on 1.5mt fumers and tailings retreatment: technology, productivity, power + Incremental MIC from all 5 mines Doubl
Slide 3: Exploration priorities
Exploration priorities @ Svedanta__ 550 200 404 140 75 146 2003-04 2016-17 Target 2016-17 2017-18 2018-19 Rampura Agucha Galena Zone Zawar New Orebodies Kayad Potential to Double R&R ¢ Current Resource 11.7Mt @ 5.3% lead, 147g/t silver ¢ Galena Zone ore lenses are open e Fast track drilling from und
Slide 4: Hindustan Zinc - A Sustainable Enterprise
Environment Health & Safety Positive water footprint 325 MW green power 9% specific energy reduction Zero occupational illness 4 fold reduction in LTIFR Annual sustainability reporting Business Model Integrated metal producer with captive power 1st quartile cost position Leader in the domestic marke
Slide 5: Zinc — Enables Rust-Free Economic Growth
Zinc — Enables Rust-Free Economic Growth ®@ Zinc is the key middle income development metal e #4 most consumed metal in the world e Cheapest way of preventing rust corrosion in steel — construction, infrastructure and transport @ Zinc demand remains robust, driven by both economic growth and increas
Slide 6: Thank you
Hindustan Zinc vedanta — Thank you
Hindustan Zinc — Investor Presentation (February 2018) on 6ix