Terramin Australia Limited · ASX:TZN
Terramin Australia — Corporate Update (February 2016)
17 slides from Terramin Australia's corporate update, Feb 17, 2016
Slide 1: Quarter 4:2015 Strathalbyn Community Consultative Committee
Quarter 4:2015 Strathalbyn Community Consultative Committee 1
Slide 2: General Update
General Update Joe Ranford General Manager Terramin general update Angas Zinc Tala Hamza Bird in Hand AZM upcoming activities Quarterly Environment Report Closure planning progress update 2
Slide 3: Angas Zinc Mine Update
Angas Zinc Mine Update Ongoing work with DSD about closure designs Surprise visit from Alexandrina Council regarding post- closure land use of Angas site Secured material required for closure earthworks, preventing additional land disturbance Lime storage for Hillgrove Resources Mine void
Slide 4: Terramin General Update
Terramin General Update Algerian Exploration License re-issued Tala Hamza progress after successful visit of Algerian delegation to China Tala Hamza revised feasibility study is positive and meets the objectives and expectations of the partners Planning for geotechnical and hydrogeological d
Slide 5: Bird in Hand update
Bird in Hand update Approved drilling programme for collecting metallurgical and geotechnical engineering data to feed into mine design geotechnical characterisation and groundwater modelling to support mine design and metallurgical testing to provide recoveries, Angas plant modification and tai
Slide 6: Upcoming AZM Activities
Upcoming AZM Activities TSF annual audit and inspection – 23rd February Annual compliance report – 31st March To determine the gold tailings characterisation, metallurgical and geochemical properties for carbonate tail potential neutralising effect on current tailings 6
Slide 7: Quarterly Environment Report
Quarterly Environment Report Matt Daniel Environment and Community Superintendent 7
Slide 8: AZM Environment General Update
AZM Environment General Update Ecosystem Function Analysis field work completed in November, report due early 2016 Early results indicate rapid growth of natives in Eastern SEB areas Rabbits and hares baited onsite with Pindone Annual Compliance Report due 31 March 2016 8 Flinders university
Slide 9: Spigot Reduced
Spigot 6 Reduced TSF tailings reduced with excavator at Spigot 6 as recommended by ATC Williams in 2015 report ATC Williams will return for annual inspection on 23rd February 2016 9
Slide 10: QER Correction
QER Correction Regional bore raw data contained a typing error – graphs were correct This has been corrected and updated – the pdf is on our website No instances above leading indicators or PEPR criteria limits PEPR Leading Oct-15 Parameter Units Criteria Indicator RG1 RG4 RG8 pH pH 8.70 8.15
Slide 11: Terramin Website - AZM
Terramin Website - AZM Terramin now has Angas Zinc Mine Community and Environment Sections Community Next SCCC meeting information Terms of Reference SCCC minutes, agendas and presentations Newsletters Environment PEPR (current version) Quarterly Environment Reports Annual Compli
Slide 12: Mine Void Recharge – mm/day
Mine Void Recharge – mm/day Recharge in the mine void, DH2 and DH3 over the recharge phase of the mine void Trends slowing dramatically as modelled Estimated recharge rates (mm/day) 600 60 Mine Void Recharge for the quarter (m) 500 50 400 40 mm/day 300 30 200 20 100 10 0 0 Q3 Q4 Q1 Q2 Q3 Q4 2014
Slide 13: Mine Void Recharge – model recalibration
Mine Void Recharge – model recalibration Model recalibrated in 2015 with real data collected over past 18 months Matches real time trend demonstrated in recharge figures per day for mine void, DH2 and DH3 and per quarter for the mine void 13
Slide 14: Recap - Rain Event 5th November 2015
Recap - Rain Event 5th November 2015 Burnside Road Burnside Creek bridge – 6.40pm 34mm at Strathalbyn Post Office (BOM, 2015) 17mm at AZM onsite meteorological station 0mm at Summerhill Road, south of AZM 14
Slide 15: Closure Plan Update
Closure Plan Update Matt Daniel – Environment and Community Superintendent 15
Slide 16: Closure Plan Progress Update
Closure Plan Progress Update Failure Modes Effects Analysis workshop held in October and risks updated in line with works undertaken by Terramin thus far to reduce risks associated with AZM during Closure Fortnightly operational closure meetings began in January Closure planning schedule - sub
Slide 17: Questions?
Questions? - _ densi (2 ge Z ae
Terramin Australia — Corporate Update (February 2016) on 6ix