  1. Slide 1: Quarter 4:2015 Strathalbyn Community Consultative Committee

    Quarter 4:2015 Strathalbyn Community Consultative Committee 1

  2. Slide 2: General Update

    General Update Joe Ranford General Manager  Terramin general update  Angas Zinc  Tala Hamza  Bird in Hand  AZM upcoming activities  Quarterly Environment Report  Closure planning progress update 2

  3. Slide 3: Angas Zinc Mine Update

    Angas Zinc Mine Update  Ongoing work with DSD about closure designs  Surprise visit from Alexandrina Council regarding post- closure land use of Angas site  Secured material required for closure earthworks, preventing additional land disturbance  Lime storage for Hillgrove Resources  Mine void

  4. Slide 4: Terramin General Update

    Terramin General Update  Algerian Exploration License re-issued  Tala Hamza progress after successful visit of Algerian delegation to China  Tala Hamza revised feasibility study is positive and meets the objectives and expectations of the partners  Planning for geotechnical and hydrogeological d

  5. Slide 5: Bird in Hand update

    Bird in Hand update  Approved drilling programme for collecting metallurgical and geotechnical engineering data to feed into mine design  geotechnical characterisation and groundwater modelling to support mine design and metallurgical testing to provide recoveries, Angas plant modification and tai

  6. Slide 6: Upcoming AZM Activities

    Upcoming AZM Activities  TSF annual audit and inspection – 23rd February  Annual compliance report – 31st March  To determine the gold tailings characterisation, metallurgical and geochemical properties for carbonate tail potential neutralising effect on current tailings 6

  7. Slide 7: Quarterly Environment Report

    Quarterly Environment Report Matt Daniel Environment and Community Superintendent 7

  8. Slide 8: AZM Environment General Update

    AZM Environment General Update  Ecosystem Function Analysis field work completed in November, report due early 2016  Early results indicate rapid growth of natives in Eastern SEB areas  Rabbits and hares baited onsite with Pindone  Annual Compliance Report due 31 March 2016 8 Flinders university

  9. Slide 9: Spigot Reduced

    Spigot 6 Reduced  TSF tailings reduced with excavator at Spigot 6 as recommended by ATC Williams in 2015 report  ATC Williams will return for annual inspection on 23rd February 2016 9

  10. Slide 10: QER Correction

    QER Correction  Regional bore raw data contained a typing error – graphs were correct  This has been corrected and updated – the pdf is on our website  No instances above leading indicators or PEPR criteria limits PEPR Leading Oct-15 Parameter Units Criteria Indicator RG1 RG4 RG8 pH pH 8.70 8.15

  11. Slide 11: Terramin Website - AZM

    Terramin Website - AZM  Terramin now has Angas Zinc Mine Community and Environment Sections  Community  Next SCCC meeting information  Terms of Reference  SCCC minutes, agendas and presentations  Newsletters  Environment  PEPR (current version)  Quarterly Environment Reports  Annual Compli

  12. Slide 12: Mine Void Recharge – mm/day

    Mine Void Recharge – mm/day  Recharge in the mine void, DH2 and DH3 over the recharge phase of the mine void  Trends slowing dramatically as modelled Estimated recharge rates (mm/day) 600 60 Mine Void Recharge for the quarter (m) 500 50 400 40 mm/day 300 30 200 20 100 10 0 0 Q3 Q4 Q1 Q2 Q3 Q4 2014

  13. Slide 13: Mine Void Recharge – model recalibration

    Mine Void Recharge – model recalibration  Model recalibrated in 2015 with real data collected over past 18 months  Matches real time trend demonstrated in recharge figures per day for mine void, DH2 and DH3 and per quarter for the mine void 13

  14. Slide 14: Recap - Rain Event 5th November 2015

    Recap - Rain Event 5th November 2015  Burnside Road Burnside Creek bridge – 6.40pm  34mm at Strathalbyn Post Office (BOM, 2015)  17mm at AZM onsite meteorological station  0mm at Summerhill Road, south of AZM 14

  15. Slide 15: Closure Plan Update

    Closure Plan Update Matt Daniel – Environment and Community Superintendent 15

  16. Slide 16: Closure Plan Progress Update

    Closure Plan Progress Update  Failure Modes Effects Analysis workshop held in October and risks updated in line with works undertaken by Terramin thus far to reduce risks associated with AZM during Closure  Fortnightly operational closure meetings began in January  Closure planning schedule - sub

  17. Slide 17: Questions?

    Questions? - _ densi (2 ge Z ae