Bonterra Resources, Inc. · TSXV:BTR

Bonterra Resources — Investor Presentation (December 2021)

35 slides from Bonterra Resources's investor presentation, December 2021

  1. Slide 1: Developing Québec's Next Gold Camp

    TSX-V BTR | OTCQX BONXF | FSE 9BR2 Developing Québec’s NEXT GOLD CAMP Exploration and Development in the Urban-Barry Camp December 2021 TSX-V BTR | OTCQX BONXF | FSE 9BR2 1

  2. Slide 2: Forward-Looking Statements

    Forward-Looking Statements This presentation contains "forward-looking information" within the meaning of Canadian securities legislation. Any information herein with respect to predictions, expectations, projections, objectives, assumptions or future events that are not historical facts may be "for

  3. Slide 3: Executive Summary

    Executive Summary Over 3 million ounces of total gold resources across all categories 1 Only permitted mill in the Urban-Barry Camp of Québec, Canada Mill has strategic value as several new discoveries have been made in the camp, but permitting timelines for new infrastructure takes time Valuation D

  4. Slide 4: Bonterra Transformation

    Bonterra Transformation ► Several important managerial and board changes were made since 2019 ► Updated MREs released on timeline promised to shareholders incorporating ~130,000 m of additional drilling (~6,000 m/month of new drilling ongoing) ► Mill expansion permits >85% complete CEO agrees to Boa

  5. Slide 5: Incoming CEO Track Record

    Incoming CEO Track Record ► Marc-Andre Pelletier joins with a strong track record as COO at Wesdome, where he led a team that increased production by ~100% driving a ~420% equity return since 2017 Strong Returns to Shareholders Wesdome outperformed by Wesdome GDXJ ~420% from October 2017 to May 27,

  6. Slide 6: Land Position in the Abitibi Greenstone Belt

    Land Position in the Abitibi Greenstone Belt ► Young and emerging camp, comparable to Val-d’Or 80 years ago, with activities ramping up Fenelon TSX-V BTR | OTCQX BONXF | FSE 9BR2 6

  7. Slide 7: Strategic Land Position and Infrastructure

    Strategic Land Position and Infrastructure ► Significant infrastructure, including a mill, camps and roads New Near Surface Discovery BACHELOR MINE M&I 42,000 oz Au @ 5.37 g/t Au M&I 118,000 oz Au @ 5.66 g/t Au Inferred 6,000 oz Au @ 4.36 g/t Au Inferred 98,000 oz Au @ 5.37 g/t Au Windfall M&I 689,0

  8. Slide 8: Capital Structure

    Capital Structure Enterprise value per resource Strong shareholders ounce of ~US$33 1 Capital Structure C$ Wexford 19.9% Issued & Outstanding Shares 111.26M Mmcap 8.5% Options 8.26M (Weighted average exercise price of C$1.39) Kirkland Lake 8.2% Warrants None Fully Diluted 119.52M Ruffer 5.3% (C$11.5

  9. Slide 9: Management & Board of Directors

    Management & Board of Directors Marc-Andre Pelletier Cesar Gonzalez Johnny Oliveira Director & Incoming President & CEO Executive Chairman & Director Chief Financial Officer Mr. Pelletier is a professional mining engineer with Mr. Gonzalez co-founded and serves as the CEO Mr. Oliveira has 20 years o

  10. Slide 10: 2021 MREs Update – 3 Moz & Growing

    2021 MREs Update – 3 Moz & Growing ► ~130,000 m of new diamond drilling incorporated in the 2021 MREs ► M&I and Inferred contained gold ounces grew by 78% and 27%, respectively ► Drilling continues at ~6,000 m/month across all three main projects 2019 MREs 2021 MREs % Change Category Tonnage Grade C

  11. Slide 11: Catalyst Timeline

    Catalyst Timeline ► Four drill rigs turning - ~6,000 m/month to expand deposits and make new discoveries ► Updated MREs now being used to prepare for a “hub-and-spoke” re-start ► Existing infrastructure >85% through the permitting process to expand from 800 tpd to 2,400 tpd 2021 2022 Jun Jul Aug Sep

  12. Slide 12: Market Overview

    MARKET OVERVIEW TSX-V BTR | OTCQX BONXF | FSE 9BR2 12

  13. Slide 13: Underground M&A Landscape

    Underground M&A Landscape ► Not many high-grade single mine/project companies left in Canada ► Most have been acquired at premium valuations Bonterra Claude Pure Gold Osisko Mining Wesdome Great Bear Pretium Battle North Barkerville Integra Gold Richmont Resources 1 Resources (Resource (Resource (An

  14. Slide 14: Gladiator and Windfall Lake Side by Side

    Gladiator and Windfall Lake Side by Side ► Gladiator has yielded 5.6 oz/m drilled (vs 4.6 oz/m for Windfall) ► Gladiator has yielded ~3,136 oz/hole (vs ~1,700 oz/hole at Windfall) Bonterra Osisko Resources 1 Mining 2 Asset Gladiator Windfall Lake Resource as of date Jun 2021 Feb 2021 Number of holes

  15. Slide 15: High Level Geology

    HIGH LEVEL GEOLOGY TSX-V BTR | OTCQX BONXF | FSE 9BR2 15

  16. Slide 16: Regional Structures Are Thought to be Key

    Regional Structures Are Thought to be Key ► Urban-Barry cross-regional corridors of structural decompression ► Regional structures are associated with deposits but also point to areas that need to be tested ► Several new targets have been identified and are to be tested during the fall/winter drilli

  17. Slide 17: Gladiator Project

    GLADIATOR PROJECT TSX-V BTR | OTCQX BONXF | FSE 9BR2 17

  18. Slide 18: Gladiator Regional Targets – Pearls on a String

    Gladiator Regional Targets – Pearls on a String ► Airborne magnetics illustrate the potential of regional targets along strike ► Management plans on testing regional targets to follow up on historic results ► Other nodes of decompression within the corridor to be tested similar to Gladiator ► Planne

  19. Slide 19: Gladiator – Oblique View Looking West

    Gladiator – Oblique View Looking West TSX-V BTR | OTCQX BONXF | FSE 9BR2 19

  20. Slide 20: Gladiator – Expansion at Depth

    Gladiator – Expansion at Depth TSX-V BTR | OTCQX BONXF | FSE 9BR2 20

  21. Slide 21: Duke – Magnetic TMI

    Duke – Magnetic TMI ► Duke sector untested magnetic interpreted decompression & EW conjugate structures => ► Regional exploration DDH targets TSX-V BTR | OTCQX BONXF | FSE 9BR2 21

  22. Slide 22: Barry Project

    BARRY PROJECT TSX-V BTR | OTCQX BONXF | FSE 9BR2 22

  23. Slide 23: Barry Gold Project

    Barry Gold Project ► Exploration potential down plunge and along strike ► Located within the same structural corridor southwest of the Windfall Lake Project TSX-V BTR | OTCQX BONXF | FSE 9BR2 23

  24. Slide 24: Barry Gold Project

    Barry Gold Project ► Mag survey revealed several sizable targets that are being tested Barry North 2019 Drill Intercept TSX-V BTR | OTCQX BONXF | FSE 9BR2 24

  25. Slide 25: Barry Gold Project

    Barry Gold Project ► Eastern target area TSX-V BTR | OTCQX BONXF | FSE 9BR2 25

  26. Slide 26: Moroy Project

    MOROY PROJECT TSX-V BTR | OTCQX BONXF | FSE 9BR2 26

  27. Slide 27: Moroy Gold Project

    Moroy Gold Project ► Located near the Bachelor Mill, drilling is focused on expanding known shear zones and targeting the intersection of several regional structures Recent Bulk Sample TSX-V BTR | OTCQX BONXF | FSE 9BR2 27

  28. Slide 28: Moroy Gold Project

    Moroy Gold Project ► Magnetic survey shows several regional targets that will be followed up on ► Regional target proximity to the mill results in lower risk exploration strategy TSX-V BTR | OTCQX BONXF | FSE 9BR2 28

  29. Slide 29: Bachelor – MAG / TMI

    Bachelor – MAG / TMI ► Sigmoïd, clone and cossin folded structural targets ► VMS + gold + IP target ► Nelligan gold target ► BIF stratigraphic gold target ► Desmaraisville north regional fold hinge structural corridors TSX-V BTR | OTCQX BONXF | FSE 9BR2 29

  30. Slide 30: Presentation Summary

    Presentation Summary ► Opportunity to invest in a multi-million ounce, strategic land package in Quebec’s next gold camp New CEO with a Successful Track Record of • Marc-Andre Pelletier was most recently the COO at Wesdome Gold Mines Ltd. where he Building and Operating Gold Mines in the was instrum

  31. Slide 31: Thank You!

    Thank You! www.btrgold.com 31

  32. Slide 32: Appendix - Mineral Resources

    Appendix - Mineral Resources NI 43-101 Mineral Resource Estimate - June 2021 (see notes on last page) Tonnage Grade Contained Metal Category (000 t) (g/t Au) (000 oz Au) Gladiator Underground Measured - - - Indicated 1,413 8.61 391 Measured + Indicated 1,413 8.61 391 Inferred 4,174 7.37 989 Barry Op

  33. Slide 33: Appendix - Summary of Assets

    Appendix - Summary of Assets Overview Key Opportunities • 391 koz Au grading 8.61 g/t (Ind.) / 989 koz Au grading 7.37 g/t (Inf.) • Opportunity to add tonnage from recently recognized ‘connector zones’ • Advanced exploration project • Deposit open down-plunge below 600-800 m Gladiator • Road access

  34. Slide 34: Appendix - Bachelor Mill

    Appendix - Bachelor Mill ► Mill permitting process began in April 2017 and is expected to be complete by the end of 2021 ► Opportunity to expand mill capacity to 2,400 tpd (from the current 800 tpd) Project Scope: • Remove existing 10x12 rod mill & three small ball mills • Add a SAG mill (6.4 m x 4.

  35. Slide 35: Appendix - Notes

    Appendix - Notes Model Parameters 1. CIM (2014) definitions were followed for Mineral Resources. 2. Bachelor and Moroy underground Mineral Resources are estimated at gold cut-off grades of 2.40 g/t or 3.0 g/t, domain dependent. Gladiator and Barry underground Mineral Resources are estimated at a gol

Bonterra Resources — Investor Presentation (December 2021) on 6ix