Slide 1: Mining Activities Commence at Baobab Phosphate Project, Senegal
22 March 2016 MINING ACTIVITIES COMMENCE AT BAOBAB PHOSPHATE PROJECT, SENEGAL PROJECT ON TRACK FOR 2016 PRODUCTION Highlights • Site and pit access roads complete, mining workshop concrete works complete, civil works and construction underway • Mining equipment delivery to site is almost complete •
Slide 2: Project Status
Project Status Development of the Project is well advanced with mining activities now commenced and production of first phosphate rock on schedule for early in the second half of 2016. Mine and Process Plant access roads are complete with the open pit ramp being established. • Mining operations have
Slide 3: Mine site facilities and water bore drilling
Figure 3: Project mine site facilities and offices being installed • German company BAUER Resources Senegal has been contracted to drill and install 2 water bores for the Project, principally for processing the phosphate ore. This drilling is well underway with the first of two 500m-deep water bores
Slide 4: Mining contractor, plant fabrication and offtake MOUs
• Mining contractor Agromines has completed top soil clearing of the first stage of the open pit and the main mining fleet has commenced overburden removal and is ramping up to be fully operational by the end of March. Figure 5: Ore haulage fleet on start line. • South African-based specialist engin
Slide 5: Gadde Bissik Mine Site Visit 18 March 2016
Baobab Mining and Chemicals Corporation SA Gadde Bissik Mine Site Visit 18 March 2016
Slide 6: Gadde Bissik Mine Location
Gadde Bissik Mine Location Y . Kebemer) pGadde’ Bissik Mine *Seuaiay Do Oa ae Ne cme (2016 Google. image Landsat ee
Slide 7: Gadde Bissik Mine Layout
Sp SRE PW RS Zi WStage es Stockpile sheeningzPlants ap Gadde Bask Miné Layout os
Slide 8: Mine Site Offices
Mine Site Offices
Slide 9: Manar Ba, BMCC GM
Manar Ba BMCC GM
Slide 10: Completion of the first process water bore by Bauer
Completion of the first process water bore by Bauer
Slide 11: Water bore gravel samples from the aquifer zone
Water bore gravel samples from the aquifer zone
Slide 12: Process water bore showing good initial water flow
Process water bore showing good initial water flow
Slide 13: Completing road access to the initial mine pit
Completing road access to the initial mine pit
Slide 14: Site of the initial mine pit, cleared of topsoil
Site of the inital mine pit, cleared of topsoil Start of pit ramp
Slide 15: Paul Richardson with mining contractor Agromines
Paul Richardson - Project Director with mining contractor Agromines
Slide 16: Agromines excavator ready to start stripping overburden
Agromines excavator ready to start stripping overburden
Slide 17: Mansour Gaye and Moustapha Sy
Mansour Gaye Moustapha Sy BMCC Agromines President
Slide 18: Agromines dumptruck fleet at the site
Agromines dumptruck fleet at the site
Slide 19: Macoumba Gaye, Ibrahima Diop and Manar Ba
Macoumba Gaye Ibrahima Diop Manar Ba BMCC President Agromines GM BMCC GM
Slide 20: Agromines maintenance shop under construction
Agromines maintenance shop under construction
Slide 21: Completing the water bore for the local community
Completing the water bore for the local community Russell Fulton Avenira Geological Manager
Slide 22: Dirt road from the minesite to Bambey
Dirt road from the minesite to Bambey going through the village of Darou Khoudoss
Slide 23: Excavator en route to the mine site
An excavator en route to the mine site on the paved national road from Bambey to Dakar