Avenira Limited · ASX:AEV

Avenira — Corporate Update (March 2016)

24 slides from Avenira's corporate update, Mar 22, 2016

  1. Slide 1: Mining Activities Commence at Baobab Phosphate Project, Senegal

    22 March 2016 MINING ACTIVITIES COMMENCE AT BAOBAB PHOSPHATE PROJECT, SENEGAL PROJECT ON TRACK FOR 2016 PRODUCTION Highlights • Site and pit access roads complete, mining workshop concrete works complete, civil works and construction underway • Mining equipment delivery to site is almost complete •

  2. Slide 2: Project Status

    Project Status Development of the Project is well advanced with mining activities now commenced and production of first phosphate rock on schedule for early in the second half of 2016. Mine and Process Plant access roads are complete with the open pit ramp being established. • Mining operations have

  3. Slide 3: Mine site facilities and water bore drilling

    Figure 3: Project mine site facilities and offices being installed • German company BAUER Resources Senegal has been contracted to drill and install 2 water bores for the Project, principally for processing the phosphate ore. This drilling is well underway with the first of two 500m-deep water bores

  4. Slide 4: Mining contractor, plant fabrication and offtake MOUs

    • Mining contractor Agromines has completed top soil clearing of the first stage of the open pit and the main mining fleet has commenced overburden removal and is ramping up to be fully operational by the end of March. Figure 5: Ore haulage fleet on start line. • South African-based specialist engin

  5. Slide 5: Gadde Bissik Mine Site Visit 18 March 2016

    Baobab Mining and Chemicals Corporation SA Gadde Bissik Mine Site Visit 18 March 2016

  6. Slide 6: Gadde Bissik Mine Location

    Gadde Bissik Mine Location Y . Kebemer) pGadde’ Bissik Mine *Seuaiay Do Oa ae Ne cme (2016 Google. image Landsat ee

  7. Slide 7: Gadde Bissik Mine Layout

    Sp SRE PW RS Zi WStage es Stockpile sheeningzPlants ap Gadde Bask Miné Layout os

  8. Slide 8: Mine Site Offices

    Mine Site Offices

  9. Slide 9: Manar Ba, BMCC GM

    Manar Ba BMCC GM

  10. Slide 10: Completion of the first process water bore by Bauer

    Completion of the first process water bore by Bauer

  11. Slide 11: Water bore gravel samples from the aquifer zone

    Water bore gravel samples from the aquifer zone

  12. Slide 12: Process water bore showing good initial water flow

    Process water bore showing good initial water flow

  13. Slide 13: Completing road access to the initial mine pit

    Completing road access to the initial mine pit

  14. Slide 14: Site of the initial mine pit, cleared of topsoil

    Site of the inital mine pit, cleared of topsoil Start of pit ramp

  15. Slide 15: Paul Richardson with mining contractor Agromines

    Paul Richardson - Project Director with mining contractor Agromines

  16. Slide 16: Agromines excavator ready to start stripping overburden

    Agromines excavator ready to start stripping overburden

  17. Slide 17: Mansour Gaye and Moustapha Sy

    Mansour Gaye Moustapha Sy BMCC Agromines President

  18. Slide 18: Agromines dumptruck fleet at the site

    Agromines dumptruck fleet at the site

  19. Slide 19: Macoumba Gaye, Ibrahima Diop and Manar Ba

    Macoumba Gaye Ibrahima Diop Manar Ba BMCC President Agromines GM BMCC GM

  20. Slide 20: Agromines maintenance shop under construction

    Agromines maintenance shop under construction

  21. Slide 21: Completing the water bore for the local community

    Completing the water bore for the local community Russell Fulton Avenira Geological Manager

  22. Slide 22: Dirt road from the minesite to Bambey

    Dirt road from the minesite to Bambey going through the village of Darou Khoudoss

  23. Slide 23: Excavator en route to the mine site

    An excavator en route to the mine site on the paved national road from Bambey to Dakar

  24. Slide 24: Avenira Limited contact details

    Avenira Limited ABN 48 116 296 541 www.avenira.com Ground Floor, 20 Kings Park Road West Perth, WA 6005 AUSTRALIA PO Box 1704 West Perth WA 6872 AUSTRALIA +61 8 9264 7000 [email protected] © 2016 Avenira Limited