  1. Slide 1: Gramercy Site Visit

    Exhibit 99.1 Gramercy Site Visit Noranda Aluminum Holding Corp August 4, 2010

  2. Slide 2: Forward Looking Statements

    Forward Looking Statements The following information contains, or may be deemed to contain, "forward- looking statements" (as defined in the U.S. Private Securities Litigation Reform Act of 1995). By their nature, forward-looking statements involve risks and uncertainties because they relate to even

  3. Slide 3: Management Presenters

    Management Presenters Layle K. “Kip” Smith, President and Chief Executive Officer Robert Mahoney, Chief Financial Officer Ramon Gil, President, Noranda Alumina LLC 3

  4. Slide 4: Off to a Good Start

    “Off to a Industry Good Start…” Dynamics Noranda Operating Noranda Strategy Model Brief Noranda Alumina History Second quarter results: Successful performance while completing foundational projects that strengthened Noranda 4

  5. Slide 5: Second Quarter Highlights

    Second Quarter Highlights Noranda produced strong current quarter results… – Net income was $6.9 million ($0.14 per share), and includes the net negative impact of $11 million, or $0.21 per share, from special items – Operating cash flow was $118 million – Adjusted EBITDA was $79 million total, and

  6. Slide 6: Integrated Upstream Business Review

    Integrated Upstream Business Review Upstream Margin Comments Integrated cash cost is $0.66 for Q2-10; normalizing Q1-10 for smelter volume and alumina 2009 6MOE Normalized 3MOE 6/30/10 6/30/10 ramp up, YTD cost is $0.67 Dollars per Pound LME 1.00 0.97 0.98 Strong Q2-10 demand in key primary aluminum

  7. Slide 7: Corporate Summary

    Corporate Summary Business Summary Comments 2009 3MOE 6MOE Strong Q2-10 performance reflects impact of Normalized(1) 6/30/10 6/30/10 productivity programs and management Total primary aluminum shipments 580 147 267 execution, with help from improved aluminum Integrated upstream margin on cash cost $

  8. Slide 8: Noranda Operating Model

    Industry “Off to a Dynamics Good Start…” Noranda Operating Noranda Strategy Model Brief Noranda Alumina History Though we can’t control the LME, we exercise significant control and influence over the basic drivers of our success 8

  9. Slide 9: Mission

    Mission Every day we build a sustainable, integrated aluminum company founded on growth and successful long-term relationships with our customers, co-workers, suppliers, communities and investors 9

  10. Slide 10: Noranda's Integrated Operating Footprint

    Noranda’s Integrated Operating Footprint Upstream Business Downstream Business Annual Capacity: 580mm lbs Annual Capacity: 495mm lbs (2) 2009 Cash Cost at Full Production: $0.72 / lb (1) Huntingdon New Madrid Rolling Mills St. Ann Gramercy Newport Salisbury Aluminum Bauxite Mine Refinery Rolling Mil

  11. Slide 11: Vertically Integrated Upstream Business

    Vertically Integrated Upstream Business The integration of our Upstream Business is the lynchpin to Noranda Bauxite our strategy and sustainability Mine – Significant Operating Leverage to LME Bauxite • Integration provides for a more “fixed” cost base relative to non-integrated producers whose marg

  12. Slide 12: Low Cost, Leading – Rolling Mill Operations

    Low Cost, Leading – Rolling Mill Operations Low cost Production Four Rolling Mills in Three States – Huntingdon West is the foil Huntingdon, TN mill with the lowest 2 plants, East and West conversion cost in North Started 1967 & 2000 America according to CRU Max. East capacity: 130mm lbs – CORE Prod

  13. Slide 13: Noranda Alumina Brief History

    Industry “Off to a Dynamics Good Start…” Noranda Noranda Strategy Operating Model Brief Noranda Alumina History Gramercy provides a critcial supply of alumina as part of our intergrated strategy 13

  14. Slide 14: Noranda Bauxite and Alumina Overview

    Noranda Bauxite and Alumina Overview On August 31, 2009, Noranda became the sole owner of the Gramercy refinery and St. Ann Bauxite operation – Strategic drivers: integrated supply, productivity, sales growth – increased leverage to LME Noranda Bauxite – St. Ann – Economic joint venture with Governm

  15. Slide 15: A Brief History of Noranda Alumina, LLC

    A Brief History of Noranda Alumina, LLC Construction on the alumina refinery began in 1957 with the first shipment of alumina occurring two years later. The Gramercy facility was originally owned by Kaiser. The refinery utilizes the Bayer process to chemically extract alumina from bauxite. Construct

  16. Slide 16: Environmental

    Environmental Red Mud Lakes Once alumina has been extracted, spent bauxite (‘red mud”) is managed in one of 4 Mud Lakes. Mud Lakes are permitted solid waste units designed to dewater the material and act as a final repository. Noranda Alumina has obligation to seal the Mud Lakes once they are no lon

  17. Slide 17: Health & Safety

    Health & Safety Safety is a Core Value MSHA Regulated Facility Maintains Process Safety Management program in addition to Occupational Safety Employee Involvement (ERT, Safe Start, JSC, Safety Recognition) Maintenance activities planned and scheduled Supported by SAP (CMMS) 17

  18. Slide 18: Noranda Strategy

    Industry “Off to a Dynamics Good Start…” Noranda Noranda Strategy Operating Model Brief Noranda Alumina History We have two #1 Priorities: Get the Results, and Do the Right Things the Right Way 18

  19. Slide 19: Our Two #1 Priorities

    Our Two #1 Priorities Noranda has two number one priorities Do the right things Get the results the right way •Legal •Individual Behaviors •Ethical •Team Disciplines •Credible •Sustainable Relationships 19

  20. Slide 20: Noranda Mission

    Noranda Mission Two #1 Do the Right Things Priorities Get the Results the Right Way Sustainable Goals Core Values Action oriented Problem solving Existing for Customers Ethics and Values Peer relationships Caring for Customers Drive for results Priority setting Respecting Suppliers Process Managemen

  21. Slide 21: Financial success in adverse conditions

    Financial success in adverse conditions Reduced Debt Improved Demand Share Generated More Cash (Free Cash Flow) Reduced Production Cost (Millions of dollars) 21

  22. Slide 22: Reconciliation of EBITDA to Net Income

    Reconciliation of EBITDA to Net Income Note: Amounts in millions, except per share data Comments Adjusted EBITDA for three months ended June 30, 2010 $ 78.8 (1) Interest (Expense)/Income, Net (8.5)prospectively,basedon post-IPOdebt balancesat applicableinterest rates (2) Depreciation & Amortization

  23. Slide 23: Well positioned for aluminum price recovery

    Industry “Off to a Dynamics Good Start…” Noranda Operating Noranda Model Strategy Brief Noranda Alumina History Noranda is well positioned to take advantage of a recovery in Aluminum prices 23

  24. Slide 24: Market Fundamentals

    Market Fundamentals We hold a positive outlook for Aluminum’s fundamentals over the medium and long-term, based on two views: Global demand for aluminum is expected Aluminum’s consensus estimated sustainable to continue to increase… price is meaningfully above current prices… Consumption Growth Driv

  25. Slide 25: China – Analysis

    China – Analysis Chinese Aluminum Consumption & China historically has produced at or near its Production aluminum consumption China has imposed severe export taxes on aluminum Exports are highly unlikely CRU forecasts China being net importers of Aluminum in the medium term Power – China is already