Graphano Energy Ltd. · TSXV:GEL

Graphano Energy — Investor Presentation (April 2023)

17 slides from Graphano Energy's investor presentation, April 2023

  1. Slide 1: Graphano Energy April 2023

    April 2023 TSX-V: GEL; FSE:97G0; OTCQB:GELEF

  2. Slide 2: Disclaimer

    Disclaimer This presentation contains certain forward-looking statements that reflect the current views and/or expectations of Graphano Energy Limited ("Graphano" or the "Company") with respect to its performance, business and future events, including statements regarding the Company's beliefs regar

  3. Slide 3: The Value Proposition

    The Value Proposition • Great Infrastructure – the Lac Aux Bouleaux (LAB) deposit is adjacent to the only graphite mine in Canada and the United States and has readily available power and transport infrastructure • Focus on near term production – Given the positive historical results on the flake si

  4. Slide 4: About Graphite

    About Graphite Carbon Brushes 11% Graphite Applications • High melting point material essential to Automotive Steel, Parts Foundries & 14% Refractories the refractory industry 41% Batteries 10% • Good conductor of electricity used as an anode material, e.g., batteries Others 10% Lubricants 14% • Sof

  5. Slide 5: There is No Turning Back: EVs are Here to Stay

    There is No Turning Back: EVs are Here to Stay The EV Revolution is Driving Dramatic Demand for Electric Minerals As Graphite is the Main Anode Material for EV Batteries, Demand is Expected to Increase Significantly April 2023 5

  6. Slide 6: Graphite Demand for EVs

    Graphite Demand for EVs • Total current production of natural graphite is 1.3 million tonnes(1) • As internal combustion engines vehicles are phased out, graphite demand for EV batteries alone could increase to 5 million tonnes, opening the opportunity for dozens of new graphite mines to open in the

  7. Slide 7: Lac Aux Bouleaux (LAB) Project

    Lac Aux Bouleaux (LAB) Project • 2022 exploration programs intersected significant graphite mineralization in drill holes and trenches, in Zones 1, 3, 4. Single test drill holes were also performed in Zone 8 and at the historical pit (that has a non-compliant resource of 1.45 Mt @ 8% Cg), with encou

  8. Slide 8: LAB Prospecting Targets

    LAB Prospecting Targets April 2023 8

  9. Slide 9: LAB Property: Select Drilling Results (Zone 1)

    LAB Property: Select Drilling Results Graphano drill program 2022 (Zone 1): Zone 1 • Drill Hole LB22-30 intersected 6.34% graphitic carbon (Cg) over 11m at 106m drilled depth including 9.15% Cg over 4.0m • Drill Hole LB22-18 intersected 6.0% graphitic carbon (Cg) over 6m at 65m depth • Drill Hole LB

  10. Slide 10: LAB Property: Select Drilling Results (Zones 3 and 4)

    LAB Property: Select Drilling Results Graphano drill program 2022 (Zone 3): 23 drill holes were drilled over the 500 metre length. The mineralization outlined remains open for expansion. Results include: • Drill Hole LB22-33 intersected 6.26% graphitic carbon (Cg) over 13.7 meters (m) starting at 14

  11. Slide 11: Standard Mine Project

    Standard Mine Project Geophysics Program • An airborne geophysical survey, which confirmed the presence of Fourteen grab samples from the 2022 fall two graphite related anomalies program yielded assay results between 1.26% Cg and 20.5% Cg with twelve of extending 500 metres and 600 them grading over

  12. Slide 12: Standard Mine Graphite Project Exploration Drill Results

    Standard Mine Graphite Project Exploration Drill Results Thickness (m) Hole No. From (m) To (m) Thickness (m) % Cg times % grade ST22-02 22.50 27.65 5.15 7.69 40 ST23-04 14.00 18.00 4.00 6.66 27 ST23-05 4.60 19.00 14.40 5.79 83 and 30.00 39.00 9.00 4.27 38 ST23-07 17.00 25.50 8.50 5.55 47 ST23-08 53

  13. Slide 13: Dudley and Lac Vert-Bouthillier Graphite Projects

    Dudley and Lac Vert-Bouthillier Graphite Projects • The Company has staked two sets of additional graphite claims, 5 km and 10 km south from the Lac Aux Bouleaux project, as part of the Company's consolidation strategy • A total of 11 claims covering 600 hectares were staked and comprise the Dudley

  14. Slide 14: Management Team

    Management Team Luisa Moreno, Ph.D., CEO – Dr. Moreno possesses unparalleled expertise in strategic minerals and related processes. She is currently Founder and Managing Director at Tahuti Global. Prior to this, she spent 7 years as a Financial and Senior Equity Analyst at Canadian financial researc

  15. Slide 15: Project Development Timeline

    Project Development Timeline Flowsheet Joining Global Infill and Expansion Optimization Drilling at LAB and Resource Estimation Financing and Graphite Supply Feasibility Study Construction Chain Standard 2023 2024 2025 2026 2027 2028 Metallurgical Work Pilot Plant Complete PEA 2026 April 2023 15

  16. Slide 16: Financial Details

    Financial Details Number of Shares 17,038,268 Options 1.5 million Warrants 13,208,948 Shares fully diluted 31,747,216 Cash $2.3 million Market cap $4.5 million April 2023 April 2023 16

  17. Slide 17: Contact

    Contact Luisa Moreno, CEO and Director [email protected] 219 - 120 Carlton Street Toronto, Ontario M5A 4K2 April 2023 17

Graphano Energy — Investor Presentation (April 2023) on 6ix