Consumers Energy Company · NYSE:CMS/PB

Consumers Energy — Corporate Update (August 2024)

8 slides from Consumers Energy's corporate update, August 2024

  1. Slide 1: Loud Dam

    Loud Dam PUBLICSECTORCONSULTANTS.COM 1

  2. Slide 2: Loud Dam

    Loud Dam PUBLICSECTORCONSULTANTS.COM 2

  3. Slide 3: River Hydro Asset Key Terms

    River Hydro Asset Key Terms Definitions/purpose of the major components and aspects critical of safe, compliant, and reliable operations: • Dam: The entire barrier to hold back the water (reservoir) typically consists of embankments, spillways, and powerhouse • Spillway: Primary location for water f

  4. Slide 4: Loud Dam Structures

    Loud Dam Structures PUBLICSECTORCONSULTANTS.COM

  5. Slide 5: Original Survey Drawings for Loud Dam

    Original Survey Drawings for Loud Dam PUBLICSECTORCONSULTANTS.COM

  6. Slide 6: Loud Hydro

    Loud Hydro • With a capacity of 4,000 kilowatts, construction was completed in 1913. • Loud worked with William Foote and others to build the Au Sable River hydros. • Loud purchased most of the cut over Au Sable River lands between 1900 and 1906. PUBLICSECTORCONSULTANTS.COM

  7. Slide 7: General Information: Loud Dam

    General Information: Loud Dam FERC License Expiration Date: June 30, 2034 Dam Height (ft.): 40 Length of Dam (ft.): 2,180 Drainage Area (sq. miles): 1,602 Impoundment Area (acres): 790 Age (years): 109 FERC Hazard Classification: High* Approximate Population at Risk: 474 Approximate Recreation Use:

  8. Slide 8: Percentage of Fuel Type Used to Produce Consumers Energy's Total Electricity

    Percentage of Fuel Type Used to Produce Consumers Energy's Total Electricity Solar Solid Waste Incineration Wind Wood 0.5% 0.9% 7.0% Biomass 2.0% Other 0.1% 0.0% Biofuel Coal 0.1% 31.4% Hydroelectric 1.2% Oil 0.2% Gas 35.7% (Apr 2021-Mar 2022) Nuclear 21.0% PUBLICSECTORCONSULTANTS.COM 8

Consumers Energy Company — Corporate Update (August 2024) on 6ix