  1. Slide 1: Quality Policy Statement

    Quality Policy Statement Himax commits ourselves to achieve total customer satisfaction through continuous improvement of our business. Quality Policy Embraces … 1) 達成全面性客戶滿意 To achieve customers’ overall satisfaction. 2) 持續改善是我們日常工作 Continuous improvement is our routine. PAGE 1

  2. Slide 2: Quality Goal

    Quality Goal Quality Goal (品質目標 ) 1 、 Defect rate of customer return is less than 300 DPPM for 2003 2500 2000 2000 PPM 1500 PPM 1500 1000 PPM 1000 500 PPM 500 0 Jan Feb Mar Apr May Jun Jul Aug Sep Oct Nov Dec 2 、 The frequency of customers’ complaints shall not exceed three cases per month where the

  3. Slide 3: Quality Assurance Organization

    QUALITY ASSURANCE ORGANIZATION QA Dept. QC/SQE QC/QAS RA * SUPPLIER AUDIT/ * QUALITY SYSTEM * Customer Complaint Management MANAGEMENT AUDIT * FAILURE ANALYSIS * QUALITY SYSTEM * Reliability Test * SUPPLIER UPGRADE/MAINTENANCE QUALITY * QUALITY SYSTEM IMPROVEMENT DIAGNOSIS & * NONCONFORM PREVENTION

  4. Slide 4: Quality System Improvement Plan For Y2003

    Quality System Improvement Plan For Y2003 Supplier Based Management Supplier In Process Quality – Supplier Quality Eng Team (SQE Team) – Gauge Repeatability & Reproducibility (R&R) – Monthly CIP Meeting – New Product Process Readiness (NPPR) – External System Audit – Tooling Management Customer S

  5. Slide 5: Quality Enhancement Plan

    Quality Enhancement Plan PAGE 5

  6. Slide 6: Quality Enhancement Plan

    Quality Enhancement Plan • Supplier Quality Eng Product • Phase Review Supplier Based Team (SQE Team) Process (PrP) Development • Design for X Management • Supplier New Product (DFX) Process Readiness (SNPPR) • Supplier Performance Ranking Quality Enhancement Plan •Monthly Quality • SPC Control Cust

  7. Slide 7: Product Development

    Product Development PAGE 7 LY

  8. Slide 8: IC New Product Development Control Procedure

    IC New Product Development Control Procedure PAGE 8

  9. Slide 9: IC New Product Development Control Procedure

    IC New Product Development Control Procedure PAGE 9

  10. Slide 10: Supplier Based Management (SBM)

    Supplier Based Management (SBM) PAGE 10

  11. Slide 11: Implementation of SBM

    Implementation of SBM Organization Enhancement ( 組織加強 ) SQE Based Organization Foundry Gold Bumping TAB tape Assembly House 晶圓廠 Bumping 廠 TAB tape 廠 封裝測試廠 SQE SQE SQE SQE PAGE 11

  12. Slide 12: Supplier Quality Management

    Supplier Quality Management SQPR Supplier Annual Source Audit Monthly Supplier Quality ASL on Review Quality System Meeting Management Quality New Product Abnormal Release C Notice Procedure D A Supplier Quality Goal P PAGE 12

  13. Slide 13: New Supplier Survey

    New Supplier Survey Yearly Follow How to become to Himax Up Audit Is Needed Certificated Supplier Perspective Best Supplier Supplier Questionnaire Supplier Fill Out Questionnaire Himax Audit Team Quarterly Supplier Perform Audit for Performance Ranking the 1st Time. T,Q,C,D,S Supplier Make For Certi

  14. Slide 14: Supplier Sourcing

    Supplier Sourcing New Supplier Audit Categories Management Delivery Quality New Supplier Service Audit Categories Environment Cost Technology PAGE 14

  15. Slide 15: ASL

    ASL on System ASL Login & Logout New Supplier Sourcing NG Evaluation OK ASL CIP OK OK SQP R、 Conditiona Quality Annu l Approval Improve al Audit NG NG Disqualif y End PAGE 15

  16. Slide 16: Prospective Supplier Profile Questionnaire

    Prospective Supplier Profile Questionnaire The questionnaire consists of eleven parts( 此問卷調查是由十二個部份所組成 ): 1) Supplier Evaluation Summary ( 供應商評估總表 ) 2) Company Profile ( 公司簡介 ) 3) Location & Address ( 公司地址 ) 4) Technology ( 技術方面 ) 5) Quality ( 品質方面 ) 6)Manufacturing Capability ( 製造能力方面 ) 7)Delivery

  17. Slide 17: QSA Performance

    QSA Performance Management Responsibility SHB (F4.1) al ne Quality Systems Requirements: RAR BR (#4.2, 44.17) Customer Service/Contract Review'Control of Supplied Product Personnel Training and Certification SP RB SMHS HM can Bh (#43, #47, #4.19) Control of Quality Records ~~ Gh ACHES Eth) (4.16) /

  18. Slide 18: Supplier New Product Process Readiness

    Supplier New Product Process Readiness Supplier Early Involvement F.S. WS ES CS 工程實驗 小量試產 MP 可行性評估 設計階段 量產 階段 階段 Himax Supplier choice from ASL side SNPPR review Supplier Design input & output side Design verification & validation Design change SNPPR execute Note: FS: Feasibility Study WS: Working S

  19. Slide 19: Implementation of SNPPR

    Implementation of SNPPR Supplier New Product Process Readiness (SNPPR) Suppl iers Suppliers Himax New Product SQE On Development Site Check Effectively Supplier SNPPR Execute Item Confirm PAGE 19

  20. Slide 20: Monthly Quality Meeting

    Monthly Quality Meeting Himax Total Quality Commitment To Our Customers Total Quality Commitment Supplier To Himax’s Customers Total Quality Commitment To Himax Supplier Quality Meeting 1. Failed to Achieve Quality Target: CIP Activities Review Items ◣ Fair Quality: Once per Month 1) Yield ◣ Poor Qu

  21. Slide 21: Quality Abnormal Notice System

    Quality Abnormal Notice System QAN System Issue • Register QAN A Performance Index QAN System • QAN On-Time Issue • Reply Date Reply Rate Action Plan • Action Plan No Create QC Review QAN Summary Yes Audit by QC Release QAN No Conformity A Yes Close PAGE 21

  22. Slide 22: Supplier Quality Performance Ranking

    Supplier Quality Performance Ranking Quality Cost 25% 25% Performance Ranking 100% Tech. Delivery 25% 25% Weighted Average Winner PAGE 22

  23. Slide 23: Process of Product Quality Control

    Process of Product Quality Control PAGE 23

  24. Slide 24: Process of Product Quality Control

    Process of Product Quality Control Sponsor Input Procedure Output Foundry IC Design WAT 資料 Bumping Bumping OQC QA WAT 資料 report IC Design CP Test CP test record Tape Maker PE Tape OQC report Related Tape OQC COG Others Assembly/ Dept. report Assembly TCP,COF FT test record PE Assembly house FT test

  25. Slide 25: Reliability Test

    Reliability Test @eeeoeeeeeeeghcehmUMMmUMOMDUh HUM WU OHDUMOCOHD6UCUCODCLCODCLO C@ C® PAGE 25 4»

  26. Slide 26: New Product Reliability Test Items

    New Product Reliability Test Items Change Item Test Items Package Level Wafer Level HTST LTST THT TCT PCT ESD LU HTOL Change Fab X X X X X V V V Process Generation X X X X X V V V change Process/Material of V V V V V X X X Tape Process/Material of V V V V V X X X Bump Process of Inner Lead V V V V V

  27. Slide 27: Test Items - Device Level

    Test Items-------Device Level Test Item Test condition Duration Sample Pass Criterion Reference size Standard ESD Machine Model: - 3 ≧ (±)200V EIA / 1.Equivalent Capacitance JESD22- (Electro-Static A115-A C=200pF Discharge) 2.Equivalent Resistance R=0Ω Latch-up Pulse current injection - 3 ≧ (±)200 m

  28. Slide 28: Test Items - Package Level

    Test Items-------Package Level Test Item Test condition Duration Sample size Reference Standard HTST 1250C ±50C 1000 hrs 22 EIAJED- (High Temperature 4701B-111 Storage Test) LTST -650C 1000 hrs 22 EIAJED- 4701B-112 (Low Temperature Storage Test) THT Condition C: 22 EIAJED- 1000 hrs 4701B-121 (Temper

  29. Slide 29: On-going Reliability Test Item (I)

    On-going Reliability Test Item (I) Device reliability monitor will be watched by process parameter per month and yield trend chart per week. (Report will keep watch internally) Will do ESD/Latch-up test per quarter. Test Item Test condition Duration Sample size Report Sponsor Process WAT key paramet