  1. Slide 1: Farmin Opportunity Weald Basin - Onshore UK PEDLs 135, 136, 137

    Farmin Opportunity Weald Basin - Onshore UK PEDLs 135, 136, 137

  2. Slide 2: Disclaimer

    DISCLAIMER The following presentation may include forward-looking statements within the meaning of Section 27A of the Securities Act of 1933, as amended and Section 21E of the Securities Exchange Act of 1934, as amended, which are intended to be covered by the safe harbors created thereby. You can i

  3. Slide 3: Location of PEDLs 135, 136 & 137

    Location of PEDLs 135,136 & 137 Location of PEDLs 135,136 & 137

  4. Slide 4: Attractions of the UK - Weald Basin

    Attractions of the UK - Weald Basin Stable political and legal environment Flexible and benign licensing environment Good fiscal terms - 30% corporate tax, 20% supplemental corporate tax, no royalties, bonuses, state participation or performance bonds Onshore - lower cost environment than North Sea

  5. Slide 5: The Opportunity

    The Opportunity Proven petroleum system(s) - on trend with the Humbly Grove, Brockham and Palmers Wood oilfields and Albury and Bletchingley gasfields Two proven plays - Jurassic oil and Triassic gas Several large, structural prospects identified - 164 BCF Gas and 4 - 40 MMBBL Oil Multiple, stacked

  6. Slide 6: Weald Basin - Stratigraphy

    Weald Basin - Stratigraphy (CHRONOSTRATIGRAPHY OF THE NORTH WEALD BASIN SLET ET ste new sn L000 SHELF "TERTIARY (CRETACEOUS TRIASSIC] JURASSIC A ware 208

  7. Slide 7: C80-130_R_NF Prospect seismic section

    C80-130_R_NF Horse Hill Wood Prospect SW NE NE GRINSTEAD CLAY TOP PURBECK ANHYDRITE TOP KIMMERIDGE MICRITE TOP CORALLIAN BEDS TOP GREAT OOLITE TOP TRIASSIC PROPOSED HORSE HILL WOOD-1 COLLENDEAN FARM-1

  8. Slide 8: Top Purbeck Depth Structure Prospect

    Top Purbeck Depth Structure Horse Hill Wood Prospect

  9. Slide 9: Top Triassic Depth Structure Prospect

    Top Triassic Depth Structure Horse Hill Wood Prospect

  10. Slide 10: C79-38_R_NF Binton Farm & Manor Farm Prospects

    C79-38_R_NF Binton Farm & Manor Farm Prospects S N N TOP PURBECK ANHYDRITE TOP KIMMERIDGE MICRITE TOP CORALLIAN BEDS TOP GREAT OOLITE TOP TRIASSIC MANOR FARM BINTON FARM

  11. Slide 11: Top Purbeck Depth Structure Binton Farm & Manor Farm Prospects

    Top Purbeck Depth Structure Binton Farm & Manor Farm Prospects Manor Farm: LCC 1900' TVD SS - RELIEF 240' - AREA 6.28 KM2 Binton Farm: LCC 2400' TCD SS - RELIEF 520' - AREA 18.47 KM2 Proposed Binton Farm-1 Proposed Manor Farm-1

  12. Slide 12: Prospect Summary Table

    Prospect Summary Table Prospect & Target Horizon Area Mean (Acres) OOIP Mean (MMBO) Recovery Factor (%) Recoverable Reserves Mean (MMBO) Horse Hill Wood Upper Portland Sandstone 1,800 57 30 17 Lower Portland Sandstone 1,800 147 30 44 Corallian Sandstone 2,400 33 30 10 Great Oolite Limestone 3,600 10

  13. Slide 13: Prospect Target Depths and Preliminary Well Costs

    Prospect Target Depths and Preliminary Well Costs Prospect Total Depth MD (ft) Total Depth TVDSS (ft) Preliminary Dry Hole Costs GBP Million Preliminary Dry Hole Costs US$ Million Horse Hill Wood 8,640 7,790 3.5 6.9 Manor Farm 3,800 2,580 2.2 4.3 Binton Farm 4,140 3,160 2.4 4.7

  14. Slide 14: Suggested Farmin Terms

    Suggested Farmin Terms Farminee to pay 100% of the following work program to earn 50% interest in the three blocks (PEDL 135, 136 and 137): 2 firm wells one to test the oil play (nominally Manor Farm), and one to test the gas play (nominally Horse Hill Wood) PLUS Back costs For further information p