  1. Slide 1: Advancing Towards Rare Earth Production

    Slide 1: Advancing Towards Rare Earth Production

    ASX:HAS For personal use only ADVANCING TOWARDS RARE EARTH PRODUCTION Delivering an Integrated Mine to Market Strategy Corporate Presentation November 2026 1

  2. Slide 2: Disclaimer

    Slide 2: Disclaimer

    DISCLAIMER This presentation has been prepared by Hastings Technology Metals Ltd (“Company” or “Hastings”). This presentation is not an offer, invitation, solicitation or other recommendation with respect to the subscription for, purchase or sale of any securities in the Company. This presentation h

  3. Slide 3: Contents

    Slide 3: Contents

    CONTENTS For personal use only Rare Earth Overview 4 Hastings projects 5 Yangibana Joint Venture Project 6 Thailand Hydromet Processing Plant 9 Timeline 17 Appendix 19 3

  4. Slide 4: Rare Earths: The Metals Behind the Energy Transition

    Slide 4: Rare Earths: The Metals Behind the Energy Transition

    RARE EARTHS: THE METALS BEHIND THE ENERGY TRANSITION NdPr is the critical input for the world’s strongest permanent magnets For personal use only What are rare earths? NdPr: the key to permanent magnets. CAGR growth - estimated at ~9% over the next 10 years (Adamas Intelligence) A group of 17 elemen

  5. Slide 5: Hastings Snapshot

    Slide 5: Hastings Snapshot

    HASTINGS SNAPSHOT Diversified rare earths company, with near-term revenue and profits For personal use only Thailand Hydromet Plant1 Yangibana JV Project2 › Interim holding of 49% in Thai MREC plant, › Ownership: Hastings 40%, Wyloo 60% and application to Thai authorities for up › Australia's highes

  6. Slide 6: Yangibana Joint Venture Project

    Slide 6: Yangibana Joint Venture Project

    YANGIBANA JOINT VENTURE PROJECT WITH For personal use only Resource & Reserve Updated DFS Category Tonnes TREO % NdPr:TREO JORC Mineral Resource 29.9 Mt 0.93% 32% PRE-TAX NPV8 STAGE 1 CAPITAL COST Updated MRE (Feb 2024) 21.0 Mt 1.12% up to 52% $649M $333.4M 34% IRR (pre-tax, ungeared) NPV8 / capex r

  7. Slide 7: Infrastructure Built and Fully Permitted

    Slide 7: Infrastructure Built and Fully Permitted

    INFRASTRUCTURE BUILT AND FULLY PERMITTED WITH A$160M spent on mine infrastructure & long-lead equipment1 For personal use only Kurrbili Village - 294 rooms fully commissioned with Yangibana Airstrip - 2km in length, suitable for planes up Site Access Roads - 20km site access road to connect the medi

  8. Slide 8: Long Lead Time Equipment Procured and Stored in WA

    Slide 8: Long Lead Time Equipment Procured and Stored in WA

    LONG LEAD TIME EQUIPMENT PROCURED AND STORED IN WA Significant long lead-time items ready for deployment For personal use only Re-Grind Mill Pumps and Equipment Load Bin, Off-gas Scrubber and Uranium Removal Circuit 8

  9. Slide 9: Thailand Hydromet Processing Plant

    Slide 9: Thailand Hydromet Processing Plant

    For personal use only Thailand Hydromet Processing Plant A CAPITAL-EFFICIENT, NEAR- TERM REVENUE PATHWAY Corporate Presentation November 2026 Refer ASXAnnouncement “Hastings Acquires Hydromet Plant” dated 31 March2026 9

  10. Slide 10: Thailand Hydromet Plant

    Slide 10: Thailand Hydromet Plant

    THAILAND HYDROMET PLANT Strategically located MREC processing facility Location For personal use only Kabin Buri, Thailand - 175km from Laem Chabang deep-water port. Facility Purpose-built Modular hydrometallurgical facility on site area of ~103,000sqm and 2 Factory buildings of ~4,000 sqm each with

  11. Slide 11: Thailand Advantage

    Slide 11: Thailand Advantage

    THAILAND ADVANTAGE Fiscal & Geopolitical Support For personal use only ~4x 13yr 175km 2025 Lower indicative OPEX BOI Corp Tax From Laem Chabang US-Thailand Critical vs remote WA exemption target deep-water port Minerals MOU Tier-1 Infrastructure Low OPEX Kabin Buri industrial area provides access to

  12. Slide 12: Enuo: Our Partner

    Slide 12: Enuo: Our Partner

    ENUO: OUR PARTNER Operating experience, feedstock and financial commitment behind the Thailand plant For personal use only About Enuo2 Plant operator Plant in place Secured feedstock Singapore-based critical minerals group Hastings will be the manager Buildings structurally complete Framework agreem

  13. Slide 13: The Hydromet Process

    Slide 13: The Hydromet Process

    THE HYDROMET PROCESS Thailand Plant Flowsheet Mixed Rare Earth Chloride Production For personal use only Feedstock Optionality Stage 1: African sourced monazite concentrates Stage 2: Yangibana and third-party 7-Step Hydromet Process 1. Grinding 2. Caustic Cracking 3. Leaching & Filtration 4. Acid Di

  14. Slide 14: Thai Plant Economics and Deal Structure

    Slide 14: Thai Plant Economics and Deal Structure

    THAI PLANT ECONOMICS AND DEAL STRUCTURE Estimated Capex US$12M For personal use only Acquisition Cost - US$15M US$98.4M US$15.5M US$17.5M Interim holding of 49% Year 1 Gross Revenue Year 1 HAS 49% Pre-Tax Year 2 HAS 49% Pre-Tax (100%) Profit Profit Submitting an application to Board of Ownership %:

  15. Slide 15: Thailand Hydromet Plant Construction

    Slide 15: Thailand Hydromet Plant Construction

    THAILAND HYDROMET PLANT Hydromet Plant Construction & Delivery of equipment (as at late September) For personal use only 15

  16. Slide 16: Thailand - Execution Strategy

    Slide 16: Thailand - Execution Strategy

    THAILAND - EXECUTION STRATEGY Low-cost processing buffers price risk, avoids mine-scale capex and keeps Yangibana mine development optional For personal use only Third-party feedstock Kabin Buri processing plant MREC product 10,000 tpa monazite input 12,000 tpa MREC production output Production in Q

  17. Slide 17: Indicative Timeline & Value Catalysts

    Slide 17: Indicative Timeline & Value Catalysts

    INDICATIVE TIMELINE & VALUE CATALYSTS The Road to Revenue: Key Milestones 2026-2027 For personal use only Q1 CY26 Q2 CY26 2H CY26 1H CY27 Q4 CY27 Acquisition of 49% Signed Framework Commence site 12,000tpa MREC Commence plant Interest in Thai Offtake Agreement preparation work output capacity design

  18. Slide 18: Hastings Technology Metals Limited

    Slide 18: Hastings Technology Metals Limited

    For personal use only Hastings Technology Metals Limited ABN 43 122 911 399 Level 6, 197 St Georges Level 3, 5Terrace Mill St Perth Western Australia 6000 Follow us on T: +61 8 6117 6118 E: [email protected] hastingstechmetals.com 18

  19. Slide 19: Appendix

    Slide 19: Appendix

    For personal use only APPENDIX 19

  20. Slide 20: Yangibana JV Project Resources and Reserves

    Slide 20: Yangibana JV Project Resources and Reserves

    YANGIBANA JV PROJECT RESOURCES AND RESERVES MINERAL RESOURCES AND ORE RESERVES1 For personal use only TOTAL JORC (2012) MINERAL RESOURCES (30 OCTOBER 2022) Category mt %TREO %NdPr TREO tonnes Yangibana Measured 4.97 0.96 0.37 47,721 Category mt %TREO %NdPr TREO tonnes Indicated 19.51 0.88 0.32 171,9

  21. Slide 21: Yangibana Project Peer Comparison

    Slide 21: Yangibana Project Peer Comparison

    YANGIBANA PROJECT PEER COMPARISON PEER COMPARISON – NDPR:TREO RATIO For personal use only Ore Reserves Ore Reserves Ore Reserves Ore Reserves Ore Reserves Ore Reserves NdPr:TREO Majority / Full Stage of (Proved) (Proved) (Probable) (Probable) (Total) (Total) ratio1 Mine Ticker Capex (A$m) Source Own

  22. Slide 22: Yangibana REE & Nb Project

    Slide 22: Yangibana REE & Nb Project

    Yangibana REE For personal use only 20.9Mt JORC Ore Reserve & Nb Project 37% AUSTRALIA’S HIGHEST-GRADE Avg NdPr:TREO NdPr RARE EARTHS PROJECT – FULLY PERMITTED, SHOVEL- READY A$160M+ Capital Spent To Date Joint Venture (UJV)1 A JV with Wyloo holding 60%, and HAS retaining a 40% interest of project r

  23. Slide 23: African Monazite Feedstock

    Slide 23: African Monazite Feedstock

    AFRICAN MONAZITE FEEDSTOCK Enuo Framework Binding Offtake Agreement (FOA) For personal use only Product Estimated REE Composition African Monazite Concentrate. NdPr (Nd + Pr) Minimum Grade 20.0% TREO ≥54% TREO on dry basis (excl thorium). Annual Volume Primarymagnet elements | EV & wind turbinemagne

  24. Slide 24: Thailand Hydromet Plant: Processing Strategy vs Traditional

    Slide 24: Thailand Hydromet Plant: Processing Strategy vs Traditional

    THAILAND HYDROMET PLANT Thai Plant Processing Strategy vs. Traditional (Sulfuric Acid) Processing For personal use only Caustic Crack + Traditional Hydrochloric Acid Sulfuric Acid Roast HCl H2SO4 ~20% Price Premium Multiple Stirred Tank Reactors PRIMARY (Parallel) EQUIPMENT Single Large Rotary Kiln

  25. Slide 25: Investment Highlights

    Slide 25: Investment Highlights

    For personal use only CONTINUED CRITICAL TIER-1 ASSET, HIGH- DE-RISKED PATH TO THAI PLANT: NEAR- SIGNIFCANT RE- ESTABLISHED ACCESS MINERALS TAILWINDS GRADE NdPr PRODUCTION TERM REVENUE RATE POTENTIAL TO GLOBAL OFFTAKE Structural NdPr 37% NdPr:TREO ratio DFS confirms robust Near-term revenue Permitte

  26. Slide 26: Glossary

    Slide 26: Glossary

    GLOSSARY µm​ micrometre, metric unit of measure for length equal to 0.001 mm​ HREO Heavy Rare Earth Oxide Project​ Yangibana Rare Earths & Niobium Project​ For personal use only ANSTO​ Australian Nuclear Science and Technology Organisation​ Hydromet​ Hydrometallurgical Plant​ Pr6O11 Praseodymium oxi

Source: ASX announcement, Nov 27, 2026