CIBC Whistler Institutional Investor Conference Drew Zieglgansberger Senior Vice-President, Regulatory, Local Community & Military Paul Reimer Senior Vice-President, Marketing, Transportation & Power Whistler │ January 19 - 20, 2012 Forward-looking information This presentation contains certain forw
Slide 2: Oil & gas information & non-GAAP measures
Oil & gas information & non-GAAP measures Oil & gas information The contingent resources estimates, effective December 31, 2010, and the discovered bitumen initially-in-place estimates, effective December 31, 2009, were prepared by McDaniel & Associates Consultants Ltd., an independent qualified res
Slide 3: Providing sustainable, predictable oil growth
Providing sustainable, predictable oil growth Mbbls/d 500 Bitumen Pelican Lake Other oil & NGLs GR 400 CA 021F 14 % – 2 1F 201 300 200 100 0 2010 2011F 2012F 2013F 2014F 2015F 2016F 2017F 2018F 2019F 2020F 2021F Volumes are shown before royalties and net to CVE. 2011F based on the October 27, 2011 g
Slide 4: Leading capital efficiency
Leading capital efficiency Foster Creek Christina Lake $/bbl/d $/bbl/d 30,000 30,000 Actual costs Projected costs Actual costs Projected costs 20,000 20,000 10,000 10,000 0 0 A B C D&E FG&H* A&B CD&E FG&H 20Mbbls/d 10Mbbls/d 30Mbbls/d 60Mbbls/d 125Mbbls/d 18Mbbls/d 120Mbbls/d 120 Mbbls/d Capital eff
Slide 5: Improving start-up performance
Improving start-up performance Mbbls/d Christina Lake phases A, B & ramp up of C ISOR 60 5.0 Capacity 4.5 50 4.0 3.5 40 3.0 30 2.5 2.0 20 1.5 Turnaround 1.0 10 0.5 0 0.0 1-Dec-10 1-Mar-11 1-Jun-11 1-Sep-11 1-Dec-11 Production is shown on a gross basis. Advancing our emerging projects Regulatory appr
Slide 6: Refining assets are key to integration
Refining assets are key to integration • Wood River • 356 Mbbls/d crude capacity • 240 Mbbls/d heavy crude • 85% clean product yield • Borger • 146 Mbbls/d crude capacity • 35 Mbbls/d heavy crude • 89% clean product yield • 2012 operating cash flow* of $300 - $600 MM *Operating cash flow is a non-GA
Slide 7: Supplemental information
Focused on increasing total shareholder return Oil resource Project Financial Building NAV Building base execution strength NAV Dividend growth Supplemental information 7
Slide 8: Cenovus's value pledge – December 2011
Cenovus’s value pledge – December 2011 • Deliver on commitments • Achieve step change in net asset value • Sustain decades of growth with manufacturing model Focused on increasing total shareholder return Delivering on our commitments 2011 Added significant reserves & contingent resources Q1 Execute
Slide 9: Advancing oil growth with strong execution
Advancing oil growth with strong execution 2012 Disclose 2011 reserves & contingent resource Execute significant seismic & strat well program Q1 Establish Telephone Lake dewatering pilot Provide update on Telephone Lake & area strategic commercial initiative Connect Shaunavon & Bakken central facili
Slide 10: Building on our track record
Building on our track record Oil & liquids production Mbbls/d 180 +21% +5% +6% 120 60 0 2010 2011F 2012F Other oil & NGLs Pelican Lake Oil sands Volumes are shown before royalties and net to CVE. 2011F based on the October 27, 2011 guidance document. 2012F based on midpoints of December 7, 2011 guid
Slide 11: Generating sustainable growth for decades
Generating sustainable growth for decades • Increased resource base • Evolved technology to build value • Improved our execution Stratigraphic well programs Investment in technology # strat wells $MM 600 300 400 200 200 100 0 0 2008 2009 2010 2011 2012F 2013F 2014F 2009 2010 2011F 2012F Foster Creek
Slide 12: Applying manufacturing expertise
Applying manufacturing expertise • Utilize dedicated in- house construction management teams • Employ multiple small contractors • Develop projects in staged, manageable phases • Operate assembly-line drilling & completions • Reduce execution timeline through increased development efficiency Phased
Slide 13: Putting innovation into practice
Putting innovation into practice Nisku module fabrication yard Advancing oil sands projects Regulatory First production Expected production capacity (bbls/d) Project phase application target gross filings Foster Creek Prior New Prior New A-E 120,000 F Q2-2009 2014F 35,000 45,000 G Q2-2009 2015F 35,0
Slide 14: 2012F – oil sands; Foster Creek overview
2012F – oil sands Foster Creek Christina Lake Production (Mbbls/d) 53 – 57 26 – 29 Capital ($ MM) $650 – $700 $475 - $575 Operating costs ($/bbl) $11.25 – $12.45 $13.00 – $14.35 SOR 2.0 – 2.2 1.9 – 2.1 Foster Creek overview • Pilot project began in 1996 • Became the industry’s first commercial SAGD
Slide 15: Christina Lake overview
Christina Lake overview • Pilot project began in 2000 • First production in 2002 • 58,000 bbls/d of production capacity (phases A – C) • ~31 wells currently producing • Total planned capacity of ~258,000 bbls/d Technology Milestones Phase C expansion Phase D & E expansion development Achieved first
Slide 16: Bitumen contingent resources
Bitumen contingent resources Best estimate bitumen economic contingent resources1 (Billion bbls) 2010 2009 Foster Creek Total region 0.8 0.8 Core & other areas 0.4 0.5 Christina Lake Narrows Lake 0.5 0.5 Winefred Lake 0.4 0.3 Telephone Lake 1.2 1.1 Borealis Steepbank 0.8 0.7 East McMurray 0.7 0.7 Pe
Slide 17: Commercializing one technology per year
Commercializing one technology per year Solvent processes ESP (phase 1) Wedge WellTM technology Accelerated start-up Chemical Looping Combustion Blowdown boiler Confidential project Confidential project Warm Lime Softening Confidential project Confidential project Confidential project Combustion (AI
Slide 18: Technology improves performance
Technology improves performance Mbbls/d Foster Creek ISOR 120 3.4 100 3.1 80 2.8 60 2.5 Wedge WellTM technology reduced SOR: 40 2.2 2.5 - 2.2 20 1.9 0 1.6 Jan-09 Jul-09 Jan-10 Jul-10 Jan-11 Jul-11 Total production Wedge WellTM production ISOR Blowdown boiler commercialized in 2011 • Utilizes boiler
Slide 19: Developing technology to build value
Developing technology to build value Value Blowdown boiler 5 4 Wedge WellTM 3 technology SAP 2 CondenSAP ESP (phase 2) 1 Develop Pilot Commercial Stage 1. ESP (phase 2) – early stage enhancement of pump technology 2. CondenSAP – a condensate based Solvent Aided Process 3. SAP – butane based, being p
Slide 20: Pelican Lake – tremendous growth opportunity
Pelican Lake – tremendous growth opportunity Mbbls/d 100 Opportunity to apply Grand Rapids + hot water flood technology to grow Polymer/infill production 80 Waterflood Primary 60 40 20 0 1998 2000 2002 2004 2006 2008 2010 2012F 2014F 2016F 2018F 2020F Volumes are shown before royalties. 2011F based
Slide 21: Managing our conventional assets
Managing our conventional assets 2012 highlights: • Growing liquids production by 17% • Expanding conventional oil • Optimizing natural gas • minimal natural gas investment, ALBERTA SASKATCHEWAN strong cash flow • Improving reliability Alberta • Bakken & Shaunavon centralized oil & gas facilities &
Slide 22: Optimizing natural gas operations
Optimizing natural gas operations • Flexible, scalable, reliable operations • Low operating costs • Low royalties – mostly fee land • 2012 operating cash flow* $550 – $600 MM • 2012 capital $80 – $90 MM • maintenance capital & high return CBM recompletions *Non-GAAP measure. See advisory. Lower Shau
Slide 23: Southeast Saskatchewan Bakken
Southeast Saskatchewan Bakken • Overview • 40° - 45° API light oil • ~100 - 125 Mbbls/well • ~$2.0 – 3.0 MM per well (drill, complete, tie-in) • Bakken (Viewfield & Estevan area) • 140+ undeveloped sections (fee & crown land) • 13 producing wells in Q3, 19 wells planned for 2011F Weyburn gross produ
Slide 24: CORE completion adds significant value
CORE completion adds significant value • Objectives • leverage Wood River’s strategic location • become a major processor of bitumen-blended heavy oil • Value drivers • reduces input costs • increases clean product yield • reduces asphalt production • increases crude throughput • Platform for future
Slide 25: Reducing feedstock costs
Reducing feedstock costs Crude cost advantage Price Crack spread WTI Average cost of crude Crude cost advantage Clean products Other products Crude cost advantage increases total margin available 2012 refinery margin sensitivities Net operating cash flow* ($ MM) 900 L - H differential $15.00/bbl 600
Slide 26: Understanding refinery performance
Understanding refinery performance Market vs realized crack spreads 3 1 0.45 bbls bbl bbl 0.90 2 bbl bbls Clean product yield – 85% 1.65 bbls Crude 3-2-1 Refinery Actual refinery Gasoline Diesel Other Market cracks do not account for other product pricing Market vs realized crack spreads $/bbl 25 20
Slide 27: Pipelines essential to Canadian oil growth
Increasing demand for Canadian heavy crude Refining capacity by 2020 – MMbbls/d Canada – 2.1 Heavy – 0.3 PADD IV – 0.6 PADD II – 3.9 Heavy – 0.3 Heavy – 1.6 PADD I – 1.5 Heavy – 0.2 PADD V – 3.2 Heavy – 0.8 PADD III – 8.9 Heavy – 2.6 Light sweet Light sour Heavy sour PADD III expected to be the bigg
Slide 28: Managing risk through a balanced approach
Managing risk through a balanced approach Heavy oil production integrated with refining capacity Operational Scalable conventional oil programs provide flexibility Portfolio approach to transportation requirements Self-funding model Natural gas is a financial asset & provides a natural hedge Financi
Slide 29: Key credit metrics & ratings
Key credit metrics & ratings Credit metrics Target Q3 2011 Q4 2010 Range Debt to capitalization* 28% 29% 30 – 40% Debt to adjusted EBITDA* 1.1x 1.3x 1.0 – 2.0x Total debt* $3,617 $3,432 Credit ratings Long-term Short-term S&P (13-Oct-2011) BBB+ Stable A-1 (Low) Moody’s (10-Aug-2011) Baa2 Stable P-2
Slide 30: Building flexibility into capital programs
Building flexibility into capital programs $ billions 7 Discretionary capital Cash flow Committed capital 6 5 4 3 2 1 0 Average 2010 2011F 2012F 2013F 2014F 2015F (2016F - 2021F) 2011F based on the October 27, 2011 guidance document. 2012F based on the December 7, 2011 guidance document. 2013F throu
Slide 31: Balance sheet strength provides capacity
Balance sheet strength provides capacity Debt to Capitalization* Debt to Adjusted EBITDA* Percent Times 40% 2.0 Target range Target range 30% 1.5 20% 1.0 10% 0.5 0% 0.0 2010 2011F 2012F 2013F 2014F 2015F Average 2010 2011F 2012F 2013F 2014F 2015F Average (2016F - 2021F) (2016F - 2021F) 2011F based o
Slide 32: Cenovus oil sands land map
T100 R1W5 R20W4 R15W4 R10W4 R5W4 R1W4 T100 T95 Grosmont Wabiskaw/ T95 McMurray Telephone Lake Steepbank T90 T90 East McMurray Fort McMurray GREATER PELICAN REGION BOREALIS REGION T85 Saskatchewan Wabiskaw T85 Alberta Grand Rapids Grosmont T80 CHRISTINA LAKE REGION T80 Leismer Hardy Narrows Lake T75
Slide 33: 2012 Corporate Guidance - C$, before royalties
2012 Corporate Guidance - C$, before royalties December 7, 2011 OIL SANDS Foster Creek Christina Lake Total Production (Mbbls/d) 53 - 57 26 - 29 79 - 86 (1) Operating cash flow ($ millions) 910 - 1,010 370 - 410 1,280 - 1,420 Capital expenditures ($ millions) 650 - 700 475 - 525 1,125 - 1,225 Operat
Slide 34: 2012 Corporate Guidance - C$, before royalties
2012 Corporate Guidance - C$, before royalties December 7, 2011 CONSOLIDATED (1) Total cash flow ($ billions) 2.9 - 3.5 - per common share, diluted ($/share) 3.80 - 4.60 Operating cash flow ($ billions) (1) 3.6 - 4.2 (5) Total capital expenditures ($ billions) 3.1 - 3.4 Administrative expenses ($ mi
Slide 35: 2011 Corporate Guidance - C$, before royalties
2011 Corporate Guidance - C$, before royalties October 27, 2011 OIL SANDS Q4 2011 2011 Foster Creek Production (Mbbls/d) 56 55 Operating cash flow ($ millions) (1) 195 - 215 760 - 780 Capital expenditures ($ millions) 125 - 135 415 - 425 Operating costs ($/bbl) Fuel 2.65 2.30 Non-fuel 8.90 9.10 Effe
Slide 36: 2011 Corporate Guidance - C$, before royalties
2011 Corporate Guidance - C$, before royalties October 27, 2011 CONSOLIDATED Q4 2011 2011 Total cash flow ($ billions) (1) 0.9 - 1.0 3.3 - 3.4 - per common share, diluted ($/share) 1.20 - 1.35 4.35 - 4.50 Operating cash flow ($ billions) (1) 1.0 - 1.2 3.8 - 4.0 (7) Total capital expenditures ($ bill
Slide 37: Investor Relations contacts
Investor Relations contacts Susan Grey Director, Investor Relations 403-766-4751 [email protected] Graham Ingram Analyst, Investor Relations 403-766-2849 [email protected] Bill Stait Analyst, Investor Relations 403-766-6348 [email protected]