    For personal use only NORTH AMERICA’S NEXT LITHIUM POWERHOUSE April 2025

  2. Slide 2: Investment Highlights

    Investment Highlights For personal use only ~C$69m1 strategic Offtake with PowerCo SE Potential for additional An emerging, low-cost investment from (“PowerCo”), a subsidiary of cornerstone project funding developer of lithium into Volkswagen Group to fund Volkswagen, for 100ktpa of from Volkswagen

  3. Slide 3: Strategic Partnership with Volkswagen/PowerCo

    For personal use only 1 Strategic Partnership with Volkswagen/PowerCo

  4. Slide 4: Strategic Rationale

    Strategic Rationale For personal use only Equity investment completed at a premium1 – underscores confidence in the size, quality, & strategic importance of the  Shaakichiuwaanaan Project to the North American and European battery supply chains ~C$69M2 proceeds will predominantly be used to complet

  5. Slide 5: Tier 1 Offtake Partner Secured

    Tier 1 Offtake Partner Secured For personal use only Anticipated Spodumene Production (kt SC5.5 target) 100ktpa offtake volumes Remaining volumes • Vertically integrated battery manufacturer and 100% owned subsidiary of Volkswagen - largest European based car manufacturer and leader in EV sales 900

  6. Slide 6: Shaakichiuwaanaan Project

    For personal use only 2 Shaakichiuwaanaan Project 6 TSX: PMET ASX: PMT OTCQX: PMETF WB: R9GA PMET

  7. Slide 7: Largest Lithium Pegmatite Resource in the Americas

    SHAAKICHIUWAANAAN – INVESTMENT HIGHLIGHTS Largest Lithium Pegmatite Resource in the Americas For personal use only Lithium Pegmatite Mineral Resource by Grade and Tonnage 2.00% Production Development PMET 1.80% 1.60% Shaakichiuwaanaan Grade (%Li2O) PAK + Spark Grota do Cirilo 1.40% Separation Rapids

  8. Slide 8: 2025 Winter Drill Program

    SHAAKICHIUWAANAAN PROJECT 2025 Winter Drill Program  Winter drilling began in late January and targets For personal use only 15,000m until April with three primary objectives.1 • Extend the high-grade Vega Zone (CV13 Pegmatite) westward along an interpreted structural corridor toward the CV12 Pegma

  9. Slide 9: High-Grade Discovery at CV13 — Vega Zone

    SHAAKICHIUWAANAAN — GEOLOGY/RESOURCES High-Grade Discovery at CV13 — Vega Zone1 For personal use only • New high-grade spodumene pegmatite zone discovered at CV13: • 34.4 m at 2.90% Li2O, including 21.9 m at 3.58% Li2O (CV24-470), discovery hole. • 51.7 m at 1.77% Li2O, including 9.7 m at 5.16% Li2O

  10. Slide 10: Exploration Target

    SHAAKICHIUWAANAAN — GEOLOGY/RESOURCES Exploration Target 1 For personal use only • Significant Exploration Target outlines the potential for additional tonnage at the Shaakichiuwaanaan Property. • 146 to 231 Mt at 1.0 to 1.5% Li2O. The potential quantity and grade of the Exploration Target are conce

  11. Slide 11: Other Critical Metals – Significant Cesium Discovery

    SHAAKICHIUWAANAAN — GEOLOGY/RESOURCES Other Critical Metals – Significant Cesium Discovery1 For personal use only • Cesium, an exceptionally rare and valuable critical metal, discovered over a very large area coincident with the Vega Zone of approximately 600 m x 400 m, ranging from 1-2 m to >10 m t

  12. Slide 12: UG — High-grade Mining Potential

    SHAAKICHIUWAANAAN PROJECT UG — High-grade Mining Potential For personal use only • Selectively targeting high-grade mining areas has the CV5 Side View Highlighting the High-Grade Nova Zone potential to reduce costs during periods of lower lithium pricing, improving optionality of the mine. • While a

  13. Slide 13: UG — High-grade Mining Potential

    SHAAKICHIUWAANAAN PROJECT UG — High-grade Mining Potential Diluted Recovered U/G Mineral Resource Per Grade Bin For personal use only • Mining and processing a higher grade has the effect of increasing Avg. Grade per Grade Bins Tonnes per Cumulative Cumulative the ‘yield-to-product’ derived from pro

  14. Slide 14: Feasibility Study

    SHAAKICHIUWAANAAN PROJECT Feasibility Study For personal use only • Feasibility Study well underway. • Targeting completion Q3 2025. • Simple DMS-only processing plant. • Average LOM recovery rate expected to be in line with 2 the PEA (69.5% ) • Phased approach could see the installation of a 2.5 Mt

  15. Slide 15: PEA Highlights

    SHAAKICHIUWAANAAN – PEA HIGHLIGHTS PEA Highlights For personal use only After-Tax NPV8% Real After-Tax IRR Stage 1 Net Capex Payback Period C$2.9 Billion 34% C$640 Million 2 3.6 Years (US$2.2 Billion) (US$487 Million) Estimated break-even spodumene 1 US$1,375/t (SC5.5 FOB Bécancour) price (SC6) of U

  16. Slide 16: Cree Engagement

    Cree Engagement For personal use only • Site celebrations/ceremony and feast. • Approximately 40 community members, including the Tallyman and his family. • The entire site team. • Camp Shaakichiuwaanaan • The name means climbing a hill or a mountain. • As chosen by the Tallyman, his family and supp

  17. Slide 17: ESIA Approach: Baseline Data Collection

    ESIA APPROACH Baseline Data Collection Timeline 2022 2023 2024 2025 For personal use only Activity Q1 Q2 Q3 Q4 Q1 Q2 Q3 Q4 Q1 Q2 Q3 Q4 Q1 Q2 Q3 Q4 Baseline Studies Completed Completed Underway To come Biophysical Geochemistry (phase 1; phase 2 – kinetic testing) Soils Hydrology and bathymetry Surfac

  18. Slide 18: Mining Approval Process

    SHAAKICHIUWAANAAN PROJECT Mining Approval Process For personal use only Project Description Environmental Impact Assessment Report COMEV / COMEX Deliberation Examples from ESIA submittal to authorization  Project guidelines  Baseline Data collection (nearly complete)  Alternatives Assessment  St

  19. Slide 19: Market / Industry Commentary

    For personal use only 3 Market / Industry Commentary

  20. Slide 20: Cutting into the Cost Curve

    SHAAKICHIUWAANAAN — LITHIUM MARKET COMMENTARY Cutting into the Cost Curve For personal use only • Current pricing is not high enough to 1,800 Growth Capex incentivise the new required production. 1,600 Freight / Royalties / • Supply cuts are happening with current 1,400 Sustaining Capex C1 FOB produ

  21. Slide 21: North American Downstream Landscape

    MARKET / INDUSTRY COMMENTARY North American Downstream Landscape Supply (weighted, thousand tonnes LCE) 325 For personal use only Demand (Thousand tonnes LCE) 225 153 129 24 42 Earlier Stage Fully Funded 2024 2027 2030 Operating Select EV cell plants Others 4 plants 5 plants (planned) (operating and

  22. Slide 22: Demand Growth

    For personal use only 4 Demand Growth

  23. Slide 23: Consistently Higher EV Sales

    SHAAKICHIUWAANAAN — MARKET COMMENTARY Consistently Higher EV Sales For personal use only • Lithium Iron Phosphate (LFP) cells in China are now at a very price competitive level, having halved in sale-price in the last 12 months. • EVs are now price competitive in the US market, with the cheapest 300

  24. Slide 24: BESS Demand Surging

    SHAAKICHIUWAANAAN — MARKET COMMENTARY BESS Demand Surging For personal use only • Battery Energy Storage Systems (BESS) installation has grown by 52% YoY in 2024, reaching more than 207 GWh. This is enabled due to lower LFP cell costs. • US and Canada are expected to grow at 84% YoY, with approximat

  25. Slide 25: Demand at a Tipping Point

    SHAAKICHIUWAANAAN — MARKET COMMENTARY Demand at a Tipping Point For personal use only Battery margins are being squeezed EVs Pass a Key Measure of Price Parity in US China sell spot prices and manufacturing costs Several 300-mile range EVs now cost less than the average new car 125 100 100 $/Kilowat

  26. Slide 26: Corporate Snapshot

    For personal use only 5 Corporate Snapshot

  27. Slide 27: Exploration, Resource Growth, and Project Delivery

    Exploration, Resource Growth, and Project Delivery For personal use only Continue to Drill Exploration/ Community Develop CV5 Development • Extend CV5 eastward to CV4 and • Detailed surface mapping at CV5 • Build and enhance relationships Upgraded CV5 mineral westward to CV13 and CV13 to refine geol

  28. Slide 28: Proven Management Team with a Track Record of Value Creation

    PROVEN MANAGEMENT TEAM WITH A TRACK RECORD OF VALUE CREATION For personal use only Ken Brindsen Natacha Garoute Frédéric Mercier- Darren L. Smith Alix Drapack Alex Eastwood Olivier B.Eng. (Mining), CPA, LLB Langevin M.Sc., P.Geo. P.Eng., MBA, ICD.D BEc, LLB Caza-Lapointe MAUSIMM, MAICD CFO Eng., M.S

  29. Slide 29: Corporate Snapshot

    CORPORATE SNAPSHOT Corporate Structure Shareholder Register For personal use only 3% Pro-Forma Equity Raise CAD (m) 4% 3% 0% 5% Basic Shares Outstanding 162.2 19% 15% 36% Dilutive Securities 6.5 51% Fully Diluted Shares 168.7 20% Market Cap (as of April 7th,2025) : $294 23% 21% Cash (as of Dec 31) +

  30. Slide 30: Thank you

    For personal use only Thank you PATRIOT BATTERY METALS +1 (604) 279 8709 [email protected] patriotbatterymetals.com 30 TSX: PMET ASX: PMT OTCQX: PMETF WB: R9GA PMET

  31. Slide 31: Appendix

    For personal use only Appendix

  32. Slide 32: Future Infrastructure

    SHAAKICHIUWAANAAN – MINING, PROCESSING, AND INFRASTRUCTURE Future Infrastructure For personal use only • Power – Low-carbon footprint, low-cost and mainly renewable electricity sourced from Hydro-Québec – The electrical substation will be located at the main site, approximately 55 km south of the Hy

  33. Slide 33: Infrastructure Upside, La Grande Alliance

    SHAAKICHIUWAANAAN – MINING, PROCESSING AND INFRASTRUCTURE Infrastructure Upside, La Grande Alliance For personal use only • Road between Renard Mine and the Trans-Taiga1 – During Years 6-15 of LGA plan, a proposed road extension between the Renard Mine and the Trans-Taiga Road is envisioned – This k

  34. Slide 34: Mineral Resource Statement

    CV5 AND CV13 PEGMATITES Mineral Resource Statement For personal use only Li2O Ta2O5 Contained Li2O Contained LCE Pegmatite Classification Tonnes (%) (ppm) (Mt) (Mt) Indicated 80,130,000 1.44 163 1.15 2.85 CV5 & CV13 Inferred 62,470,000 1.31 147 0.82 2.03 • Mineral Resources were prepared in accordan

  35. Slide 35: Peer Comparison – Lithium Pegmatite Mineral Resources (Americas)

    P E E R COMPARISON INFORMATION – LITHIUM PEGMATITE MINERAL RESOURCES (AMERICAS) Inclusive of Mineral Resources Company Project Stage Reserves Measured Indicated Inferred Information Source(s) Mt %Li2O Mt %Li2O Mt %Li2O Patriot Battery Metals Inc. Shaakichiuwaanaan Development – – – 80.1 1.4% 62.5 1.

  36. Slide 36: Peer Comparison – Lithium Pegmatite Mineral Reserves (Americas)

    P E E R COMPARISON INFORMATION – LITHIUM PEGMATITE MINERAL RESERVES (AMERICAS) Mineral Reserves Company Project Stage Proven Probable Information Source(s) Mt %Li2O Mt %Li2O Patriot Battery Metals Inc. Shaakichiuwaanaan Development – – – – For personal use only Sigma Lithium Corporation Grota do Cir

  37. Slide 37: Important Information

    IMPORTANT INFORMATION This presentation is dated April 9th, 2025, and has been prepared by Patriot Battery Metals Inc and funding from available government infrastructure funds. It is possible that such funding may only assumptions and factors generally associated with the mining industry; the abili

  38. Slide 38: Important Information

    IMPORTANT INFORMATION QUALIFIED/COMPETENT PERSONS the activity he is undertaking to qualify as a Competent Person as such term is defined in the JORC assays, geophysical surveys (magnetics, IP-resistivity), and remote sensing data (LiDAR and Code (2012 edition) and a Qualified Person (as such term i

  39. Slide 39: Important Information

    IMPORTANT INFORMATION NON-IFRS AND OTHER FINANCIAL MEASURES This presentation includes non-IFRS financial measures and non-IFRS financial ratios. The Company believes that these measures provide additional insight, but these measures are not standardized financial measures prescribed under IFRS and

Patriot Battery Metals — Investor Presentation (April 2025) on 6ix