Approach Resources — Investor Presentation (June 2013)
28 slides from Approach Resources's investor presentation, Jun 17, 2013
Slide 1: Investor Presentation June 2013
Exhibit 99.1 Approach Resources Inc. INVESTOR PRESENTATION JUNE 2013
Slide 2: Forward-Looking Statements
Forward-Looking Statements This presentation contains forward-looking statements within the meaning of Section 27A of the Securities Act of 1933 and Section 21E of the Securities Exchange Act of 1934. All statements, other than statements of historical facts, included in this presentation that addre
Slide 3: Company Overview
Company Overview AREX OVERVIEW ASSET OVERVIEW • Enterprise value $1.2 BN • High quality reserve base 95.5 MMBoe proved reserves 99% Permian Basin • Permian core operating area 167,000 gross (148,000 net) acres 1+ BnBoe gross, unrisked resource potential 2,000+ Identified HZ drilling locations target
Slide 4: Key Investment Highlights
Key Investment Highlights • Low-Risk, Oil-Rich Asset Base • Oil and liquids-weighted asset base in Midland Basin 167,000 gross (148,000 net) primarily contiguous acres Proved reserves are 69% liquids; 1Q13 production is 69% liquids (41% oil) • High Degree of Operational Control • Operate 100% reserv
Slide 5: Extensive Inventory of Future Wolfcamp/Wolffork Drilling Locations
Extensive Inventory of Future Wolfcamp/Wolffork Drilling Locations IDENTIFIED DRILLING LOCATIONS 887 2,983 703 2,096 690 703 HZ Wolfcamp A HZ Wolfcamp B HZ Wolfcamp C Subtotal HZ Vertical Wolffork Total Wolfcamp Gross Resource 316 311 316 943 126 1,068 Potential (MMBoe): Notes: Identified locations
Slide 6: Track Record of Reserve Growth…
Track Record of Reserve Growth… RESERVE GROWTH OIL RESERVE GROWTH Strong HZ Wolfcamp Results; 120 40 Prepare for Large-Scale Development 100 35 30 80 25 Began HZ 60 Wolfcamp Pilot 20 Program 40 15 10 Announced Launched Vertical Wolfcamp 20 5 Wolfcamp Study Pilot Results 0 0 2004 2005 2006 2007 2008
Slide 7: …and Production Growth…
…and Production Growth… PRODUCTION GROWTH OIL PRODUCTION GROWTH 9.0 1200 8.0 1000 7.0 6.0 800 5.0 600 4.0 3.0 400 2.0 200 1.0 0.0 0 2004 2005 2006 2007 2008 2009 2010 2011 2012 2009 2010 2011 2012 Natural Gas (MBoe/d) Oil & NGLs (Mbbls/d) Oil (MBbls) • 2012 production increased 24% YoY • Strong orga
Slide 8: …at Low-Cost
…at Low-Cost 3-YR AVERAGE F&D COSTS ($/Boe) LEASE OPERATING EXPENSE ($/Boe) $20.00 $19.76 $16.00 2010-2012 Drill-Bit F&D Cost ($/Boe) $18.18 1Q13 LOE ($/Boe) $14.52 $18.00 $14.00 $16.00 $12.61 $14.80 $12.00 $14.00 $13.72 $13.44 $12.89 $9.86 $12.00 $10.00 $9.35 $8.41 $10.00 $9.59 $8.00 $7.74 $7.14 $7
Slide 9: AREX Wolfcamp Oil Shale Resource Play
AREX Wolfcamp Oil Shale Resource Play PERMIAN CORE OPERATING AREA Large, primarily contiguous acreage position Oil-rich, multiple pay zones 167,000 gross (148,000 net) acres Low acreage cost ~$500 per acre 940+ MMBoe gross, unrisked HZ Wolfcamp resource potential 2,096 Identified HZ Wolfcamp locatio
Slide 10: Wolfcamp Oil Shale Play
Wolfcamp Oil Shale Play WOLFCAMP SHALE – WIDESPREAD, THICK, CONSISTENT & REPEATABLE 10
Slide 11: HZ Wolfcamp – 79% of IP is Oil
HZ Wolfcamp – 79% of IP is Oil Source: Publicly available regulatory filings, company presentations. 11
Slide 12: Wolfcamp Stacked Pay Zones
Wolfcamp Stacked Pay Zones HZ TARGETS & RESOURCE POTENTIAL AREX Baker A 112 LLD OHMM DPHI BVW 0.2 20 200 2,000 0.3 -0.1 0.2 0 GR API MSFL OHMM NPHI Free Hydrocarbon 0 200 0.2 200 -0.1 0.2 0 HZ WOLFCAMP Wolfcamp Wolfcamp Wolfcamp 20 2,000 0.3 TARGET A B C 5500 Wolfcamp Identified locations 703 690 70
Slide 13: Multiple Lateral Stacking – Effective Frac Volumes
Multiple Lateral Stacking – Effective Frac Volumes CHEVRON STACKING DEVELOPMENT PATTERN X-Section View (heel to toe) 660’ A Bench 481’ B Bench 481’ C Bench Allows maximum volumes of shale reservoir to be fraced 13
Slide 14: AREX HZ Wolfcamp Activity
AREX HZ Wolfcamp Activity Reagan Irion PW 6507H U 50 A 603HA Pangea West Crockett Schleicher • 18,000 gross acres PW 6533H PW 6601H • Pad drilling with A/B and A/C “stacked” wellbores PW 6535H PW 6502H • 3-D seismic acquisition completed. 45 C 803H ST 45 D 905H Data processing in progress 54-2 1 PW
Slide 15: HZ Wolfcamp Well Performance
HZ Wolfcamp Well Performance CONTINUED STRONG WELLS RESULTS – TRACKING ABOVE THE TYPE CURVE 1,200 1,100 Legend B Bench well data (24 wells) Recent B bench well data (7 wells) 1,000 A Bench well data (3 wells) Daily Production Data from 450 MBoe Type Curve 900 AREX Recent HZ Wells 800 700 600 Daily P
Slide 16: AREX HZ Wolfcamp Economics
AREX HZ Wolfcamp Economics Horizontal BTAX IRR SENSITIVITIES Play Type Wolfcamp 80 70 Avg. EUR (gross) 450 MBoe 60 50 Targeted Well Cost $5.5 MM 40 30 Potential Locations 2,096 20 10 Gross Resource 940+ MMBoe Potential 0 350 400 450 500 550 Well EUR (MBoe) $100 / bbl $90 / bbl $80 / bbl $70 / bbl •
Slide 17: AREX Drilling Locations, Targets & Resource Potential
AREX Drilling Locations, Targets & Resource Potential GROSS DRLLING EUR IDENTIFIED TARGET RESOURCE DEPTH (FT.) (MBoe) LOCATIONS POTENTIAL 7,000+ Wolfcamp A 450 703 316,350 (lateral length) 7,000+ Wolfcamp B 450 690 310,500 Horizontal (lateral length) Wolfcamp 7,000+ Wolfcamp C 450 703 316,350 (later
Slide 18: Infrastructure for Large-Scale Development
Infrastructure for Large-Scale Development Reagan Irion Pangea Crockett Schleicher West North & Central Pangea • Reducing D&C Cost to $5.5 MM or lower South Pangea • Reducing LOE • Minimizing truck traffic and surface disturbance • Increasing project profit margin Sutton 18
Slide 19: Infrastructure & Equipment Projects
Infrastructure & Equipment Projects PROJECTS BENEFITS Securing water supply • Facilitate large-scale field development Testing non-potable water and • Reduce fresh water use and water costs recycling flowback water • Expected savings from non-potable water source ~$0.45 MM/HZ well • Safely and secur
Slide 20: Financial Information
Financial Information NON-GAAP RECONCILIATIONS
Slide 21: 2013 Capital Budget
2013 Capital Budget • 2013 Capital budget $260 MM, approx. 90% for HZ Wolfcamp • 3 HZ rigs in the Wolfcamp shale • Targeting Wolfcamp A, B and C • Testing “stacked-wellbore” development • Optimizing well spacing and completion design • Targeting 30%+ production growth • 2013 Production guidance 3.6
Slide 22: Strong, Simple Balance Sheet
Strong, Simple Balance Sheet FINANCIAL RESULTS ($MM) 3/31/13 3/31/13 As Adj.1 Summary Balance Sheet Cash $0.6 $91.5 Revolver 152.3 – Senior Notes – 250.0 Total Debt $152.3 $250.0 Shareholders’ Equity 635.2 635.2 Total Book Capitalization $787.5 $885.2 Liquidity Borrowing Base $280.0 $315.0² Cash and
Slide 23: 2013 Operating and Financial Guidance
2013 Operating and Financial Guidance 2013 GUIDANCE • 2Q13 Production guidance 8.7 MBoe/d – 9.1 MBoe/d 2013 Guidance Production Total (MBoe) 3,600 – 3,900 Percent Oil & NGLs 70% Operating costs and expenses ($/per Boe) Lease operating $ 7.00 – 8.00 Production and ad valorem taxes $ 3.00 – 4.50 Explo
Slide 24: Hedge Position
Hedge Position • Prudent hedging program protects cash flow and returns as well as capital budget activities 53% of FY’13 oil hedged at $90.17/Bbl x $102.19/Bbl 81% of FY’13 gas hedged at weighted average floor of $3.72/MMBtu Commodity and Time Period Type Volume Price Crude Oil 2013 Collar 650 Bbls
Slide 25: Liquidity
Liquidity Liquidity (unaudited) is calculated by adding the net funds available under our revolving credit facility and cash and cash equivalents. We use liquidity as an indicator of the Company’s ability to fund development and exploration activities. Liquidity has limitations, and can vary from ye
Slide 26: EBITDAX (unaudited)
EBITDAX (unaudited) We define EBITDAX as net income, plus (1) exploration expense, (2) depletion, depreciation and amortization expense, (3) share-based compensation expense, (4) unrealized (gain) loss on commodity derivatives, (5) interest expense and (6) income taxes. EBITDAX is not a measure of n
Slide 27: F&D Costs (unaudited)
F&D Costs (unaudited) We believe that providing measures of finding and development, 2012 Reserve summary (MBoe) 3-Year Reserve summary (MBoe) or F&D, cost is useful to assist an evaluation of how much it costs Balance – 12/31/2011 76,975 Balance – 12/31/2009 36,488 the Company, on a per Boe basis,
Slide 28: Contact Information
Contact Information MEGAN P. HAYS Manager, Investor Relations & Corporate Communications 817.989.9000 x2108 [email protected] www.approachresources.com