Hudbay Minerals Inc · TSX:HBM

Hudbay Minerals — NBC CM Annual London CEO Mining Conference 2026

85 slides from Hudbay Minerals's conference presentation, Nov 23, 2026

  1. Slide 1: Investor Presentation

    Slide 1: Investor Presentation

    TSX & NYSE / HBM Investor Presentation NOVEMBER 2026

  2. Slide 2: Cautionary Information

    Slide 2: Cautionary Information

    Cautionary Information 2 This presentation contains forward-looking information within the meaning of applicable Canadian and United States securities legislation. All information contained in this presentation, other than statements of current and historical fact, is forward-looking information. Of

  3. Slide 3: Our Purpose

    Slide 3: Our Purpose

    Our Purpose 3 We care about INVESTOR PRESENTATION / NOVEMBER 2026 Our people Our communities Our planet Hudbay provides the metals the world needs. We work sustainably, transform lives and create better futures for communities. TSX & NYSE: HBM

  4. Slide 4: Diversified Mid-Tier Copper Producer

    Slide 4: Diversified Mid-Tier Copper Producer

    Diversified Mid-Tier Copper Producer 4 ANNUAL COPPER PRODUCTION & CASH COSTS1 +100% REVENUE AND RESERVES BY METAL Medium-term Growth REVENUE2 RESERVES3 3% 2% 5% 2% 2% Copper World Consolidated Copper Cash Production (000 tonnes) Consolidated Copper 8% Costs (US$/lb) 140-184 139-173 Cu 118 110-138 Au

  5. Slide 5: Delivering Strong Results with Continued Industry-Leading Margins

    Slide 5: Delivering Strong Results with Continued Industry-Leading Margins

    Delivering Strong Results with Continued Industry-Leading Margins 5 RECORD Q3 PERFORMANCE DRIVING IMPROVED COST GUIDANCE & REAFFIRMED PRODUCTION GUIDANCE KEY RESULTS SUMMARY $413M $0.34 30kt $(0.19)/lb Q3 2026 Q2 2026 Q3 2025 Q3 2026 Q3 2026 Q3 2026 Cu Q3 2026 Adj. EBITDA1 Adj. EPS1,2 Production Cas

  6. Slide 6: Record LTM EBITDA and Free Cash Flow Generation

    Slide 6: Record LTM EBITDA and Free Cash Flow Generation

    Record LTM EBITDA and Free Cash Flow Generation 6 WELL-POSITIONED TO FUND HIGH-RETURN GROWTH INITIATIVES TO UNLOCK FURTHER VALUE $631M $789M $(0.1)M 0.0x Consolidated free cash flow of $202 million with British Columbia achieving first positive free cash flow quarter in Q3 2026. LTM Free Q3 2026 Cas

  7. Slide 7: Diversified Portfolio of Long-Life Assets in Tier Jurisdictions

    Slide 7: Diversified Portfolio of Long-Life Assets in Tier Jurisdictions

    Diversified Portfolio of Long-Life Assets in Tier 1 Jurisdictions 7 OPERATING MINE DEVELOPMENT PROJECT Cu Au Ag Cu Mo Ag Au SANCTIONED DEVELOPMENT OPERATING MINE PROJECT  +20 year mine life  +15 year base case mine life  Open Pit  Open Pit COPPER MOUNTAIN  ~45kt annual Cu production COPPER WORL

  8. Slide 8: Attractive Copper Positioning

    Slide 8: Attractive Copper Positioning

    Attractive Copper Positioning 8 SIGNIFICANT COPPER PRODUCTION AT FIRST QUARTILE CASH COSTS MEANINGFUL COPPER PRODUCTION1 LEADING LOW-COST PROFILE 2026E COPPER C1 CASH COSTS2 500 ~$100M increase in cash flow and EBITDA for $4.00 ~$75M increase in cash flow and EBITDA for 10% change in annual copper p

  9. Slide 9: Hudbay Investment Thesis

    Slide 9: Hudbay Investment Thesis

    Hudbay Investment Thesis 9 INCREASING COPPER PRODUCTION AND UNIQUE GOLD EXPOSURE from three operations in tier-1 mining jurisdictions generating strong free cash flow 118kt Cu generating 268koz Au generating with industry-leading margins. +$413M in free cash flow at industry-low cash costs in 2025 P

  10. Slide 10: Peru

    Slide 10: Peru

    10 INVESTOR PRESENTATION / NOVEMBER 2026 PERU LONG LIFE, LOW COST COPPER MINE WITH SIGNIFICANT EXPLORATION POTENTIAL TSX & NYSE: HBM

  11. Slide 11: Constancia Key Highlights

    Slide 11: Constancia Key Highlights

    Constancia KEY HIGHLIGHTS 11 LONG LIFE, LOW-COST COPPER MINE IN PERU 15 YEARS Mine Life Cu-Au-Mo Porphyry Deposit 100%-owned, low-cost, long-life copper mine that has Advancing opportunities to further enhance mill been in production since 2014. Constancia is one of the throughput with pebble crushe

  12. Slide 12: Constancia Operational Excellence

    Slide 12: Constancia Operational Excellence

    Constancia Operational Excellence 12 CONTINUOUS OPERATIONAL IMPROVEMENTS AT CONSTANCIA HAVE INCREASED THROUGHPUT, ENHANCED EFFICIENCIES AND REDUCED COSTS Throughput Expansion CONSTANCIA THROUGHPUT1 100  Mill consistently operates above design capacity with strong culture of +10% continuous improvem

  13. Slide 13: Exploration Potential for Constancia Extensions at Depth

    Slide 13: Exploration Potential for Constancia Extensions at Depth

    Exploration Potential for Constancia Extensions at Depth 13 CONSTANCIA DRILLING INTERSECTS POTENTIAL HIGH-GRADE COPPER-MOLYBDENUM FEEDER SYSTEM BENEATH AND ADJACENT TO EXISTING MINERAL RESERVES AND RESOURCES CO-26-005 Current  Deep drilling intersected high-grade Cu-Mo Pit extensions below the pit

  14. Slide 14: Constancia Regional Exploration Potential

    Slide 14: Constancia Regional Exploration Potential

    Constancia Regional Exploration Potential 14 SEVERAL OPPORTUNITIES EXIST ON HUBDAY’S EXTENSIVE LAND PACKAGE IN PERU Maria Reyna Caballito Constancia & Pampacancha 3.3Mt Cu DELINEATED TO-DATE Constancia 1.1Mt Cu MINED TO-DATE Pampacancha INVESTOR PRESENTATION / NOVEMBER 2026 PERU Tintaya Lima Constan

  15. Slide 15: Constancia Priority Satellite Targets

    Slide 15: Constancia Priority Satellite Targets

    Constancia Priority Satellite Targets 15 EXPLORATION PERMITTING PROGRESSING WITH GOVERNMENT “CONSULTA PREVIA” UNDERWAY MARIA REYNA CABALLITO Artisanal mining activity focused on high grade magnetite skarn bodies and hydrothermal breccia. Mitsui mined high-grade copper at Caballito until the early 19

  16. Slide 16: Canada

    Slide 16: Canada

    16 INVESTOR PRESENTATION / NOVEMBER 2026 CANADA NEARLY 100 YEARS OF DIVERSIFIED COPPER & GOLD OPERATIONS TSX & NYSE: HBM

  17. Slide 17: Snow Lake Key Highlights

    Slide 17: Snow Lake Key Highlights

    Snow Lake KEY HIGHLIGHTS 17 LOW-COST GOLD OPERATION WITH MEANINGFUL BASE METAL PRODUCTION 18 YEARS Mine Life Au-Zn-Cu-Ag VMS Deposits 100%-owned Lalor mine in Snow Lake produces gold ore Lalor is operating at 4,500 tpd, significantly exceeding the for the New Britannia mill and base metal ore for th

  18. Slide 18: New Britannia Mill Refurbishment Driving Higher Returns

    Slide 18: New Britannia Mill Refurbishment Driving Higher Returns

    New Britannia Mill Refurbishment Driving Higher Returns 18 TIMELY STRATEGIC CAPITAL ALLOCATION AND STRONG OPERATIONAL EXECUTION TO MAXIMIZE RETURNS  2015: Acquired New Britannia for $12M as potential gold processing solution for Lalor RESULTS OF HIGH GROWTH INITIATIVE1 high grade gold ore  2020: C

  19. Slide 19: Snow Lake Cost Performance

    Slide 19: Snow Lake Cost Performance

    Snow Lake Cost Performance 19 HIGHEST MARGIN CANADIAN GOLD MINE LARGE-SCALE (>150koz) CANADIAN GOLD MINES Higher Margin Lower Margin $2,020 ~80% AISC Margin at current gold prices $1,824 $1,895 $1,633 $1,636 $1,606 $1,473 All-In Sustaining Costs (US$/oz)1 $1,331 $1,302 $1,257 $1,196 $1,205 $1,148 $1

  20. Slide 20: Snow Lake Mine Life Extension & Potential Reserve Expansion

    Slide 20: Snow Lake Mine Life Extension & Potential Reserve Expansion

    Snow Lake Mine Life Extension & Potential Reserve Expansion 20 2.0M OZ OF GOLD RESERVES & 1.5M OZ OF GOLD INFERRED RESOURCES IN SNOW LAKE Extended mine life to 2043, extending remaining mine life two additional years, and together with the four-year extension announced earlier this year, represents

  21. Slide 21: Continues Mine Life Extension & Resource Conversion

    Slide 21: Continues Mine Life Extension & Resource Conversion

    Continues Mine Life Extension & Resource Conversion 21 SNOW LAKE LOM GOLD PRODUCTION HAS INCREASED SIGNIFICANTLY SINCE THE 2012 TECHNICAL REPORT Production - Actuals and 2026 Technical Report Production - 2021 Technical Report Production - 2012 Technical Report Production Target 214 201 187 186 183

  22. Slide 22: Snow Lake Regional Satellite Deposits

    Slide 22: Snow Lake Regional Satellite Deposits

    Snow Lake Regional Satellite Deposits 22 EXPLORE REGIONAL LAND PACKAGE TO TEST SATELLITE DEPOSITS TO INCREASE PRODUCTION THROUGH UTILIZING AVAILABLE PROCESSING CAPACITY SATELLITE DEPOSITS OF INTEREST LALOR DOWN PLUNGE Cu Au RAIL Cu Au  Lalor mineralization potential continues 5 km  1.5Mt reserves

  23. Slide 23: Britannia Gold Project

    Slide 23: Britannia Gold Project

    Britannia Gold Project 23 MULTIPLE TARGETS ARE BEING DEVELOPED DOWN-PLUNGE AND ALONG STRIKE FROM KNOWN MINERALIZATION All the deposits remain open MINERALIZED CORRIDOR SPANS FIVE KNOWN DEPOSITS at depth, with high-grade ore 568 koz Au (inferred) shoots tracking in predictable 858 koz Au (produced 19

  24. Slide 24: Copper Mountain Key Highlights

    Slide 24: Copper Mountain Key Highlights

    Copper Mountain KEY HIGHLIGHTS 24 LONG LIFE COPPER MINE WITH OPTIONALITY 20 YEARS Mine Life Cu-Au-Ag Porphyry Deposit Copper Mountain mine is a conventional open pit with a Achieved its first cash flow positive quarter in Q3 2026. 50,000 tpd plant capacity. Mill optimization initiatives underway to

  25. Slide 25: Copper Mountain Optimization Achievements

    Slide 25: Copper Mountain Optimization Achievements

    Copper Mountain Optimization Achievements 25 HUDBAY HAS LEVERAGED ITS STRONG OPERATING EXPERTISE AND SOCIAL LICENSE IN BC TO GENERATE SIGNIFICANT VALUE AT COPPER MOUNTAIN OPERATING METRICS PERMITTING & SOCIAL QUARTERLY MATERIAL MOVEMENT (MT)1 AVG. DAILY MILL THROUGHPUT (KTPD) Refreshed Participation

  26. Slide 26: New Ingerbelle

    Slide 26: New Ingerbelle

    New Ingerbelle 26 EXTENDING COPPER MOUNTAIN MINE LIFE AND ENHANCING COPPER AND GOLD GRADES  KEY MILESTONES & PERMITTING Enhance production profile and extend mine life Celebrated official groundbreaking in June 2026. Secures more than 800 local jobs Received amended Mines Act and Environmental Mana

  27. Slide 27: United States

    Slide 27: United States

    27 INVESTOR PRESENTATION / NOVEMBER 2026 UNITED STATES ADVANCING NEXT MAJOR U.S. COPPER MINE TOWARDS FIRST PRODUCTION IN 2029 TSX & NYSE: HBM

  28. Slide 28: Copper World Project Key Highlights

    Slide 28: Copper World Project Key Highlights

    Copper World Project KEY HIGHLIGHTS 28 HIGHEST GRADE GREENFIELD OPEN PIT COPPER PROJECT IN THE AMERICAS BASE CASE1 EXTENSION CASE2 $1.2B $2.5B NPV 8% NPV 8% APPROVED PROJECT CONSTRUCTION COPPER PRICE SENSITIVITY ($B) 17% 19% 4.7 Base Case NPV 8% Extension NPV 8% 4.0 IRR IRR Fully permitted project o

  29. Slide 29: Copper World Project Overview

    Slide 29: Copper World Project Overview

    Copper World Project Overview 29 LARGE SCALE, FULLY-PERMITTED OPEN PIT COPPER PROJECT IN THE U.S. WITH ROBUST ECONOMICS PROJECT HIGHLIGHTS1 • Doubling Hudbay’s annual copper production with 102,000 tonnes avg. annual production over first 10 years; First production projected in One of Largest Open-P

  30. Slide 30: Prudent Copper World Financing Plan

    Slide 30: Prudent Copper World Financing Plan

    Prudent Copper World Financing Plan 30 SIGNIFICANT FINANCIAL FLEXIBILITY WITH IDEAL FUNDING STRUCTURE, ROBUST BALANCE SHEET AND CASH FLOWS 32% | 44% +$1B ~$500M IDEAL PROJECT FUNDING STRUCTURE3,5 Hudbay Hudbay Total Hudbay Capital IRR4: Hudbay Equity & Capital Mitsubishi Equity & Capital 23% Project

  31. Slide 31: Cactus Overview

    Slide 31: Cactus Overview

    Cactus Overview 31 CACTUS IS A LONG-LIFE LOW-COST COPPER DEVELOPMENT PROJECT IN A PROLIFIC MINING JURISDICTION MINERAL RESERVE AND RESOURCE ESTIMATES1,2 Located in Tier 1 jurisdiction on private land, de-risking permitting and land status. Mineral Resources are Tonnes Grade Contained inclusive of Mi

  32. Slide 32: Attractive Copper District in Arizona

    Slide 32: Attractive Copper District in Arizona

    Attractive Copper District in Arizona 32 TWO HIGH-QUALITY PROJECTS IN ARIZONA, THE "COPPER STATE" Skilled team at Copper World and comprehensive regional knowledge will be applied to the future development of Cactus: N  Replicate success with private land projects at Cactus.  Leverage the project

  33. Slide 33: Hudbay Arizona – 3rd Largest Copper District In North America

    Slide 33: Hudbay Arizona – 3rd Largest Copper District In North America

    Hudbay Arizona – 3rd Largest Copper District In North America 33 ESTABLISHING A NEW COPPER DISTRICT COPPER PRODUCTION (KT CU)1 560 483 225 174 122 INVESTOR PRESENTATION / NOVEMBER 2026 98 84 74 Freeport Arizona Grupo Mexico Arizona 2 Bingham Canyon Asarco Highland Valley Pumpkin Freeport Sonora Busi

  34. Slide 34: Mason Project Key Highlights

    Slide 34: Mason Project Key Highlights

    Mason Project KEY HIGHLIGHTS 34 LARGE OPEN PIT COPPER PROJECT WITH SIGNIFICANT LAND PACKAGE 27 YEARS Mine Life 2.2Bt M&I Tonnage Acquired in 2018, Mason is MASON ECONOMICS1 100%-owned by Hudbay and is 0.29% located in the prolific Yerington After-Tax NPV 10% (US$M) Unlevered IRR (%) M&I Cu Grade Cop

  35. Slide 35: Investment Thesis

    Slide 35: Investment Thesis

    INVESTOR PRESENTATION / NOVEMBER 2026 THESIS INVESTMENT TSX & NYSE: HBM 35

  36. Slide 36: Robust Copper Market Outlook

    Slide 36: Robust Copper Market Outlook

    Robust Copper Market Outlook 36 STRONG LONG-TERM COPPER MARKET FUNDAMENTALS WITH SIGNIFICANT SUPPLY SHORTAGE DECLINING FUTURE COPPER SUPPLY GLOBAL COPPER SUPPLY AND DEMAND1 Declining Copper Grades Copper markets are increasingly No Significant Projects Sanctioned in Past 3-Years dependent on executi

  37. Slide 37: Challenges of Supply Prediction

    Slide 37: Challenges of Supply Prediction

    Challenges of Supply Prediction 37 The analysis below compares the projected global copper production estimated by Wood Mackenzie, inclusive of development and expansion projects, as of 2020 Q4 to the latest 2025 Q4 estimates and 2020-2025 production actuals to understand how the market has changed

  38. Slide 38: A Look at Copper Pipeline Assumptions

    Slide 38: A Look at Copper Pipeline Assumptions

    A Look at Copper Pipeline Assumptions 38 PROBABLE AND POSSIBLE PIPELINE FACES SIMILAR CHALLENGES TO MEET SUPPLY PREDICTIONS PROBABLE PROJECTS (>75 KTPA CU1) POSSIBLE PROJECTS (LARGEST CONTRIBUTORS1) Production Production Timeline Production Production Timeline Project Production Production Timeline

  39. Slide 39: Copper Projects Capital Intensity Benchmarking

    Slide 39: Copper Projects Capital Intensity Benchmarking

    Copper Projects Capital Intensity Benchmarking 39 COPPER WORLD MAINTAINS ATTRACTIVE CAPITAL INTENSITY WHEN COMPARED TO PEER PROJECTS AND RECENTLY COMPLETED BUILDS Lower Capital Brownfield Project Greenfield Project Completed Greenfield Completed Brownfield Higher Capital $56.9 $44.1 Capital Intensit

  40. Slide 40: Proven Developer and Operator

    Slide 40: Proven Developer and Operator

    Proven Developer and Operator 40 HUDBAY HAS ~100 YEARS OF MINE DISCOVERY, DEVELOPMENT AND OPERATING EXPERTISE VALUE CREATION THROUGH EXPLORATION High-grade Pampacancha deposit near Constancia 1 Consistent growth through discovery of new 777 and Lalor discoveries (1990’s and 2000’s) deposits + track

  41. Slide 41: Holistic Capital Allocation Framework

    Slide 41: Holistic Capital Allocation Framework

    Holistic Capital Allocation Framework 41 CONTINUED FINANCIAL DISCIPLINE IN DELIVERING GROWTH AND MAXIMIZING LONG-TERM RISK-ADJUSTED RETURNS Transformation ND/EBITDA < 1.0x Consider risk-adjusted returns Over the last three years, Hudbay achieved a significant transformation, moving from overleverage

  42. Slide 42: Key Objectives for 2026

    Slide 42: Key Objectives for 2026

    Key Objectives for 2026 42 CONTINUED OPERATIONAL EXCELLENCE AND PRUDENT CAPITAL ALLOCATION TO DELIVER HIGH-RETURN GROWTH 1H 2026 2H 2026  Continue deleveraging and financial discipline  Copper World sanctioning decision  Progress New Ingerbelle permitting activities at Copper Mountain  Deliver o

  43. Slide 43: Industry-Leading Copper Exposure with Significant Long-term Growth

    Slide 43: Industry-Leading Copper Exposure with Significant Long-term Growth

    Industry-Leading Copper Exposure with Significant Long-term Growth 43 OUTSIZED GROWTH IN CONSOLIDATED COPPER PRODUCTION SUPPORTED BY STABLE GOLD PRODUCTION ANNUAL CONSOLIDATED COPPER PRODUCTION (KT)1 LONG-TERM PRODUCTION PROFILE1,2 +500 139 5% 13% 36 103 +620kt CuEq ~250 INVESTOR PRESENTATION / NOVE

  44. Slide 44: Appendix

    Slide 44: Appendix

    INVESTOR PRESENTATION / NOVEMBER 2026 APPENDIX TSX & NYSE: HBM 44

  45. Slide 45: World-Class Management Team

    Slide 45: World-Class Management Team

    World-Class Management Team 45 PETER KUKIELSKI EUGENE LEI ROBERT CARTER CEO PRESIDENT & CFO COO More than 30 years of sector experience Over 25 years of global mining finance, Over 29 years of mining industry experience in in base metals, precious metals and bulk investment banking and corporate dev

  46. Slide 46: Board of Directors

    Slide 46: Board of Directors

    Board of Directors 46 DAVID SMITH PETER KUKIELSKI JOHN ARMSTRONG CHAIR CEO DIRECTOR David more than 30 years of financial and Peter has more than 30 years of John has a long career as a strategic advisor, executive leadership experience. He has had experience within the base & precious including CEO

  47. Slide 47: 3-Year Production Outlook

    Slide 47: 3-Year Production Outlook

    3-Year Production Outlook 47 COPPER PRODUCTION GROWTH WITH STABLE COMPLEMENTARY GOLD EXPOSURE Consolidated copper production growth of 24% over next three years supported by B.C. mill throughput ramp up in H2 2026 and higher grades in 2027 following completion of accelerated stripping program, and f

  48. Slide 48: 2026 Cost Guidance

    Slide 48: 2026 Cost Guidance

    2026 Cost Guidance 48 GENERATIONAL INVESTMENTS IN OPERATING PORTFOLIO AND ATTRACTIVE GROWTH PROJECTS CAPITAL EXPENDITURES1,2 ($M) 2026 Year ended 2025 EXPLORATION EXPENDITURES 2026 Year ended 2025 Guidance Dec. 31, 2025 Guidance ($M) Guidance Dec. 31, 2025 Guidance SUSTAINING CAPITAL3 Peru7 15 15.9

  49. Slide 49: Prudent Balance Sheet Management

    Slide 49: Prudent Balance Sheet Management

    Prudent Balance Sheet Management 49 SIGNIFICANT FINANCIAL FLEXIBILITY AND INDUSTRY-LEADING FINANCIAL POSITION SUBSTANTIAL DEBT REDUCTION HIGH YIELD CREDIT BENCHMARK4 7.5% Mining Index, >$1B $1.2B 0.0x 7.0% 7.30% Net Debt Reduction Proforma Q3 2026 Net Debt Since 2023 Total Liquidity1,2 to Adj. EBITD

  50. Slide 50: Our People, Our Community, Our Planet

    Slide 50: Our People, Our Community, Our Planet

    Our People, Our Community, Our Planet 50 EMBRACING DIVERSITY AND PROVIDING PRIORITIZE MEANINGFUL COMMITTED TO ADVANCING A HEALTH & SAFE WORKPLACE CONNECTIONS WITH COMMUNITIES ENVIRONMENTALLY RESPONSIBLE MINING All operations are required to be certified to Understanding needs, assessing potential im

  51. Slide 51: South America Business Unit

    Slide 51: South America Business Unit

    South America Business Unit 51 Cusco CUSCO MINE Las Bambas MILL TOWN CONSTANCIA RAIL ROAD Yauri PORT Tintaya Antapaccay Llaguen INVESTOR PRESENTATION / NOVEMBER 2026 Trujillo PERU AREQUIPA Imata Lima Constancia Arequipa Cerro Verde & Matarani Matarani Port 0 TACNA 100km P E R U TSX & NYSE: HBM A

  52. Slide 52: Constancia Mine Plan

    Slide 52: Constancia Mine Plan

    Constancia Mine Plan 52 15-YEAR MINE PLAN BASED ON PROVEN AND PROBABLE RESERVES ONLY Mine plan for Constancia operations extends mine life to 2040 reflecting higher mill throughput contributions. CONSTANCIA OPERATIONS 2023A 2024A 2025A 20263 20273 20283 CONTAINED METAL IN CONCENTRATE Cu Production (

  53. Slide 53: Llaguen Project

    Slide 53: Llaguen Project

    Llaguen Project 53 COPPER PIPELINE PROJECT IN A FAVOURABLE LOCATION SECTIONAL VIEW OF PROJECT 100% owned by Hudbay. The Llaguen project is in La Libertad region in northwestern Peru. Accessible by road, 62km from the Salaverry port and 40km from the Trujillo Nueva electric substation. Hosts shallow

  54. Slide 54: Manitoba Business Unit

    Slide 54: Manitoba Business Unit

    Manitoba Business Unit New Britannia Gold Mill 54 2,500 tpd capacity Snow Lake Lalor Mine ~4,500 tpd Stall Base Metal Mill 3,800 tpd capacity MINE MILL TOWN RAIL MANITOBA ROAD 0 5km Snow Lake Flin INVESTOR PRESENTATION / NOVEMBER 2026 Flon SASKATCHEWAN MANITOBA Snow Lake Lalor Mine Flin Flon Winnipe

  55. Slide 55: Snow Lake Mine Plan

    Slide 55: Snow Lake Mine Plan

    Snow Lake Mine Plan 55 18-YEAR MINE PLAN BASED ON PROVEN AND PROBABLE RESERVES ONLY MINE PLAN OPTIMIZES PROCESSING CAPACITY IN SNOW LAKE TO EXTEND MINE LIFE TO 2043 Average Average LOM SNOW LAKE OPERATIONS 2024A 2025A 2026E 2027E 2028E 2029E 2030E 2031-2035 2036-2040 Total1 CONTAINED METAL IN CONCEN

  56. Slide 56: VMS Mines & Projects Grade Benchmarking

    Slide 56: VMS Mines & Projects Grade Benchmarking

    VMS Mines & Projects Grade Benchmarking 56 HUDBAY HOLDS SOME OF THE HIGHEST-GRADE VMS MINES AND PROJECTS IN NORTH AMERICA 4.68% Reserve Grade (AuEq g/t) Reserve Grade (CuEq %) 4.30% 4.25% 4.18% 4.46 3.87% 4.09 4.04 3.98 3.69 3.00% 2.71% 2.68% 2.66% 2.57% 2.56% 2.85 2.25% 2.58 2.55 2.54 2.45 2.44 2.1

  57. Slide 57: Snow Lake Process

    Slide 57: Snow Lake Process

    Snow Lake Process 57 4,500 tpd 2,300 tpd Lalor & 1901 ~2,200 tpd Crushed Ore STALL MILL NEW BRITANNIA MILL (3,800 tpd capacity) (2,500 tpd capacity) Grinding Grinding Cu conc. to New Britannia Cu conc. Flotation Flotation (via pipeline) INVESTOR PRESENTATION / NOVEMBER 2026 Tails Cyanide Leaching/CI

  58. Slide 58: Snow Lake Processing Logistics

    Slide 58: Snow Lake Processing Logistics

    Snow Lake Processing Logistics 58 LALOR / 1901 MINE 2026 12 years 2037 Source SATELLITE GOLD DEPOSITS 2030 14 years 2043 Ore (3 ZONE, RAIL, TALBOT, WIM) 5,000 TPD TARGET MINING RATE STALL BASE METAL MILL Processing 2026 12 years 2037 Location (WITH GOLD BY-PRODUCT) NEW BRITANNIA GOLD MILL 2026 18 ye

  59. Slide 59: Snow Lake Growth Over Time

    Slide 59: Snow Lake Growth Over Time

    Snow Lake Growth Over Time 59 OVER 3.5M OUNCES OF GOLD HAS BEEN IDENTIFIED AS RESERVES / PRODUCED TO DATE +300% INCREASE IN GOLD RESERVES SINCE 2012 Reserves Produced-to-date 8% increase 32% increase from 7% increase with mine life Inferred 47% increase inclusion of satellite 9% increase from resour

  60. Slide 60: Exploration Opportunities – Lalor Extension

    Slide 60: Exploration Opportunities – Lalor Extension

    Exploration Opportunities – Lalor Extension 60 SIGNIFICANT POTENTIAL TO CONVERT INFERRED AND FURTHER DISCOVERY OREBODY EXTENSIONS LATERALLY AND AT DEPTH Pathfinder drilling from surface is used to guide development of underground exploration drifts. As they are progressively developed, underground p

  61. Slide 61: Exploration Opportunities – 1901 Development & Exploration

    Slide 61: Exploration Opportunities – 1901 Development & Exploration

    Exploration Opportunities – 1901 Development & Exploration 61 ADVANCING 1901 DEPOSIT EXPLORATION TO CREATE ADDITIONAL VALUE THROUGH FUTURE DEVELOPMENT The 1901 deposit was discovered in 2019 and is located within 1,000 metres of the Lalor underground ramp. Pre-feasibility studies in 2021 resulted in

  62. Slide 62: Exploration Opportunities – Talbot Copper-Gold-Zinc

    Slide 62: Exploration Opportunities – Talbot Copper-Gold-Zinc

    Exploration Opportunities – Talbot Copper-Gold-Zinc 62 ADDED TALBOT TO RESERVES FOLLOWING SUCCESSFUL 2025 & 2026 DRILLING PROGRAM Talbot is a copper-gold-zinc deposit and is 100% owned by Hudbay. RESERVE AND RESOURCE CLASSIFICATION Talbot’s proximity to existing processing infrastructure in Snow Lak

  63. Slide 63: Exploration Opportunities – Snow Lake Geophysics Program

    Slide 63: Exploration Opportunities – Snow Lake Geophysics Program

    Exploration Opportunities – Snow Lake Geophysics Program 63 DEEP ELECTROMAGNETIC SURVEYS IN SEARCH OF NEW ANCHOR DISCOVERIES Large modern geophysics program underway consisting of deep surface electromagnetic surveys Limited modern geophysics conducted on highly prospective ground in the Snow Lake C

  64. Slide 64: Flin Flon Tailings Reprocessing

    Slide 64: Flin Flon Tailings Reprocessing

    Flin Flon Tailings Reprocessing 64 OPPORTUNITY TO REPROCESS FLIN FLON TAILINGS WHERE MORE THAN 100MT OF TAILINGS HAVE BEEN DEPOSITED OVER 90 YEARS Mill Tailings Reprocessing (FFT)  Potential for additional metal production while reducing reclamation liabilities.  2022 drilling indicated higher Zn,

  65. Slide 65: British Columbia Business Unit

    Slide 65: British Columbia Business Unit

    British Columbia Business Unit 65 MINE TOWN ROAD Kamloops NEW AFTON MINE BRITISH COLUMBIA HIGHLAND VALLEY COPPER MINE INVESTOR PRESENTATION / NOVEMBER 2026 Kelowna Princeton C O L U M B I A COPPER MOUNTAIN MINE Copper Mountain 0 20km Vancouver B R I T I S H TSX & NYSE: HBM A

  66. Slide 66: Copper Mountain Mine Plan

    Slide 66: Copper Mountain Mine Plan

    Copper Mountain Mine Plan 66 20-YEAR MINE PLAN BASED ON PROJECT AND PROBABLE RESERVES ONLY Copper Mountain operations reflects mine optimization initiatives and expected mine life extended two years to 2045. COPPER MOUNTAIN OPERATIONS 2024A 2025A 20265 20275 20285 LOM Total* CONTAINED METAL IN CONCE

  67. Slide 67: Arizona – U.S. Business Unit

    Slide 67: Arizona – U.S. Business Unit

    Arizona – U.S. Business Unit 67 COPPER WORLD IS A LARGE SCALE, HIGH-GRADE OPEN PIT COPPER PROJECT WITH ATTRACTIVE ECONOMICS Miami Pinto Valley Phoenix Resolution Ray Morenci Safford Florence ARIZONA, U.S. CACTUS Santa Cruz INVESTOR PRESENTATION / NOVEMBER 2026 Silver Bell Tucson Gunnison Phoenix Mis

  68. Slide 68: U.S. Open Pit Copper Benchmarking

    Slide 68: U.S. Open Pit Copper Benchmarking

    U.S. Open Pit Copper Benchmarking 68 COPPER WORLD WILL BE ONE OF THE LARGEST PRODUCING MINES IN THE U.S. WITH INDUSTRY-LEADING CASH COSTS ANNUAL PRODUCTION (KT CU)1 CASH COSTS (US$/LB CU) 225 $3.72 $3.43 $3.29 $2.80 $2.61 $2.49 $2.54 $2.36 130 $2.19 125 1 122 $1.88 INVESTOR PRESENTATION / NOVEMBER 2

  69. Slide 69: Copper World DFS – Base Case Summary

    Slide 69: Copper World DFS – Base Case Summary

    Copper World DFS – Base Case Summary 69 2026 DFS KEY METRICS – BASE CASE (at $5.00/lb LT Cu) Valuation Metrics (Unlevered)1 Units Base Case Net present value @ 8% (after-tax) $ millions $1,241 Internal rate of return (after-tax) % 16.8% Payback period # years 5.4 Project Metrics Growth capital – ini

  70. Slide 70: Copper World DFS – Extension Case Summary

    Slide 70: Copper World DFS – Extension Case Summary

    Copper World DFS – Extension Case Summary 70 2026 DFS KEY METRICS – EXTENSION CASE (at $5.00/lb LT Cu) Valuation Metrics (Unlevered)1 Units Extension Case Net present value @ 8% (after-tax) $ millions $2,510 Internal rate of return (after-tax) % 18.8% Payback period7 # years 5.4 Project Metrics Grow

  71. Slide 71: Copper World Reserves and Resources

    Slide 71: Copper World Reserves and Resources

    Copper World Reserves and Resources 71 RESERVES REPRESENT ~30% OF M&I RESOURCES, OFFERING ROBUST EXPANSION AND MINE LIFE EXTENSION POTENTIAL BASE CASE RESERVE PIT Base Case mineral reserves support a 15-year mine plan within the permitted private land is limited to 390Mt due to tailings storage limi

  72. Slide 72: Significant Investment in U.S. Critical Minerals

    Slide 72: Significant Investment in U.S. Critical Minerals

    Significant Investment in U.S. Critical Minerals 72 ARIZONA COPPER MADE FOR DOMESTIC U.S. COPPER CONSUMPTION INVESTING IN U.S. CRITICAL MINERALS INFRASTRUCTURE & SIGNIFICANT JOB CREATION +$2.1B1 +$1.1B +500 up to 3,000 Copper World represents one of the largest investments in southern Arizona's hist

  73. Slide 73: Mitsubishi Corporation: Premier Strategic Partner

    Slide 73: Mitsubishi Corporation: Premier Strategic Partner

    Mitsubishi Corporation: Premier Strategic Partner 73 LARGEST JAPANESE TRADING HOUSE & EXPERIENCED JV PARTNER AT WORLD-CLASS COPPER MINES Mitsubishi (~$80B market cap), one of the largest LARGEST MINES GLOBALLY BY 2024A COPPER PRODUCTION (kt Cu)1 Japan’s major trading houses, it is the premier 1,241

  74. Slide 74: Scarcity of Quality Copper Oxide Projects

    Slide 74: Scarcity of Quality Copper Oxide Projects

    Scarcity of Quality Copper Oxide Projects 74 CACTUS IS THE HIGHEST-GRADE UNDEVELOPED OPEN-PIT COPPER OXIDE PROJECT IN THE WORLD COPPER PROJECT BREAKDOWN COPPER RESERVE GRADE BENCHMARKING (%) & AVG. ANNUAL PRODUCTION (KT) LOM Avg. Annual Cu Production 1 265 103Kt 61Kt 0.52% 0.51% 148Kt 43Kt 0.45% 2 6

  75. Slide 75: Nevada – U.S. Business Unit

    Slide 75: Nevada – U.S. Business Unit

    Nevada – U.S. Business Unit 75 MASON PROJECT HAS THE POTENTIAL TO BE THE 3RD LARGEST COPPER MINE IN THE U.S. Power Plant Lyon County Douglas County NEVADA, U.S. MacArthur Reno INVESTOR PRESENTATION / NOVEMBER 2026 Mason Yerington Mine Project Blue Hill (Historic) MASON Yerington Mason TOWN Las Vegas

  76. Slide 76: Peru Mineral Reserves

    Slide 76: Peru Mineral Reserves

    Peru Mineral Reserves (AS AT JANUARY 1, 2026) 76 MINERAL RESERVE ESTIMATES1,2,3,4,5 TONNES Cu (%) Mo (g/t) Au (g/t) Ag (g/t) CONSTANCIA Proven 458,800,000 0.243 75 0.036 2.39 Probable 28,300,000 0.193 68 0.034 1.98 CONSTANCIA – TOTAL PROVEN AND PROBABLE 487,100,000 0.240 74 0.036 2.37 PAMPACANCHA6 P

  77. Slide 77: Peru Mineral Resources

    Slide 77: Peru Mineral Resources

    Peru Mineral Resources (AS AT JANUARY 1, 2026) 77 MINERAL RESOURCE ESTIMATES1,2,3,4,5 TONNES Cu (%) Mo (g/t) Au (g/t) Ag (g/t) CONSTANCIA Measured 106,300,000 0.232 74 0.036 2.36 Indicated 70,400,000 0.222 87 0.032 2.00 Inferred – Open Pit 27,700,000 0.271 71 0.049 2.54 Inferred – Underground 6,500,

  78. Slide 78: Snow Lake Reserves

    Slide 78: Snow Lake Reserves

    Snow Lake Reserves (AS AT SEPTEMBER 1, 2026) 78 MINERAL RESERVE ESTIMATES1,2,3,4,5,6 CATEGORY K TONNES Au (g/t) Cu (%) Zn (%) Ag (g/t) Proven Lalor 4,700 3.78 0.43 0.70 21.8 Probable Lalor 5,900 3.20 0.87 0.27 14.6 1901 300 2.66 0.75 0.68 15.2 Gold Zone Reserves WIM 3,700 1.17 1.29 0.21 5.1 Probable

  79. Slide 79: Snow Lake Reserves

    Slide 79: Snow Lake Reserves

    Snow Lake Reserves (AS AT SEPTEMBER 1, 2026) 79 MINERAL RESERVE ESTIMATES1,2,3,4,5,6 CATEGORY K TONNES Au (g/t) Cu (%) Zn (%) Ag (g/t) Total Gold and Base Metal Reserves Proven and Probable Lalor 16,400 2.92 0.55 1.76 20.5 1901 1,600 1.89 0.38 6.08 22.8 Talbot 2,700 1.46 1.92 1.14 26.5 WIM 3,700 1.1

  80. Slide 80: Snow Lake Resources – Gold Zone & Base Metals

    Slide 80: Snow Lake Resources – Gold Zone & Base Metals

    Snow Lake Resources – Gold Zone & Base Metals (AS AT SEPTEMBER 1, 2026) 80 MINERAL RESOURCE ESTIMATES1,2,3,4,5,6 CATEGORY K TONNES Au (g/t) Cu (%) Zn (%) Ag (g/t) Inferred Lalor 1,500 3.38 1.90 0.19 12.4 1901 3,300 2.87 0.94 0.49 10.2 Gold Zone Resources WIM 1,100 1.44 0.70 0.25 3.4 Total Inferred –

  81. Slide 81: Snow Lake Resources – Britannia Gold Project

    Slide 81: Snow Lake Resources – Britannia Gold Project

    Snow Lake Resources – Britannia Gold Project (AS AT SEPTEMBER 1, 2026) 81 MINERAL RESOURCE ESTIMATES1,2,3,4,5,6 CATEGORY K TONNES Au (g/t) Cu (%) Zn (%) Ag (g/t) Inferred Upper Britannia 3,200 2.83 - - - Lower Britannia 2,500 3.44 - - - Britannia Gold Project Resources Boundary 1,400 2.23 - - - Birc

  82. Slide 82: B.C. Mineral Reserves & Resources

    Slide 82: B.C. Mineral Reserves & Resources

    B.C. Mineral Reserves & Resources (AS AT JANUARY 1, 2026) 82 MINERAL RESERVE AND RESOURCE ESTIMATES1,2,3,4,5 TONNES Cu (%) Au (g/t) Ag (g/t) Reserves Proven 159,000,000 0.251 0.111 0.71 Probable 186,000,000 0.260 0.133 0.60 TOTAL PROVEN AND PROBABLE 345,000,000 0.256 0.123 0.65 Resources Measured 35

  83. Slide 83: Copper World Mineral Reserves & Resources

    Slide 83: Copper World Mineral Reserves & Resources

    Copper World Mineral Reserves & Resources (AS AT AUGUST 1, 2026) 83 MINERAL RESERVE AND RESOURCE ESTIMATES1,2,3,4,5,6 TONNES (MILLIONS) Cu (%) Mo (g/t) Au (g/t) Ag (g/t) RESERVES Proven reserves 330 0.47 105 0.024 5.25 Probable reserves 60 0.46 94 0.018 4.14 Total proven and probable reserves 390 0.

  84. Slide 84: Mason Mineral Resources

    Slide 84: Mason Mineral Resources

    Mason Mineral Resources (AS AT JANUARY 1, 2026) 84 MINERAL RESOURCE ESTIMATES1,2,3,4,5 TONNES Cu (%) Mo (g/t) Au (g/t) Ag (g/t) Measured 1,417,000,000 0.29 59 0.031 0.66 Mason Indicated 801,000,000 0.30 80 0.025 0.57 TOTAL MEASURED AND INDICATED 2,219,000,000 0.29 67 0.029 0.63 Mason Inferred 237,00

  85. Slide 85: Llaguen Mineral Resources

    Slide 85: Llaguen Mineral Resources

    Llaguen Mineral Resources (AS AT JANUARY 1, 2026) 85 MINERAL RESOURCE ESTIMATES1,2,3,4,5,6 TONNES Cu (%) Mo (g/t) Au (g/t) Ag (g/t) CuEq (%) Indicated Global (≥ 0.14% Cu) 271,000,000 0.33 218 0.033 2.04 0.42 Including Indicated High-grade (≥ 0.30% Cu) 113,000,000 0.49 261 0.046 2.73 0.60 Inferred Gl

Source: company website

More decks from Hudbay Minerals Inc

All 225 Hudbay Minerals decks