Independence Gold Corp. · TSXV:IGO

Independence Gold — Technical Presentation (July 2022)

27 slides from Independence Gold's technical presentation, Jul 29, 2022

  1. Slide 1: Independence Gold Corp. 3Ts Gold-Silver Project

    Independence Gold Corp. 3Ts Gold-Silver Project Southwest of Prince George, British Columbia July 29, 2022 Qualified Person: Allan Armitage, PhD., P.Geo. Rohan Millar, B.Sc., P.Geo.

  2. Slide 2: 3Ts Whittle Pit Optimisation Parameters and Cut-off Grade Calculation

    2022 3Ts Whittle Pit Optimisation Parameters and Parameters for Cut-off Grade Calculation Parameter Unit Value Gold Price US$ per ounce $1,750 Silver Price US$ per ounce $22 Pit Slope Degrees 55 Mining Cost (Pit) US$ per tonne mined $2.80 Mining Cost (U/G) US$ per tonne mined $80.00 Processing Cost

  3. Slide 3: 3Ts Global Resource

    2022 3Ts Global Resource 3T_Update_Total_ResourceCut Off :AuEQ Cut-Off Au_ppm_Final Ag_ppm_Final Cu_ppm_Final Zn_ppm_Final Pb_ppm_Final AuEQ Volume Tonnes Au Oz Ag Oz AuEQ Oz 0.0 3.17 83.43 134.95 894.88 554.54 4.11 2,011,503 5,431,058 553,050 14,567,785 718,077 0.1 3.17 83.47 135.01 895.31 554.80 4

  4. Slide 4: 3Ts In-Pit Resource

    2022 3Ts In-Pit Resource 3T_Update_In_Pit_ResourceCut Off :AuEQ Cut-Off Au_ppm_Final Ag_ppm_Final Cu_ppm_Final Zn_ppm_Final Pb_ppm_Final AuEQ Volume Tonnes Au Oz Ag Oz AuEQ Oz 0.0 3.21 97.91 54.96 375.07 278.76 4.28 912,391 2,463,456 254,468 7,754,347 339,333 0.1 3.21 97.94 54.98 375.20 278.86 4.29

  5. Slide 5: 3Ts Outside-Pit Resource

    2022 3Ts Outside-Pit Resource 3T_Update_Outside_Pit_ResourceCut Off :AuEQ Cut-Off Au_ppm_Final Ag_ppm_Final Cu_ppm_Final Zn_ppm_Final Pb_ppm_Final AuEQ Volume Tonnes Au Oz Ag Oz AuEQ Oz 1.0 3.30 75.34 209.22 1393.21 823.19 4.19 1,028,513 2,776,985 294,729 6,726,919 373,824 1.5 3.77 85.19 232.58 1575

  6. Slide 6: Drilling 2014 to 2022 – New Mineralisation Intercepts

    Drilling 2014 to 2022 – New Mineralisation Intercepts Tommy: Five additional drill hole intercepts Ted: Eight additional intercepts Mint: Eight additional intercepts © SGS SA 2016 ALL RIGHTS RESERVED 6

  7. Slide 7: Block Search Ranges

    2022 Block Search Ranges Name Azimuth Dip Major (y) Median (z) Minor (x) Tommy 1 354 -90 30 30 5 Tommy 2 354 -90 60 60 5 Tommy 3 354 -90 90 90 50 Mint 1 360 -90 30 30 5 Mint 2 360 -90 60 60 5 Mint 3 360 -90 90 90 50 Ted 1-1 333 -90 30 30 5 Ted 1-2 333 -90 60 60 60 Ted 2-1 345 -90 30 30 5 Ted 2-2 345

  8. Slide 8: Block Search Ellipses

    2022 Block Search Ellipses Tommy 3 Tommy 2 Tommy 1 Ted 2-1 Ted 1-1 Ted 2-2 Ted 2-3 Mint 3 Mint 2 Mint 1 Ted 1-2 © SGS SA 2016 ALL RIGHTS RESERVED 8

  9. Slide 9: Block Model Parameters

    2022 Block Model Parameters Easting (x) Northing (y) RL (z) Origin 363,550 5,876,350 650 Block Size (m) 2 5 5 No. of Blocks 726 161 121 © SGS SA 2016 ALL RIGHTS RESERVED 9

  10. Slide 10: Block Estimation Parameters

    2022 Block Estimation Parameters Calculation Method ID2 Search Type Variable Ellipsoid Pass 1 Pass 2 Pass 3 Tommy Vein, Ted Vein Minimum Samples 4 4 2 Maximum Samples 15 15 15 Maximum Samples per Drill Hole 2 2 - Mint Vein Minimum Samples 3 3 2 Maximum Samples 15 15 15 Maximum Samples per Drill Hole

  11. Slide 11: 2014 Mineralised Outlines with Drilling to 2013

    2014 Mineralised Outlines with Drilling to 2013 Mint Vein Tommy Vein Ted Vein © SGS SA 2016 ALL RIGHTS RESERVED 11

  12. Slide 12: 2014 Mineralised Outlines with Drilling to 2022

    2014 Mineralised Outlines with Drilling to 2022 Mint Vein Tommy Vein Ted Vein © SGS SA 2016 ALL RIGHTS RESERVED 12

  13. Slide 13: 2014 Mineralised Outlines with Drilling 2014 to 2022

    2014 Mineralised Outlines with Drilling 2014 to 2022 Mint Vein Tommy Vein Ted Vein © SGS SA 2016 ALL RIGHTS RESERVED 13

  14. Slide 14: 2014 Mineralised Outlines versus 2022 Mineralised Outlines

    2014 Mineralised Outlines versus 2022 Mineralised Outlines Mint Vein Tommy Vein Ted Vein © SGS SA 2016 ALL RIGHTS RESERVED 14

  15. Slide 15: 2014 Tommy Vein versus 2022 Tommy Vein

    2014 Tommy Vein versus 2022 Tommy Vein Five additional drill hole intercepts since 2014 N © SGS SA 2016 ALL RIGHTS RESERVED 15

  16. Slide 16: Tommy Vein with new Block Model

    2022 Tommy Vein with new Block Model © SGS SA 2016 ALL RIGHTS RESERVED 16

  17. Slide 17: 2014 Mint Vein versus 2022 Mint Vein

    2014 Mint Vein versus 2022 Mint Vein N N Eight additional drill hole intercepts since 2014 © SGS SA 2016 ALL RIGHTS RESERVED 17

  18. Slide 18: Mint Vein with new Block Model

    2022 Mint Vein with new Block Model N N © SGS SA 2016 ALL RIGHTS RESERVED 18

  19. Slide 19: 2014 Ted Vein versus 2022 Ted Vein

    2014 Ted Vein versus 2022 Ted Vein N N Eight additional drill hole intercepts since 2014 © SGS SA 2016 ALL RIGHTS RESERVED 19

  20. Slide 20: Ted Vein with new Block Model

    2022 Ted Vein with new Block Model N N © SGS SA 2016 ALL RIGHTS RESERVED 20

  21. Slide 21: 2014 Diorite Model

    2014 Diorite Model Tommy Vein N Diorite Sill Ted Vein Mint Vein © SGS SA 2016 ALL RIGHTS RESERVED 21

  22. Slide 22: 2022 Diorite Model

    2022 Diorite Model Tommy Vein N Diorite Sill Ted Vein Mint Vein © SGS SA 2016 ALL RIGHTS RESERVED 22

  23. Slide 23: Block Model with Pits

    2022 Block Model with Pits N Tommy Pit Ted Pit Mint Pit © SGS SA 2016 ALL RIGHTS RESERVED 23

  24. Slide 24: Block Model with Pits and Diorite

    2022 Block Model with Pits and Diorite Tommy Pit N Diorite Sill Mint Pit Ted Pit © SGS SA 2016 ALL RIGHTS RESERVED 24

  25. Slide 25: Block Model cut to Pit Surfaces

    2022 Block Model cut to Pit Surfaces Tommy Pit N Ted Pit Mint Pit © SGS SA 2016 ALL RIGHTS RESERVED 25

  26. Slide 26: Block Model cut to Pit Surfaces

    2022 Block Model cut to Pit Surfaces N Tommy In-Pit Resource Ted In-Pit Resource Mint In-Pit Resource © SGS SA 2016 ALL RIGHTS RESERVED 26

  27. Slide 27: WWW.SGS.COM

    WWW.SGS.COM WHEN YOU NEED TO BE SURE -SGS"

Independence Gold — Technical Presentation (July 2022) on 6ix