    FORWARD-LOOKING STATEMENTS Certain statements contained in this presentation that are forward- looking in nature are based on the current beliefs and assumptions of the Company’s management. When used in this presentation, the words "may," "could," "should," "anticipate," "believe," "estimate," "exp

  3. Slide 3: Disclosure of Exploration Results & Historical Estimates

    DISCLOSURE OF EXPLORATION RESULTS & HISTORICAL ESTIMATES • Exploration activities were conducted on Noble’s Projects prior to the adoption of National Instrument 43-101 (“NI 43-101”), as well as more recently when NI 43-101 was in force. • Historical Exploration results that pre-date the adoption of

  4. Slide 4: Project Generator Focused on Battery and Critical Minerals

    PROJECT GENERATOR FOCUSED ON BATTERY AND CRITICAL MINERALS • Project 81 ~18,000ha in the Timmins-Cochrane area of Northern Ontario, for which it holds 5 year exploration rights for VMS and Gold; • Carnegie/Kidd 2 – Multiple VMS targets located 3-4 kms north of the Kidd Creek Mine; • Dargavel Gold Tr

  5. Slide 5: Exploration Projects 2022

    EXPLORATION PROJECTS 2022 March 205

  6. Slide 6: Project 81 Historical Exploration Activities

    PROJECT 81 HISTORICAL EXPLORATION ACTIVITIES Drill Indicated Gold Showings Gold Targets VMS Targets Dargavel Gold Trend Lucas Gold Zone Nickel Target

  7. Slide 7: Google Map Showing Timmins Area Infrastructure

    GOOGLE MAP SHOWING TIMMINS AREA INFRASTRUCTURE • Significant industry services, supplies and infrastructure in place in Timmins with access by paved Highway 655 • Ample access to high tension power and water • MoU signed with First Nations • Drill programs proposed for Summer/Fall 2025 March 2025

  8. Slide 8: Under Explored Project Area

    PROJECT 81 HISTORICAL EXPLORATION ACTIVITIES • Under Explored Project Area ~18,000 ha • MNDM database showing the lack of exploration within the Project 81 area • VMS Targets • Gold Targets • Noble Drill programs proposed for Summer/Fall 2025 March 2025

  9. Slide 9: CNC Projects (Nickel + Cobalt +/- PGM)

    CNC PROJECTS (NICKEL + COBALT +/- PGM) • Project 81’s Area Play is a ~18,000ha Canada Nickel Land Package - Targets/Showings • Located Crawford Nickel-Cobalt approximately 30 km Deposit north of Timmins Kingsmill Nickel-Cobalt world famous for Deposit >75mm oz. of Au production Noble Project 81 • 2-

  10. Slide 10: Geology for the Carnegie Kidd 2 Project

    GGEOLOGY FOR THE CARNEGIE KIDD 2 PROJECT • Geological Map of the Kidd Creek Area showing Relation of Area Rhyolites to the Kidd Creek Rhyolite • Down hole Geophysics Summer 2025 March 2025

  11. Slide 11: Target A for the Carnegie Kidd 2 Project

    TARGET A FOR THE CARNEGIE KIDD 2 PROJECT • Plan showing the location of the chargeability anomaly and proposed drill holes. • The yellow stars indicate mineralization encountered in past drill programs. March 2025

  12. Slide 12: Chargeability and Metal Factor Anomaly for Target A

    CHARGEABILITY AND METAL FACTOR ANOMALY FOR TARGET A Pseudo-section with the corresponding resistivity and metal factor March 2025

  13. Slide 13: Mann Township Staked and Optioned Claims

    MANN TOWNSHIP STAKED AND OPTIONED CLAIMS March 2025

  14. Slide 14: Mann Township Staked and Optioned Claims

    MANN TOWNSHIP STAKED AND OPTIONED CLAIMS March 2025

  15. Slide 15: Mann Township Northwest, Central and Southeast Zones

    MANN TOWNSHIP NORTHWEST, CENTRAL AND SOUTHEAST ZONES • The Mann properties are optioned to Canada Nickel Mann Northwest: 6.0 km2 who has carried out Airborne EM/Mag and Gravity • Mann Northwest, Mann Central and Mann South have been drilled including Mann Central: 3.1 km2 a total of holes with resul

  16. Slide 16: The Cousineau Boulder

    THE COUSINEAU BOULDER March 2025

  17. Slide 17: The Cousineau Boulder

    THE COUSINEAU BOULDER March 2025

  18. Slide 18: Boulder Mag and EM Picks with Ice Trains Identified

    BOULDER MAG AND EM PICKS WITH ICE TRAINS IDENTIFIED Boulder Cdn$ to US$ 1.35 ppm US$/lb or oz Cdn$/lb or oz Cdn$ Value Cu 718760 71.88 % 4.62 6.24 9867.6864 Ni 3338 0.33 % 8.30 11.21 81.3846 Pb 34922 3.49 % 0.99 1.34 102.8852 Zn 10929 1.09 % 1.27 1.71 41.0058 Au 3.79 3.79 g/t 2,355.00 3,179.25 388.6

  19. Slide 19: Thomas Township Potential Carbonatite

    THOMAS TOWNSHIP POTENTIAL CARBONATITE March 2025

  20. Slide 20: Dargavel & Aubin Townships

    DARGAVEL & AUBIN TOWNSHIPS March 2025

  21. Slide 21: Dargavel Grid for IP Survey Completed Fall 2021

    DARGAVEL GRID FOR IP SURVEY COMPLETED FALL 2021 March 2025

  22. Slide 22: Dargavel IP Survey Results (Line 600MS)

    DARGAVEL IP SURVEY RESULTS (Line 600MS) March 2025

  23. Slide 23: Dargavel Gold Historic Trend & Noble Drill Holes

    DARGAVEL GOLD HISTORIC TREND & NOBLE DRILL HOLES March 2025

  24. Slide 24: Dargavel 2020 Noble Drill Campaign

    DARGAVEL 2020 NOBLE DRILL CAMPAIGN March 2025

  25. Slide 25: Dargavel 2022 Drill Campaign

    DARGAVEL 2022 DRILL CAMPAIGN March 2025

  26. Slide 26: Dargavel 2020 Noble Drill Results

    DARGAVEL 2020 NOBLE DRILL RESULTS March 2025

  27. Slide 27: Lucas Gold Target - Geology

    LUCAS GOLD TARGET - GEOLOGY L-81-27 6.24 gpt Au over 0.61 m @ 230.43-231.04 m L-81-30 6.56 gpt Au over 0.91 m @ 166.42- L-80-15 167.34 m and 6.08 gpt Au over 0.91 9.28 gpt Au over m @ 170.99-171.91 m 0.61 m @ 127.71- L-80-13 128.32 m L-81-25 5.28 gpt Au over 5.12 gpt Au over 1.22 m 1.55 m @ 123.14-

  28. Slide 28: Lucas 2018 Drill Campaign Results

    LUCAS 2018 DRILL CAMPAIGN RESULTS BHID Au Assay Highlights including LUC-18-07 0.87 gpt over 6.50m 1.41 gpt over 3.50m LUC-18-08 0.24 gpt over 4.30m LUC-18-09 0.59 gpt over 1.70m LUC-18-10 None 1.20 gpt over 7.00m; LUC-18-11 1.10 gpt over 30.90m 4.33 gpt over 5.15m LUC-18-12 None LUC-18-13 1.15 gpt

  29. Slide 29: Lucas Gold Target - 3D Modelling

    LUCAS GOLD TARGET - 3D MODELLING • All historical drillholes compiled have been consolidated using new lithology and assays legends • Grade shells created to help understanding structural controls • Overall mineralization plunging to the NW, but with high grade veining almost flat • Stacked high gra

  30. Slide 30: Noble Mineral Exploration Share Capital

    NOBLE MINERAL EXPLORATION SHARE CAPITAL TSX.V: NOB (Toronto) Listings: FWB: NB7 (Frankfurt) OTCQB: NLPXF (US) Common Shares: 237,299,404 Warrants ($0.11- 0.175): 9,587,833 Stock Options/RSU’s: 10,440,000 Fully Diluted: 257,327,237 Recent Share Price: $0.07 Market Capitalization: $15.4 million 52 Wee

  31. Slide 31: The Discovery Curve - Relative Share Price

    THE DISCOVERY CURVE Production from RELATIVE SHARE PRICE Depleting Asset Deposit Defined NOBLE Early Stage Target Resource Definition, Mine Exploration Drilling PFS/Permitting Construction March 2025

  32. Slide 32: Management and Contact Details

    TSX-V: NOB - FWB: NB7 - OTCQX: NLPXF Management: H. Vance White, President & Chief Executive Officer Wayne Holmstead P Geo (ON) Exploration Manager Mitchell E Lavery P. Geo. and Isabelle Robillard P.Geo. M Sc. QP for Quebec Content Corinna de Beer, Corporate Communications 2500 – 120 Adelaide St. W