Carolina Rush Corporation · TSXV:RUSH
Carolina Rush — Investor Presentation (January 2024)
40 slides from Carolina Rush's investor presentation, Jan 10, 2024
Slide 1: Exploring for Gold and Copper in the Southeast USA
Exploring for Gold and Copper in the Southeast USA Corporate Presentation – Q1 - 2024 Cover Photo: Reclaimed Brewer Open Pit/Heap Leach Mine Site, South Carolina, USA
Slide 2: Disclaimer
Disclaimer This Presentation is not an offer to buy or sell the securities referenced herein, nor has the Securities and Exchange Commission or any state, provincial or territorial regulatory authority determined if this Presentation is truthful or complete. Any representation to the contrary is a c
Slide 3: Southeast USA: North America's First Gold District
SOUTHEAST USA: NORTH AMERICA’S FIRST GOLD DISTRICT Carolina Terrane: 10.35 M oz Gold Endowment • Porphyry/epithermal and orogenic gold mineralization • Gold discovered 50 years before California • 1,493 mines and prospects documented GEOLOGICAL SETTING OF EASTERN NORTH AMERICA Brewer Haile Carolina
Slide 4: Projects
PROJECTS BREWER MINE SAWYER & NEW SAWYER EXPANDED REGIONAL PROGRAM Epithermal & Porphyry Copper-Gold Target Two historic Gold Mine Acquired Management Commitment • Historic open pit gold mine: produced • Sawyer Trend gold properties: +20 km • 7 additional new targets identified: +200,000 oz Au struc
Slide 5: Carolina RUSH Has Historic Gold Mines
Carolina RUSH Has 3 Historic Gold Mines * Sawyer Trend Brewer Golden Triangle (BC) Mine Same Scale * USGS Professional Paper 213 CAROLINA TERRANE IS 400 km NE-SW BY 100 km NW-SE = 40,000 km2 and contains Hundreds of Historic Mines Q1 - 2024 TSXV: RUSH | OTCQB: PUCCF 5
Slide 6: Brewer Mine, Next to Haile Mine
Brewer Mine, Next to Haile Mine Table 1. Brewer Mine Production : 1987 – 1993 km/ iles Location Ore Tonnes Waste Tonnes Total Tonnes Grade (g/t) Au Oz (calc) 17 .6 m 10 Brewer 4,487,441 4,500,617 8,869,699 1.20 173,150 B6 556,929 1,578,809 2,135,738 1.27 22,717 NW Trend 92,268 330,039 433,843 1.06 3
Slide 7: Phase I & II Data Driven Exploration
Phase I & II Data Driven Exploration Brewer Near Surface Resource Target CORE DRILLING • Inaugural drill program: 17 holes, 5,400m drilled • Highlights include: • B21C-005: 181.6 m @ 1.24 g/t Au, 0.27% Cu from 56 m depth Including: 10.1 m @ 8.20 g/t Au, 0.24% Cu from 65 m depth • B21C-008: 106.5 m @
Slide 8: Reclaimed Pits: ~11.9 Mt @ 0.36 g/t – 137,000 oz Au
RECLAIMED PITS: ~11.9 Mt @ 0.36 g/t – 137,000 oz Au * Reclaimed Backfill Material (vertical section, looking west) Waste Rock contains estimated 74,000 oz @ 0.5 g/t Au* * The Company cautions that a Qualified Person has not done sufficient work to classify the Historic Estimate as current mineral re
Slide 9: Brewer Core Drilling To Date
Brewer Core Drilling To Date Summary of Best Intersections in Each Hole Rank Drill Hole From To Interval Au Cu Au (m) (m) (m) (g/t) (%) GxT 1 B21C-005 56.00 237.60 181.60 1.24 0.27 225 2 B21C-008 52.00 158.50 106.50 1.07 0.26 114 3 B20C-004 66.41 182.00 115.59 0.91 0.17 105 4 B23C-018 166.50 241.00
Slide 10: Brewer Core Drilling To Date
Brewer Core Drilling To Date Au GxT Highlights Drill Hole From (m) To (m) Interval (m) Au (g/t) Cu (%) Au GxT Au GxT SUM 94.92 124.50 29.58 0.97 0.09 28.6 B20C-004 101.5 128.00 182.00 54.00 1.21 0.29 65.2 56.00 92.89 36.89 3.03 0.30 111.9 B21C-005 93.19 145.22 52.03 1.05 0.19 54.4 221.4 165.20 216.5
Slide 11: Brewer Phase I & II Drill Program
Brewer Phase I & II Drill Program Best Copper Results RUSH Core Drilling BHID From (m) To (m) Interval (m) Au* (g/t) Cu* (%) B20C-004 161.4 169.0 7.6 2,96 0.97 B21C-005 71.9 87.5 15.6 1.43 0.54 and 190.9 210.2 19.3 0.86 0.65 and 221.0 226.0 5.0 0.45 0.51 B21C-008 105.5 149.2 43.7 2.05 0.54 B21C-015
Slide 12: Lithology, Mineralization & Alteration
Lithology, Mineralization & Alteration Breccia and Mineralization B21C-005: 165.4 m B21C-008: 120.3 m B21C-008: 104.5 m B21C-008: 67.6 m Multiple episodes of brecciation and Sub-rounded, polyphase, clast-supported, Angular, monolithic, matrix-supported Large, mineralized quartz-porphyry clast within
Slide 13: Brewer 2D-IP Geophysics
Brewer 2D-IP Geophysics • Extensive Dipole-Dipole IP-Resistivity survey in 2022 across Brewer and surrounding Jefferson properties • 61.5 line km surveyed, A=100, N=8, ~250m depth of investigation • Integrated with geologic model and covers exploration targets to south and west of former mine Q1 - 2
Slide 14: Brewer 2022 Induced Polarization Survey
Brewer 2022 Induced Polarization Survey B21B-11: Shallow RAB hole near peak of anomaly ended in 6 m B21C 015: Core hole discovered new zone of breccia-hosted @ 1 g/t Au Au – Cu mineralization (open in all directions) B21B-111 B21C-15 Polarizable - Resistive Polarizable - Conductive Resistivity and C
Slide 15: Brewer Geology & Copper Model
Porphyry Cu Model Brewer Geology & Copper Model Cross-Section Diatreme Breccias and Porphyry Target Brewer Level • Lithocap forms prominent topographic high • High-Level diatreme at surface, above porphyry system at depth Q1 - 2024 TSXV: RUSH | OTCQB: PUCCF 15
Slide 16: Brewer Breccia & Target Map
Brewer Breccia & Target Map • IP target areas superimposed on the Alteration/Breccias of the mine • Strong correlation between IP target areas and mapped breccia bodies, which hosts mineralization within the main Brewer Pit Tanyard Sediments – Sericite/Silica Gossan Possible Second Maar Diatreme at
Slide 17: 2023 Exploration Program
2023 Exploration Program D.P. Brewer Target Areas Pit: Brewer Pit (700 – 1,000 m) • 2 holes planned to step out on best intercepts (004 & 008) • Provisional third hole to test continuity of mineralization between 004 & 005 • Define extents of mineralization beneath pit, following up on Phase I & II
Slide 18: Phase III Drilling at Brewer
Phase III Drilling at Brewer Brewer Pit Area B23C-019 B23C-020 B23C-018 Q1 - 2024 18
Slide 19: Phase III Drilling at Brewer
Phase III Drilling at Brewer Brewer Pit Area (B23C-018) B23C-018 Section B – B’: 4475N From Interval Au BHID To (m) Cu (%) (m) (m) (g/t) B21C-008 52.00 158.50 106.50 1.07 0.26 Incl. 104.00 149.23 45.23 2.03 0.52 Incl. 141.00 149.23 8.23 5.04 1.43 Section B – B’: 5534475N From Interval Au BHID To (m)
Slide 20: Phase III Drilling at Brewer
Phase III Drilling at Brewer B23C-019 Brewer Pit Area (B23C-019) E E’ Section E – E’: 4625N B23C-019 B21C-005 BHID From To (m) Interval Au Cu (%) (m) (m) (g/t) B21C-005 56.00 237.60 181.60 1.24 0.27 Incl. 62.00 137.00 75.00 2.14 0.26 Incl. 64.90 89.10 24.20 4.26 0.42 B20C-002 Incl. 64.90 67.90 3.00
Slide 21: Phase III Drilling at Brewer
Phase III Drilling at Brewer Brewer Pit Area (B23C-020) B23C-020 D D’ B97-2 B23C-20 B20C-004 Section D – D’: 4575N From Interval Au BHID To (m) Cu (%) (m) (m) (g/t) RUSH DDH (Au left/Cu right) B20C-004 66.41 182.00 115.59 0.91 0.17 v Incl. 104.00 175.00 71.00 1.24 0.27 Proposed DDH Incl. 150.50 166.
Slide 22: Phase III Drilling: Following up on Initial Success
Phase III Drilling: Following up on Initial Success Ty-Bx B23C-021 – results pending Vertical Section Looking West Visuals for B23C-021 – Chalcocite at 135 m 4 5 -011 00 00 1C C- C- 1C -01 5 B23C-021 -00 9 B2 1C -00 8 B 20 B 21 B2 B2 2 1C B B21C-015: 62m of 1.0 g/t Au, 0.2% Cu, incl. 21m of 2.2 g/t
Slide 23: Visuals from Current Drilling at Brewer
Visuals from Current Drilling at Brewer B23C-018 B23C-021 Chalcocite at 135 m Massive sulfide zone from 203 to 213 m depth. Note Massive sulfide interval from ~140 – 149 m chalcocite (cct), a copper sulphide mineral at 209.5 m Q1 - 2024 TSXV: RUSH | OTCQB: PUCCF 23
Slide 24: Sawyer Trend Properties in Randolph County, North Carolina
Sawyer Trend Properties in Randolph County, North Carolina An Alignment of Gold Deposits over a 20 km long Trend New Sawyer Sawyer -Exploring the +20 km Long Sawyer-Keystone Gold Trend -Recently recognized trend of Haile-type historic gold mines -No modern exploration programs completed Possible ant
Slide 25: Sawyer Historic Gold Mine
Sawyer Historic Gold Mine Randolph County, North Carolina Aerial Photo of the Sawyer Mine Property Historic mineral resource estimate (2021)* at Sawyer Mine: • 3.9 million tonnes at 1.1 g/t Au for 134,600 oz of gold Mineralization • is outcropping and near surface • occurs in 4 parallel zones • open
Slide 26: Sawyer: Recent Verification Trenches
Sawyer Recent Verification Trenches of Historic Data – Assays Pending Primary Host: QSP Altered Felsic Volcanic and Sediment ST 23 01: 0 – 36 m ST 23 02: 0 – 40 m Trench ST 23 01 Trench ST 23 02 Q1 - 2024 TSXV: RUSH | OTCQB: PUCCF 26
Slide 27: New Sawyer Historic Gold Mine
New Sawyer Historic Gold Mine • Gold was produced from multiple zones hosted in Haile-type sericite-pyrite-clay alteration • Large, structurally controlled alteration zone • 700m + 200m long gold Geochem anomaly • 12 vertical shafts • The Sawyer and New Sawyer Mines have potential for: • near surfac
Slide 28: New Sawyer Verification Trenches
New Sawyer Verification Trenches of Historic Data From To Interval Trench NS-1 Trench NS-2 Trench ID (m) (m) (m) Au (g/t) NS-1 0 30 30 1.6 Incl. 12 28 16 2.2 NS-2 0 30 30 1.0 Incl. 20 30 10 2.1 Primary Host: QSP Altered Felsic Volcanic Historic Shaft Next To Trench NS-1 Q1 - 2024 TSXV: RUSH | OTCQB:
Slide 29: Summary
SUMMARY BREWER TARGETS ARE HIGHLY SAWYER GOLD TREND EXPLORATION ADVANCED REGIONAL COMPILATION PROSPECTIVE PROGRAM AND INTERPRETATION • Immediate near surface resource • New deposits – no modern exploration • 7 targets identified, review and acquisition in definition and production potential • Resour
Slide 30: Capital Structure
Capital Structure TSXV: RUSH | OTCQB: PUCCF Capital Structure Retail 10% Shares Outstanding 42,865,122 Institutions 14% Warrants 14,048,984 Board, Management & Strategic Advisors Options 3,546,000 55% High Net Worth Investors Fully Diluted 60,460,106 21% 52-Week Range $0.45 - $0.10 Market Capitaliza
Slide 31: Management Team Aligned to Capitalize on New Discoveries
Management Team Aligned to Capitalize on New Discoveries Technical Experience and Seasoned Management Layton Croft – President, CEO and Director Patrick Quigley, MSc, QP – Exploration Manager and Senior Geologist • Executive with +20 years of global minerals and mining industry • Mining geologist wi
Slide 32: Technical Experience and Seasoned Governance
Technical Experience and Seasoned Governance Board of Directors Strategic Advisors Layton Croft– Executive Director David Mosher • Executive with +20 years of global minerals and mining industry experience including • Mining geologist and executive with 45+ years of global experience senior roles wi
Slide 33: For more information, please contact
For more information, please contact: Layton Croft, President & CEO Jeanny So, Corporate Communications Manager [email protected] [email protected] www.thecarolinarush.com LinkedIn: @Carolina-Rush Twitter: @TheCarolinaRush YouTube: @CarolinaRush Q1 - 2024 TSXV: RUSH | OTCQB: PUCCF 33
Slide 34: Appendix
Appendix Q1 - 2024 TSXV: RUSH | OTCQB: PUCCF 34
Slide 35: Brewer Lithology, Mineralization & Alteration
Brewer Lithology, Mineralization & Alteration Lithology: Aluminosilicate Alteration – Proximal B21C-005: 258.8m B21C-010: 115.7m B21C-004: 477.8m B21C-015: 101.5m Topaz-only SWIR assemblage. “K-P-T” SWIR assemblage. SWIR: K-P-T + alunite. Patchy Pyrophyllite. Coarse radiating pyrophyllite, Patchy to
Slide 36: Top 10 Brewer Core Drill Results to Date
Top 10 Brewer Core Drill Results to Date Summary of Best Results Rank Drill Hole From To Interval Au Cu Rank Drill Hole From To Interval Au Cu (m) (m) (m) (g/t) (%) (m) (m) (m) (g/t) (%) B21C-005 56.00 237.60 181.60 1.24 0.27 B21C-015 44.60 107.00 62.40 1.03 0.15 Incl. 60.00 212.00 152.00 1.40 0.27
Slide 37: Sawyer & New Sawyer VTEM Survey
Sawyer & New Sawyer VTEM Survey • High Resolution airborne VTEM Survey and Magnetics Survey (2020) • Provides alteration and geological data for Targeting • Advanced exploration data covering the entire Sawyer Trend Q1 - 2024 TSXV: RUSH | OTCQB: PUCCF 37
Slide 38: Sawyer Gold Mine
Sawyer Gold Mine Gold Values in Ounce per Short Ton * The Property line does not accurately reflect the current property and gold assay values Historic mine and mineralization map have not been confirmed Q1 - 2024 TSXV: RUSH | OTCQB: PUCCF 38
Slide 39: Sawyer Gold Mine
Sawyer Gold Mine Gold Resource Block Model Colour Coded by Grade with Potential Mineral Resource Summary Historic Estimate*: • 3.9 million tonnes at 1.1 g/t Au for 134,600 oz of gold at 0.4 g/t COG Drilling: • 29 core holes • 134 RC holes • 10,081 metres (*) The Company cautions that a Qualified Per
Slide 40: Sawyer Gold Mine
Sawyer Gold Mine Surface Topography and Example of Historic Mining (View North) Q1 - 2024 TSXV: RUSH | OTCQB: PUCCF 40