Amplitude Energy Limited · ASX:AEL

Amplitude Energy — Cooper Energy — Shareholder Meeting (November 2003)

24 slides from Amplitude Energy's shareholder meeting presentation, Nov 28, 2003

  1. Slide 1: Annual General Meeting

    ANNUAL GENERAL MEETING Friday 28 November, 2003 Tony Wright DIRECTOR OF OPERATIONS

  2. Slide 2: Introduction

    Introduction ¾ COE Model ¾ Proven province ¾ Onshore ¾ Under explored ¾ Selective acreage ¾ Existing infrastructure

  3. Slide 3: Infrastructure: Oil & Gas hub

    Infrastructure: Oil & Gas hub ¾ Established pipeline access to eastern and southern seaboard Cooper Basin markets ¾ Infrastructure provides basis for early cash flow from discoveries

  4. Slide 4: Tenement interests and infrastructure

    Cooper Cooper Basin Basin Tenement interests and Kiwi-1 Gas Discovery infrastructure

  5. Slide 5: This time last year

    This time last year ¾ Partners ¾ Prospects ¾ Percentages ¾ Production

  6. Slide 6: PEL 92 oil fairway

    PEL 92 oil fairway SELLICKS SELLICKS 11 Carrickalinga 1 CHRISTIES CHRISTIES 11 Brighton1 Moana 1

  7. Slide 7: Sellicks PPL 204 Development

    Sellicks PPL 204 Development ¾ Production from top 5 metre sand since Dec 2002 ¾ 139,125 bbls to 31 October 2003 ¾ Reserves P5O 1.1M bbls ¾ Bottom zone re-completion, free flow, jet pump November 2003 ¾ Pipeline/loading facility - to Tantanna

  8. Slide 8: 2003 drilling program

    Cooper Cooper Basin Basin 2003 drilling program Eucalyptus Eucalyptus 11 Semaphore Semaphore 11 Kiwi Kiwi 11 (gas (gas discovery) discovery) Christies Christies 11 (oil (oil discovery discovery Brighton Brighton 11 Worrior Worrior 11 (oil (oil discovery discovery

  9. Slide 9: Christies - PEL 92 Discovery

    Christies - PEL 92 Discovery ¾ Spudded 23 June 2003, 11 km SW of Sellicks ¾ Completed 14 July 2003 ¾ 250-500 bopd production ¾ Estimate 0.8M bbls mean recoverable ¾ Development to raise production to over 1000 bopd

  10. Slide 10: Christies completion – pre pump

    Christies completion – pre pump

  11. Slide 11: No bigger in Australia!

    NO Digger in Australia? Energy NL

  12. Slide 12: PEL 92 Christies area

    Cooper Cooper Basin Basin PEL 92 Christies area

  13. Slide 13: Vibroseis truck

    Vibroseis truck

  14. Slide 14: Energy NL

    Energy NL

  15. Slide 15: Vibrator in action

    Vibrator in action

  16. Slide 16: PEL 93: Karbine/Worrior

    PEL PEL 93: 93: Karbine/Worrior Karbine/Worrior –– 30% 30% interest interest Potential oil in place: Karbine - 5 million barrels (Dry) Worrior - 3 million barrels (Namur, Birkhead, Hutton Worrior Oil Well Oil) Pando 1 - drilled in 1966 – Karbine Dry Well drilling practices suspect

  17. Slide 17: Find the oil zones?

    Find Find the the oil oil zones? zones? Birkhead Fm Top Hutton Fm

  18. Slide 18: DST #2 and DST #3 results

    DST #2 1553-69m 400 b/d oil 1600 b/d water DST #3 1579-85m 2880 b/d oil

  19. Slide 19: Worrior 1 – DST #3

    Worrior 1 – DST #3

  20. Slide 20: Worrior-1 - Completion

    WORKIOR-7 - COMPLEMON Energy NL

  21. Slide 21: Worrior 1 (COE 30%)

    Worrior 1 (COE 30%) ¾ Discovered oil in 3 zones and gas (and probable oil) in a 4th zone ¾ Total of 35.5 metres of net pay ¾ Production commenced 27 November 2003 ¾ Net production, COE share, initially 360 BOPD ¾ Pipeline planned for installation during 2004

  22. Slide 22: 2004 Drilling Program

    1 ! 1 139° QUEENSLAND 140° 141 SOUTH AUSTRALIA £004 Drilling Program bs | Cooper Energy interests Production Licences PEL 100 (33.33%) - 27° —— Gas pipeline —— Oil pipeline Christies / Sellicks oil discoveries Worrior 2003 oil discovery GeoTech Graphics 580-2967 Liquids to Port Bonyt

  23. Slide 23: Summary

    SUMMARY ¾ Pure Cooper Basin focus, ‘Brownfields’ oil and gas explorer - established infrastructure and market access - 1 gas & 3 oil discoveries from 8 wells drilled ¾ Excellent spread of drilling and acreage - 6 blocks, net 1 million acres (participating in 3m acres) - 25% to 40% contingent interes

  24. Slide 24: Conclusion

    CONCLUSION ¾ COE listed in March 2002 ¾ First discovery in July 2002 ¾ 1st production by December 2002 ¾ 2nd discovery in July 2003 & 3rd discovery in Sept 2003 ¾ Emerging net cash flow of $4M-$5M ¾ Net COE production to rise to 700 BOPD by Xmas 03 ¾ Reserves estimated 1.4 M barrels

Cooper Energy — Shareholder Meeting (November 2003) on 6ix