Elia Group SA/NV · EURONEXT:ELI
Elia Group SA/NV — Technical Presentation (April 2013)
26 slides from Elia Group SA/NV's technical presentation, Apr 29, 2013
Slide 1: Experts Working Group Meeting n°2
Experts Working Group Meeting n°2 A.S. provided by distributed resources – 2014 & 2015 29/04/2013 Elia ENMAN Experts WG - meeting n° 2
Slide 2: Agenda
Agenda 1. Feedback TF Balancing and potential inclusion in product amendments 2. Final Product proposal with amendment 3. Statistics of R3 usage 4. Principle of prequalification 5. Principle of data exchange & contractual framework 6. ARP Contract changes 7. Agenda & proposal date for the next Exper
Slide 3: Agenda
Agenda 1. Feedback TF Balancing and potential inclusion in product amendments 2. Final Product proposal with amendment 3. Statistics of R3 usage 4. Principle of prequalification 5. Principle of data exchange & contractual framework 6. ARP Contract changes 7. Agenda & proposal date for the next Exper
Slide 4: TF Feedback with product amendments
TF Feedback with product amendments Stakeholder request Product amendment Will the activations always concerned all Only upward activation in “all or nothing the contracted energy or will it be possible modus” (complete contracted volume is to activate a part of the contracted energy? activated) Min
Slide 5: Agenda
Agenda 1. Feedback TF Balancing and potential inclusion in product amendments 2. Final Product proposal with amendment 3. Statistics of R3 usage 4. Principle of prequalification 5. Principle of data exchange & contractual framework 6. ARP Contract changes 7. Agenda & proposal date for the next Exper
Slide 6: R3 Dynamic Profile: product description 1. No correction of BRPs perimeter
“R3 Dynamic Profile”: product description 1. No correction of BRPs perimeter Example with activation of 40 MW to GU & no Example without activation correction BRP 2 BRP 2 Initial Position: +100 injection – 100 load = New Position: +100 injection- 60 load - 0 0MW correction = +40 MW GU (Load) supplie
Slide 7: R3 Dynamic Profile: product description 2. Capacity Only product
“R3 Dynamic Profile”: product description 2. Capacity Only product BRP 1 BRP 1 Zone is short: -100 MW Position: Initial Position: Elia Activation Request -100MW -100MW @ GU: -100 MW (load convention) Imbalance settlement: -100 MW @MIP NO correction BRP 2 Initial Position: BRP 2 Zone is BRP 2 0MW New
Slide 8: R3 Dynamic Profile: product description 3. Needs 4. Volume and selection
“R3 Dynamic Profile”: product description 3. Needs • To open R3 to Distributed Energy Resources (load and prod with AMR Meter) through BSP participation; • Resources at TSO level could also be eligible to be part of the BSP pool for this product; • To have nearly the same “quality” as R3 prod and at
Slide 9: R3 Dynamic Profile: 6. Availability control
“R3 Dynamic Profile”: product description 6. Availability control Requirement of 100% availability; Based on real metering (15’ metering) and not on nominations; Controlled per quarter-hour; No control during the activation Penalty per quarter-hour based on Capacity Remuneration with penal
Slide 10: R3 Dynamic Profile: 7. Activation control
“R3 Dynamic Profile”: product description 7. Activation control Reminder: No remuneration to BSP for the activation due to the model 1 activation = number of quarters between start and stop of Elia-bid characteristics Based on real 15’ metering and not on 10” T.M. Reference curve: based on the
Slide 11: R3 Dynamic Profile: 7. Activation control
“R3 Dynamic Profile”: product description 7. Activation control Limitation of 15 min metering data points Last Qh for activation Elia Request for P(k) = Really serves as reference Qh activation activated energy (Ref) Ref start stop R3 Qh 0 Qh 1 Qh 2 Qh 3 Energy that should be activated (incl. bill
Slide 12: Proposal Timing Tendering R3 DP
Proposal Timing Tendering R3 DP Tendering R3 DP first Results 2/9/2013 Preliminary timing – To be Communication DSO discussed prequalification decision Contract notice R3 DP 20/9/2013 7/6/2013 Communication selection BSP Design Freeze R3 DP tendering 17/4/2013 starts 11/10/2013 1/7/2013 R3 DP ready
Slide 13: Agenda
Agenda 1. Feedback TF Balancing and potential inclusion in product amendments 2. Final Product proposal with amendment 3. Statistics of R3 usage 4. Principle of prequalification 5. Principle of data exchange & contractual framework 6. ARP Contract changes 7. Agenda & proposal date for the next Exper
Slide 14: R3 statistics (1/2)
R3 statistics (1/2) Year Number of Average Total Activated Average volume per activations duration per Volume [MWh] activation [MWh] activation [h] 2011 83 3 31640 108 2012 34 3 12915 125 2013-Q1 3 2 1074 208 Experts WG - meeting n° 2
Slide 15: R3 statistics (2/2)
R3 statistics (2/2) Experts WG - meeting n° 2
Slide 16: Agenda
Agenda 1. Feedback TF Balancing and potential inclusion in product amendments 2. Final Product proposal with amendment 3. Statistics of R3 usage 4. Principle of prequalification 5. Principle of data exchange & contractual framework 6. ARP Contract changes 7. Agenda & proposal date for the next Exper
Slide 17: Prequalification processes
Prequalification processes Proposal - To be discussed 1. Prequalification Process due to congestion/voltage constraints DSOs could face with congestion/voltage issues if a DER is activated by a BSP on their grid • In order to mitigate this risk, DSO’s have to be involved in the prequalification of t
Slide 18: Agenda
Agenda 1. Feedback TF Balancing and potential inclusion in product amendments 2. Final Product proposal with amendment 3. Statistics of R3 usage 4. Principle of prequalification 5. Principle of data exchange & contractual framework 6. ARP Contract changes 7. Agenda & proposal date for the next Exper
Slide 19: Data exchanges (1/2)
Data exchanges (1/2) Proposal - To be discussed 1. Communication when Activation • Elia activates an amount of energy thanks to the contracted reserved power through a “R3 Dynamic Profile” product. Communication when activation will have to be supported by different agreements between Actors: GU h
Slide 20: Data exchanges (2/2)
Data exchanges (2/2) Proposal - To be discussed 3. Settlement of the service (Availability and Activation) • Elia verifies the availability and the activation of its contracted reserved power • Elia has an up-to-date view of the BSP pool • Each DSO has an up-to-date view of each EAN located on its g
Slide 21: Contractual framework (1/2)
Contractual framework (1/2) Proposal - To be discussed Experts WG - meeting n° 2
Slide 22: Contractual framework (2/2)
Contractual framework (2/2) Proposal - To be discussed 1. Elia – BSP • Commercial contract in the sense that Elia can enhance competition thanks to flexible Suppliers • Of course, the contract is built in a regulated contract • The price is free • Elements of the contract: Conditions (volumes, lim
Slide 23: Agenda
Agenda 1. Feedback TF Balancing and potential inclusion in product amendments 2. Final Product proposal with amendment 3. Statistics of R3 usage 4. Principle of prequalification 5. Principle of data exchange & contractual framework 6. ARP Contract changes 7. Agenda & proposal date for the next Exper
Slide 24: ARP-contract changes – new product R3 DP
ARP-contract changes – new product “R3 DP” Where ? Foreseen in an adapted & completed Art. 11.1.2 « Fourniture de services auxiliaires » Rationale • To accommodate the “R3 Dynamic Profile” product modalities • Differentiating the various products described in ARP-contract Ancillary services offere
Slide 25: ARP-contract changes – Add definition of Dynamic Profile Provider
ARP-contract changes – new product “R3 DP” Add definition of « Dynamic Profile Provider » « Fournisseur de profils dynamiques »: toute personne physique ou morale fournissant au Réseau Elia des services d’ajustement de profil d’utilisateurs de réseau, sous forme agrégée ou non, afin d’aider à l’équi