Slide 1: California Investor Meetings
California Investor Meetings Arranged by Banc of America Securities, LLC August 16-17, 2006 p. 1
Slide 2: Safe Harbor Statement and Investor Relations Contacts
Forecast Horizon and Assumptions “Safe Harbor” Statement under the Private Securities Litigation Reform Act of 1995 This presentation contains forward-looking statements, which are subject to risks and uncertainties. These factors include electric load and customer growth; weather conditions, includ
Slide 3: Susan Tomasky, EVP & Chief Financial Officer
Forecast Horizon and Assumptions Susan Tomasky EVP & Chief Financial Officer p. 3
Slide 4: Where We Operate
ForecastWhere Horizon We and Assumptions Operate Ohio Indiana West Virginia Virginia Kentucky Michigan Tennessee Oklahoma Texas 250 MW transmission line connects AEP East & Louisiana AEP West territories Arkansas p. 4
Slide 5: Strength & Scale in Assets & Operations
Forecast Strength Horizon & Scale and Assumptions in Assets & Operations Utility Operations: The Platform for Growth Generation* 35,600 MW capacity Transmission 39,000 miles Distribution 205,500 miles Customers 5 million * Figures do not include mothballed or decommissioned units (1,015 MW of capaci
Slide 6: Domestic Generation Fleet
Forecast Horizon Domestic and Assumptions Generation Fleet Capacity by NERC Region Capacity by Fuel Mix Pumped Nuclear Storage/Wind/Hydro SPP 3% 6% 24% Natural Gas/ Oil 19% ERCOT 3% Coal/Lignite ECAR 72% 73% Does not sum to 100% due to rounding Operating Statistics Commercial Availability Factor Cap
Slide 7: 2005 Retail Revenue
Forecast2005 Horizon Retail and Assumptions Revenue Retail Revenue Composition by State 2% 1% Ohio 3% 4% Oklahoma 4% Texas 31% 9% Indiana Virginia West Virginia 9% Louisiana Kentucky 11% 14% Arkansas 12% Michigan Tennessee p. 7
Slide 8: Regulatory
Forecast Horizon and Assumptions Regulatory p. 8
Slide 9: Regulatory Activity Underway
Forecast Horizon Regulatory andUnderway Activity Assumptions TCC Securitization of Stranded Costs Indiana Depreciation Petition APCo General Rate Case Filing in Virginia APCo Filing for Recovery of E&R Costs in Virginia IGCC – Received Rate Authorization of Pre-Construction Costs FERC Re
Slide 10: Texas Regulatory Activity
Forecast Horizon Texas andActivity Regulatory Assumptions TCC Stranded Cost Recovery Case ¾ April 4, 2006 – Final order, following rehearing, which provides for net true-up of $1.475 billion ¾ March 3, 2006 – Requested approval of financing order to issue $1.8 billion in low-cost securitization bond
Slide 11: Indiana Depreciation Filing and Virginia Rate Activity
Forecast Horizon Regulatory andUnderway Activity Assumptions Indiana Depreciation Filing December 1, 2005 – I&M filed petition with the IURC for accounting authorization to revise the depreciation rates applicable to its electric utility plant in service ¾ Based on a 2004 depreciation study, I&M rec
Slide 12: IGCC Regulatory Activity
Forecast IGCCHorizon andActivity Regulatory Assumptions Ohio - Cost Recovery Filing Ohio Next Steps 2006: Phase 1 – PUCO AUTHORIZED ¾ Secure cost recovery plan ¾ Effective during 2006 – April 10, 2006 – PUCO authorized ¾ Seeks recovery of initial costs, including those implementation of Phase 1 Rate
Slide 13: FERC Regional Rate Design
Forecast Horizon Regulatory andUnderway Activity Assumptions FERC Regional Rate Design ¾At our urging, the FERC instituted an investigation of PJM’s zonal rate regime - Present regime may need to be replaced - Consider establishing regional rates that would compensate AEP, among others, for the regi
Slide 14: Regulatory Activity Completed
Forecast Horizon Regulatory andCompleted Activity Assumptions Ohio – Rate Stabilization Plan (2006 – 2008) ¾ Annual 3% and 7% generation rate increases at CSP & OP, respectively ¾ POLR rate rider for environmental additions ¾ Ability to request additional 4% annual increase in generation rate, for c
Slide 15: West Virginia Rate Case
Forecast Horizon Regulatory andCompleted Activity Assumptions APCo & WPCo West Virginia Rate Case Settlement approved July 2006 ¾ $44MM initial overall increase in rates effective July 28, 2006 comprised of: ¾$56MM increase in ENEC for fuel & purchased power expenses; ¾$23MM special construction sur
Slide 16: Fuel
Forecast Horizon and Assumptions Fuel p. 16
Slide 17: Coal Procurement
Forecast Coal Horizon and Assumptions Procurement Total AEP System AEP Eastern System PRB & Other Northern Northern 18% Appalachia Appalachia Central 24% 32% Appalachia 37% Central Powder River Appalachia Basin & Others 39% 50% Coal Supply (on average) AEP Western System Lignite ¾ Purchase approxima
Slide 18: Fuel Recovery
Forecast Horizon and Assumptions Fuel Recovery AEP System Off System Sales Counterparties 25% Customer 55% Shareholder 20% Fuel Cost Recovery (on average) ¾ Fuel recovery varies by jurisdiction ¾ 80% of fuel cost is recoverable across the AEP System ¾ Active Fuel Clause Jurisdictions: – AEP EAST: AP
Slide 19: Jurisdictional Fuel Clause Summary
Forecast Horizon Jurisdictional Fuel and Assumptions Clause Summary STATE FUEL CLAUSE ADJUSTMENT FREQUENCY Arkansas Yes Annually Indiana Yes Capped at increasing rates through June 30, 2007 Kentucky Yes Monthly Louisiana Yes Monthly Michigan Yes Annually Ohio No Although there is no recovery mechani
Slide 20: Coal Delivery
Forecast Horizon and Assumptions Coal Delivery Total AEP System AEP Eastern System DELIVERY MODE DIVERSITY 2005 Actual Belt 2005 Actual Truck 3% 12% Belt Rail Direct 8% 33% Truck Rail/ 9% Barge* Rail Direct 19% 43% Rail/ Barge* 15% Barge Direct 33% AEP Western System 2005 Actual Belt Barge Direct 23
Slide 21: AEP's Coal Transportation Assets
Forecast Horizon AEP’s Coal and Assumptions Transportation Assets Coal Transportation to AEP AEP’s substantial coal Plants* transportation assets include: 2005 Actual ¾7,065 railcars ¾2,318 barges 20% ¾53 towboats ¾1 active coal handling terminal 80% (20 million tons of annual capacity) AEP-owned As
Slide 22: Environmental
Forecast Horizon and Assumptions Environmental p. 22
Slide 23: AEP's Environmental Compliance Strategy
AEP’s Environmental Forecast Compliance Horizon and Strategy Assumptions NOx and SO2 emission reductions are part of AEP’s on-going strategy to comply with the Clean Air Act, Title IV regulations, the Clean Air Interstate Rule (CAIR) and the Clean Air Mercury Rule (CAMR). Much of this investment wil
Slide 24: Environmental Investment: $3.9 Billion Through 2010
Forecast Environmental Horizon and Investment: $3.9 Assumptions Billion Through 2010 Projected Environmental Environmental Capital Investment* Investment Allocation Kentucky Other 2004** $299 Power Co 5% 1% 2005** $703 Ohio Power & CSP 2006 $1,365 59% 2007 $895 2008 $532 2009 $113 Appalachian 2010 $
Slide 25: Low Cost Production Supports Investment
Low Cost Production Supports Investment & Forecast Horizon Investment andCost Sustains Low Assumptions Production ¾ Lowers exposure to high cost emission Typical Pulverized Coal Plant allowances Comparison of Variable Production Cost Pre- and Post- FGD/SCR (future view)* ¾ Creates opportunity to bur
Slide 26: Environmental Compliance Investment
Environmental Compliance Forecast Horizon Investment and Assumptions Compliance Allocation Current Programs $2.0 Billion: $100 MM $500 MM $0.5 Billion for NOx $1.5 Billion for SO2 Future Programs $3.3 billion $1.9 Billion: $1.8 Billion for SO2 $0.1 Billion for Other NOx Compliance SO2 Compliance Mer
Slide 27: Environmental Investment by Plant
Environmental Forecast Investment Horizon and Assumptions FGD – Reduces SO2 by 95% to 98% Co-Benefit SCR - Reduces NOx by 90% Hg Capture Plant Name MW Capacity Plant Name MW Capacity Gavin 1 & 2 2600 Gavin 1 & 2 2600 Conesville 5 & 6 750 Amos 1-3 2900 Completed Pirkey 580 Mountaineer 1300 Oklaunion
Slide 28: Cost of Control and Technology
Cost of Forecast Controland Horizon Technology Assumptions AEP’s compliance plan largely relies on SCR & FGD technology to meet the requirements of CAIR and CAMR. AEP also deployed other combustion related controls, such as low NOx burners and optimized boiler controls throughout the system. Convent
Slide 29: Investing in IGCC
Forecast Horizon and Assumptions Investing in IGCC p. 29
Slide 30: Integrated Gasification Combined Cycle
ForecastGasification Integrated Horizon and Assumptions Combined Cycle Integrated Gasification Combined Cycle (IGCC) IGCC is a clean coal technology that combines two technologies – coal gasification and combined cycle -- to offer the benefits of a low cost fuel with superior thermal and environment
Slide 31: Looking To The Future - IGCC
Forecast Horizon Looking and Assumptions To The Future - IGCC 7FA Combustion Cryogenic Turbine Oxygen Syngas Air HRSG Mercury Steam Removal Steam Stack Water Steam Turbine Electricity Sulfur Removal Coal Particulate Removal Quench Gasifier Pure Sulfur Slag/Fines Solids 162110 - GJS/CE-01/1-23-02 AEP
Slide 32: Generation Technology Comparative Stats
Generation Forecast Technology Horizon andComparative Stats Assumptions PC IGCC NGCC Nominal Capacity (MW) 600 600 600 Heat Rate (Btu/kWh) 8700 8600 7200 Total Plant Cost (EPC) ($/kW) 1700 1900 480 Production Cost ($/MWh) 17 16 57 Cost of Electricity, without CO2 Capture ($/MWh) 58 63 90 Estimated C
Slide 33: Capital Investment
Forecast Horizon and Assumptions Capital Investment p. 33
Slide 34: Revised 2006 Capital Investment Forecast
Forecast 2006 RevisedHorizon and Assumptions Capital Investment Forecast Capital Investment Forecast excluding AFUDC $3,663MM $3,611MM $3,538MM $4,000 MM $3,500 MM $3,000 MM $2,500 MM $2,000 MM New Build Generation & $1,500 MM Ongoing Infrastructure $1,000 MM Replacement investment can be $500 MM th
Slide 35: New Generation
Forecast Horizon and Assumptions New Generation IGCC SWEPCO PSO RFPs ¾ June 2006 – PUCO ¾ May 31, 2006- Announced ¾ 2H05 - Submitted RFPs approved tariff to plans to build $1.4 billion for up to 1100 MW of recover Phase 1 of new generation peaking and baseload pre-construction ¾ Expected generation
Slide 36: 2006 Revised Capital Investment Funding
Forecast 2006 Horizon Funding Capital Investment and Assumptions Revised Actual Projection 2004 2005 2006 2007 2008 Planned Capital Investment Committed Construction Expenditures $ (1,671) $ (2,499) $ (2,091) $ (1,261) $ (950) Discretionary Cap Ex Predicated on Rate Recovery &/or Avail. Cash n/a n/a
Slide 37: Capital Investment 2004-2006
CapitalHorizon Forecast Investment and2004 - 2006 Assumptions 2004 Actual Totaled $1.6 Billion 2005 Actual Totaled $2.5 Billion (see note below ) $100 MM $7 MM Transmission $79 MM $9 MM $230 MM Transmission $392 MM $373 MM Distribution $164 MM Distribution Environmental Environmental $65 MM $259 MM
Slide 38: Finance
Forecast Horizon and Assumptions Finance p. 38
Slide 39: 2006 Guidance: $2.65 to $2.80 Per Share
Forecast 2006 Horizon Guidance: and Assumptions $2.65 to $2.80 Per Share Note: For analysis purposes, certain financial statement amounts have been reclassified for this effect on the earnings presentation. p. 39
Slide 40: 2006 Cash Flow
Forecast 2006 Horizon and Assumptions Cash Flow 2005 2006 Actual Guidance Beginning Cash Balance $ 320 $ 401 Cash from Operations: Income from Continuing Operations 787 1,066 Depreciation and Amortization 1,318 1,311 * * Assumes point EPS Pension Funding in Excess of Expense (626) - Extraordinary It
Slide 41: Credit Ratings
Forecast Horizon and Assumptions Credit Ratings Current Ratings for AEP, Inc & Subsidiaries Moody’s S&P Fitch Senior Senior Business Senior Senior Senior Senior Company Unsecured Secured Outlook profile Unsecured Secured Outlook Unsecured Secured Outlook AEP, Inc. Baa2 - S 6 BBB - S BBB - S AEP, Inc
Slide 42: Projected Capital Expenditures by Company
Forecast Horizon Forecasted Capitaland Assumptions Expenditures Company 2006 2007 2008 AEP SYSTEM* $3,663,500 $3,611,400 $3,537,700 AEGCo $12,100 $30,000 $39,700 APCo $928,300 $691,500 $751,700 CSPCo $318,700 $473,700 $553,400 I&M $329,800 $278,700 $262,000 KPCo $53,400 $127,100 $144,000 OPCo $1,065
Slide 43: Long-Term Debt Maturity Profile
Forecast Horizon Long-Term and Assumptions Debt Maturity Profile(1) Year 2006(3) 2007 2008 (2) (2) AEP Service Corporation $ 2,000,000 (2) $ 2,000,000 (2) $ 34,000,000 AEP Inc. $ - $ 345,000,000 $ - AEP Generating Company $ - $ - $ - Appalachian Power $ - $ 342,500,000 $ 200,000,000 Columbus Souther
Slide 44: 2006 Key Operating Company Highlights
Forecast 2006 HorizonCompany Key Operating and Assumptions Highlights (in millions) Dependent on Actual Capital Investment Projected Capital Target Equity Company Expenditures Projected Issuances Ratio APCO $943 $500 - $600 * 42-45% CSP $343 $0 44-48% I&M $311 $400 - $500 38-42% (a) KPCo $100 $0 42-
Slide 45: Long-Term Debt Guidelines
Forecast Horizon Long-Term and Debt Assumptions Guidelines Issuers: ¾ Issue at operating companies. Size: ¾ Make transactions index eligible if possible. ¾ When possible, issue a size sufficient for competitive execution. Maturity: ¾ Issue maturities for which the market has appetite. ¾ Achieve weig
Slide 46: Debt Schedules
Forecast Horizon and Assumptions Debt Schedules American Electric Power Service Corp Series Interest Maturity Amount Notes Payable 9.600% 12/15/2008 $38,000,000 American Electric Power Inc Series Interest Maturity Amount Senior Notes 5.375% 03/15/2010 $490,000,000 Senior Notes 5.250% 06/01/2015 $242
Slide 47: Debt Schedules
Forecast Horizon and Assumptions Debt Schedules AEP Texas Central* AEP Texas North Series Interest Maturity Amount Series Interest Maturity Amount First Mortgage Bond* 7.125% 02/01/2008 $18,581,000 First Mortgage Bond 7.750% 06/01/2007 $8,151,000 Pollution Control Bond 4.550% 11/01/2029 $100,635,000
Slide 48: Debt Schedules
Forecast Horizon and Assumptions Debt Schedules Appalachian Power Company Columbus Southern Power Series Interest Maturity Amount Series Interest Maturity Amount Pollution Control Bond 2.800% 05/01/2019 $30,000,000 Pollution Control Bond Floating 08/01/2020 $48,550,000 Pollution Control Bond 2.700%
Slide 49: Debt Schedules
Forecast Horizon and Assumptions Debt Schedules Indiana Michigan Power Company Kentucky Power Series Interest Maturity Amount Series Interest Maturity Amount Pollution Control Bond 2.625% 10/01/2019 $25,000,000 Senior Notes 5.500% 07/01/2007 $125,000,000 Pollution Control Bond 2.625% 04/01/2025 $40,
Slide 50: Debt Schedules
Forecast Horizon and Assumptions Debt Schedules Ohio Power Company Public Service Company of Oklahoma Series Interest Maturity Amount Series Interest Maturity Amount Pollution Control Bond Floating 07/01/2014 $50,000,000 Pollution Control Bond Floating 06/01/2014 $33,700,000 Pollution Control Bond F
Slide 51: Debt Schedules
Forecast Horizon and Assumptions Debt Schedules Southwestern Electric Power Company Series Interest Maturity Amount Notes Payable 4.470% 04/23/2011 $23,288,281 Notes Payable 6.360% 02/22/2007 $7,000,000 Notes Payable 7.030% 02/22/2012 $23,000,000 First Mortgage Bond 6.200% 11/01/2006 $1,000,000 Firs
Slide 52: Appendix
Forecast Horizon and Assumptions Appendix p. 52
Slide 53: What AEP Offers
Forecast Horizon and What AEP Assumptions Offers Utility Operations: The Platform for Growth & Financial Strength 1 Strength and scale in assets and operations 2 Focused utility business model 3 Earnings growth driven by native load & capital investment 4 Pioneering advanced technologies in the sect
Slide 54: APCo West Virginia Rate Case
ForecastAPCo Completed Horizon Westand Assumptions Virginia Rate Case Appalachian Power & Wheeling Power – West Virginia Base Rate Case & ENEC Reactivation Filed April 24, 2006 – Joint Settlement Agreement ¾ Estimated overall impact of revenue increases to be phased-in through 2009: ¾ $129 Million ¾
Slide 55: Virginia Rate Case Information
Forecast SummaryHorizon andInformation Rate Case Assumptions Virginia E&R Factor Filing On July 1, 2005, Appalachian Power Co. filed a request with the Virginia SCC to recover incremental actual and projected costs for environmental compliance and T&D System reliability in the amount of $62.1MM. The
Slide 56: AEP Interstate Project
Forecast AEPHorizon and Interstate Assumptions Project ¾ Line connects AEP’s Amos 765 kV station to Allegheny Power’s Doubs 500 kV station in DEANS Maryland, and terminates at PSEG’s Deans 500 kV station in New Jersey ¾ Total line length is approximately 550 miles ¾ Will improve power transfer capab
Slide 57: Operating Company Detail
Forecast Horizon and Assumptions OPERATING COMPANY DETAIL p. 1
Slide 58: AEP Texas Central Company
Forecast AEP TexasHorizon Centraland Assumptions Company President and Chief Operating Officer: Charles Patton AEP Texas Central Company (TCC) (organized in Texas in 1945) is engaged in the generation (to an extremely limited extent), transmission and sale of power to affiliated and non-affiliated e
Slide 59: AEP Texas Central Company Capital Structure
AEP Texas Horizon Forecast Centraland Company Assumptions CAPITAL STRUCTURE (in thousands) 2003 2004 2005 CAPITAL STRUCTURE Debt Equity Total Debt Equity Total Debt Equity Total Capitalization Per Balance Sheet 2,291,625 1,214,989 3,506,614 1,907,505 1,274,583 3,182,088 1,935,576 953,570 2,889,146 %
Slide 60: AEP Texas Central Major Customers
AEP Texas Forecast Central Horizon andCompany Assumptions AEP TEXAS CENTRAL MAJOR CUSTOMERS • Top 10 customers = 67% of industrial sales* ($) Valero Energy Corporation Koch Industries, Inc. • Metropolitan areas account for 78% ultimate sales Air Liquide America, LP • 53 persons per square mile (U.S.
Slide 61: AEP Texas North Company
AEP TexasHorizon Forecast North and Company Assumptions President and Chief Operating Officer: Charles Patton AEP Texas North Company (TNC) (organized in Texas in 1927) is engaged in the generation, transmission and sale of power to affiliated and non-affiliated entities and the distribution of elec
Slide 62: AEP Texas North Company Capital Structure
AEP Texas Horizon Forecast North Company and Assumptions CAPITAL STRUCTURE (in thousands) 2003 2004 2005 CAPITAL STRUCTURE Debt Equity Total Debt Equity Total Debt Equity Total Capitalization Per Balance Sheet 356,754 240,632 597,386 314,357 312,777 627,134 276,845 316,275 593,120 % of Capitalizatio
Slide 63: AEP Texas North Major Customers
Forecast AEP TexasHorizon and Assumptions North Company AEP TEXAS NORTH MAJOR CUSTOMERS Chevron Texaco Corporation Kinder Morgan • Top 10 customers = 32% industrial sales* ($) Occidental Permian Ltd. • Metropolitan areas account for 59% ultimate sales Crown Cork & Seal Co., Inc Rhodia Inc. • 8 perso
Slide 64: Regulatory Information: Public Utility Commission of Texas
Regulatory Information Forecast Horizon and Assumptions Public Utility Commission of Texas (PUCT) AEP Regulated Electric Utilities Texas Central Company Texas North Company Southwestern Electric Power Company Commissioners Number: 3 Appointed/Elected: Appointed Term: 6 years Political Makeup: R:3 Qu
Slide 65: Appalachian Power
Forecast Horizon Appalachian Powerand Assumptions President and Chief Operating Officer: Dana Waldo Appalachian Power Company (APCo) (organized in Virginia in 1926) is engaged in the generation, transmission and distribution of electric power to approximately 942,000 retail customers in the southwes
Slide 66: Appalachian Power Capital Structure
Forecast Horizon Appalachian Powerand Assumptions CAPITAL STRUCTURE (in thousands) 2003 2004 2005 CAPITAL STRUCTURE Debt Equity Total Debt Equity Total Debt Equity Total Capitalization Per Balance Sheet 1,947,075 1,360,131 3,307,206 1,995,658 1,427,502 3,423,160 2,345,511 1,821,484 4,166,995 % of Ca
Slide 67: Appalachian Power Generation Statistics
Forecast Horizon Appalachian Powerand Assumptions APCo Generation Production Statistics – 2003 - 2005 Production Stat 2003 2004 2005 Three Year Average MWh Produced 32,901,943 29,551,752 32,949,364 31,801,020 Coal Consumption (tons burned) 13,015,569 11,604,352 13,187,986 12,602,636 Operating Inform
Slide 68: Appalachian Power Bill Comparison and Major Customers
Appalachian Power Forecast Horizon and Assumptions APPALACHIAN AREA UTILITIES TYPICAL BILL COMPARISON* West Virginia Customers West Virginia Virginia APCo 433,615 APCo 55.28 APCo 57.80 Allegheny 485,295 AEP – Wheeling 57.91 ODPCo 58.07 Allegheny 70.09 Dominion Virginia 87.18 Virginia Customers Conec
Slide 69: Regulatory Information: West Virginia
Regulatory Information Forecast Horizon and Assumptions Public Service Commission of West Virginia AEP Regulated Electric Utilities Wheeling Power Co. Appalachian Power Co. Commissioners Number: 3 Appointed/Elected: Appointed Term: 6 years Political Makeup R: 1 D: 2 Qualifications for Commissioners
Slide 70: Regulatory Information: Virginia
Forecast Horizon Regulatory and Assumptions Information Virginia State Corporation Commission AEP Regulated Electric Utilities Appalachian Power Co. Commissioners Number: 3 Appointed/Elected: Elected Term: 6 years Political Makeup: R: 2 D: 1 Qualifications for Commissioners The Virginia State Corpor
Slide 71: Columbus Southern Power
Forecast Horizon Columbus andPower Southern Assumptions President and Chief Operating Officer: Kevin Walker Columbus Southern Power Company (CSPCo) (organized in Ohio in 1937, the earliest direct predecessor company having been organized in 1883) is engaged in the generation, transmission and distri
Slide 72: Columbus Southern Power Capital Structure
Forecast Horizon Columbus andPower Southern Assumptions CAPITAL STRUCTURE (in thousands) 2003 2004 2005 CAPITAL STRUCTURE Debt Equity Total Debt Equity Total Debt Equity Total Capitalization Per Balance Sheet 904,081 897,881 1,801,962 987,626 898,650 1,886,276 1,214,529 981,546 2,196,075 % of Capita
Slide 73: Columbus Southern Generation Statistics
Forecast Horizon Columbus andPower Southern Assumptions Columbus Southern Generation Production Statistics – 2003 - 2005 Production Stat 2003 2004 2005 Three Year Average MWh Produced 15,243,711 14,049,095 14,038,045 14,443,617 Coal Consumption (tons burned) 6,526,167 6,121,275 6,048,060 6,231,834 O
Slide 74: Ohio Bill Comparison and Major Customers
Forecast Horizon Columbus andPower Southern Assumptions OHIO UTILITIES TYPICAL BILL COMPARISON* Ohio Customers Ohio AEP Ohio* 1,408,846 AEP (OPCo) 63.41 AEP (CSP) 75.35 First Energy** 1,099,919 Cinergy (CG&E) 79.64 Cinergy (CG&E) 647,329 DP&L 91.12 DP&L 506,608 FE (CEI) 113.19 FE (Toledo Ed) 115.70
Slide 75: Regulatory Information: Ohio
Regulatory Information Forecast Horizon and Assumptions Ohio Public Utilities Commission AEP Regulated Electric Utilities Columbus Southern Power Co. Ohio Power Co. Commissioners Number: 5 Appointed/Elected: Appointed Term: 5 years Political Makeup: R: 3 D: 0 I: 2 Qualifications for Commissioners Fi
Slide 76: Indiana Michigan Power
Forecast Indiana Horizon Power Michigan and Assumptions President and Chief Operating Officer: Marsha Ryan Indiana Michigan Power Company (I&M) (organized in Indiana in 1925) is engaged in the generation, transmission and distribution of electric power to approximately 580,000 retail customers in no
Slide 77: Indiana Michigan Power Capital Structure
Forecast Indiana Horizon and Michigan Assumptions Power CAPITAL STRUCTURE (in thousands) 2003 2004 2005 CAPITAL STRUCTURE Debt Equity Total Debt Equity Total Debt Equity Total Capitalization Per Balance Sheet 1,438,181 1,149,593 2,587,774 1,374,288 1,099,582 2,473,870 1,538,642 1,228,176 2,766,818 %
Slide 78: I&M Generation Production Statistics
Forecast Indiana Horizon and Michigan Assumptions Power I&M Generation Production Statistics – 2003 – 2005 Production Stat 2003 2004 2005 Three-Year Avg. MWh Produced 28,075,125 21,258,001 31,535,226 26,956,117 Coal Consumption (tons burned) 7,189,655 7,186,066 7,011,370 7,129,030 Operating Informat
Slide 79: Indiana Michigan Bill Comparison and Major Customers
Indiana Michigan Forecast Power Horizon and Assumptions INDIANA & MICHIGAN UTILITIES TYPICAL BILL COMPARISON* Indiana Customers Indiana Michigan I&M 454,760 I&M 69.63 I&M 62.08 IP & L 460,000 IP & L 73.10 Consumers Energy 84.19 NIPSCO 450,000 Duke Energy Indiana 81.80 Detroit Edison 104.48 Duke Ener
Slide 80: Regulatory Information: Indiana
Regulatory Information Forecast Horizon and Assumptions Indiana Utility Regulatory Commission AEP Regulated Electric Utilities Indiana Michigan Power Co. Commissioners Number: 5 Appointed/Elected: Appointed Term: 4 years Political Makeup: R:3 D: 2 Qualifications for Commissioners Five members, appoi
Slide 81: Regulatory Information: Michigan
Forecast Horizon Regulatory and Assumptions Information Michigan Public Service Commission AEP Regulated Electric Utilities Indiana Michigan Power Co. Commissioners Number: 3 Appointed/Elected: Appointed Term: 6 years Political Makeup: R :1 D: 2 Qualifications for Commissioners The Michigan Public S
Slide 82: Kentucky Power
Kentucky ForecastPower Horizon and Assumptions President and Chief Operating Officer: Tim Mosher Kentucky Power Company (KPCo) (organized in Kentucky in 1919) is engaged in the generation, As of 12/31/2005 transmission and distribution of electric power to approximately Total Customers: 176,000 reta
Slide 83: Kentucky Power Capital Structure
Kentucky Power and Assumptions Forecast Horizon CAPITAL STRUCTURE (in thousands) 2003 2004 2005 CAPITAL STRUCTURE Debt Equity Total Debt Equity Total Debt Equity Total Capitalization Per Balance Sheet 525,698 317,138 842,836 508,310 320,980 829,290 493,030 347,841 840,871 % of Capitalization Per Bal
Slide 84: Kentucky Power Generation Statistics
Kentucky Power and Assumptions Forecast Horizon Kentucky Power Generation Production Statistics – 2003 - 2005 Production Stat 2003 2004 2005 Three-Year Average MWh Produced 6,170,931 6,550,509 7,345,624 6,689,021 Coal Consumption (tons burned) 2,513,524 2,607,559 2,926,253 2,682,445 Operating Inform
Slide 85: Kentucky Power Bill Comparison and Major Customers
Kentucky Power and Assumptions Forecast Horizon KENTUCKY POWER UTILITIES TYPICAL BILL COMPARISON* Kentucky Customers Kentucky KPCo 174,631 KPCo 59.78 Kentucky Utilities 485,627 Kentucky Utilities 62.40 LG & E 389,196 LG&E 66.31 CIN 68.54 KENTUCKY POWER MAJOR CUSTOMERS * Typical bills are displayed i
Slide 86: Regulatory Information: Kentucky
Regulatory Information Forecast Horizon and Assumptions Kentucky Public Service Commission AEP Regulated Electric Utilities Kentucky Power Co. Commissioners Number: 3 Appointed/Elected: Appointed Term: 4 years Political Makeup: R: 3 Qualifications for Commissioners Three members, appointed by the go
Slide 87: Ohio Power
Forecast Ohio PowerHorizon and Assumptions President and Chief Operating Officer: Kevin Walker Ohio Power Company (OPCo) (organized in Ohio in 1907 and re-incorporated in 1924) is engaged in the generation, transmission and distribution of electric power to approximately 710,000 retail customers in
Slide 88: Ohio Power Capital Structure
Forecast Ohio PowerHorizon and Assumptions CAPITAL STRUCTURE (in thousands) 2003 2004 2005 CAPITAL STRUCTURE Debt Equity Total Debt Equity Total Debt Equity Total Capitalization Per Balance Sheet 2,082,195 1,487,920 3,570,115 2,053,641 1,490,479 3,544,120 2,280,107 1,784,586 4,064,693 % of Capitaliz
Slide 89: Ohio Power Generation Production Statistics
Forecast Ohio PowerHorizon and Assumptions Ohio Power Generation Production Statistics – 2002 - 2004 Production Stat 2003 2004 2005 Three Year Average MWh Produced 53,099,905 52,156,749 52,080,585 52,445,746 Coal Consumption (tons burned) 20,936,936 20,534,361 20,382,116 20,617,804 Operating Informa
Slide 90: Ohio Utilities Bill Comparison and Major Customers
Forecast Ohio PowerHorizon and Assumptions OHIO UTILITIES Ohio Customers TYPICAL BILL COMPARISON* AEP Ohio* 1,408,846 Ohio AEP (OPCo) 63.41 First Energy** 1,099,919 AEP (CSP) 75.35 Cinergy (CG&E) 647,329 Cinergy (CG&E) 79.64 DP&L 506,608 DP&L 91.12 Monongahela Power*** 29,196 FE (CEI) 113.19 FE (Tol
Slide 91: Public Service Company of Oklahoma
Public Service Forecast Company Horizon and of Oklahoma Assumptions President and Chief Operating Officer: Stuart Solomon Public Service Company of Oklahoma (PSO) (organized in Oklahoma in 1913) is engaged in the generation, transmission and distribution of electric power to approximately 514,000 re
Slide 92: PSO Capital Structure
Public Service Forecast Company Horizon and of Oklahoma Assumptions CAPITAL STRUCTURE (thousands) 2003 2004 2005 CAPITAL STRUCTURE Debt Equity Total Debt Equity Total Debt Equity Total Capitalization Per Balance Sheet 607,162 488,275 1,095,437 601,095 534,517 1,135,612 646,954 553,858 1,200,812 % of
Slide 93: PSO Generation Production Statistics
Public Service Forecast Company Horizon and of Oklahoma Assumptions Public Service Company of Oklahoma Generation Production Statistics – 2003 - 2005 Production Stat 2003 2004 2005 Three-Year Average MWh Produced 14,845,846 12,512,486 15,375,848 14,244,727 Coal Consumption (tons burned) 4,678,950 4,
Slide 94: PSO Bill Comparison and Major Customers
Public Service Forecast Company Horizon and of Oklahoma Assumptions PUBLIC SERVICE COMPANY OF OKLAHOMA UTILITIES TYPICAL BILL COMPARISON* Oklahoma Customers Oklahoma PSO 507,214 OG&E 73.33 OG&E 668,766 PSO 74.20 SPSCo 82.52 PUBLIC SERVICE COMPANY OF OKLAHOMA Empire District 85.25 MAJOR CUSTOMERS * T
Slide 95: Regulatory Information: Oklahoma
Regulatory Information Forecast Horizon and Assumptions Oklahoma Corporation Commission AEP Regulated Electric Utilities Public Service Company of Oklahoma Commissioners Number: 3 Appointed / Elected: Elected Term: 6 years Political Makeup: R: 3 Qualifications for Commissioners The Oklahoma Corporat
Slide 96: Southwestern Electric Power
Forecast Horizon Southwestern and Assumptions Electric Power President and Chief Operating Officer: Nick Akins Southwestern Electric Power Company (SWEPCo) (organized in Delaware in 1912) is engaged in the generation, transmission and distribution of electric power to approximately 450,000 retail cu
Slide 97: SWEPCo Capital Structure
Forecast Horizon Southwestern and Assumptions Electric Power CAPITAL STRUCTURE (in thousands) 2003 2004 2005 CAPITAL STRUCTURE Debt Equity Total Debt Equity Total Debt Equity Total Capitalization Per Balance Sheet 890,675 701,360 1,592,035 806,494 773,318 1,579,812 774,245 787,077 1,561,322 % of Cap
Slide 98: SWEPCo Generation Production Statistics
Southwestern Electric Forecast Horizon Power and Assumptions Southwestern Electric Power Generation Production Statistics – 2003 - 2005 Production Stat 2003 2004 2005 Three-Year Average MWh Produced 20,539,365 20,071,578 20,167,754 20,259,566 Coal Consumption (tons burned) 12,536,179 13,032,475 12,4
Slide 99: SWEPCo Bill Comparison and Major Customers
Forecast Horizon Southwestern and Assumptions Electric Power SOUTHWESTERN ELECTRIC TYPICAL BILL COMPARISON* POWER UTILITIES Arkansas Louisiana Texas Arkansas Customers SWEPCO 66.15 SWEPCO 68.83 SWEPCO 63.95 SWEPCO 107,220 OG&E 72.11 CLECO 90.13 SPSCo 83.19 Entergy AR 667,714 Empire District 74.71 En
Slide 100: Regulatory Information: Arkansas
Regulatory Information Forecast Horizon and Assumptions Arkansas Public Service Commission AEP Regulated Electric Utilities Southwestern Electric Power Co. Commissioners Number: 3 Appointed/Elected: Appointed Term: 6 years Political Makeup: R: 3 Qualifications for Commissioners The Arkansas Public S
Slide 101: Regulatory Information: Louisiana
Regulatory Information Forecast Horizon and Assumptions Louisiana Public Service Commission AEP Regulated Electric Utilities Southwestern Electric Power Co. Commissioners Number: 5 Appointed/Elected: Elected Term: 6 years Political Makeup: R: 2 D: 3 Qualifications for Commissioners The Louisiana Pub
American Electric Power Company — Non-Deal Roadshow (August 2006) on 6ix