American Electric Power Company, Inc. · NASDAQ:AEP

American Electric Power — Non-Deal Roadshow (August 2006)

101 slides from American Electric Power's roadshow presentation, Aug 16, 2006

  1. Slide 1: California Investor Meetings

    California Investor Meetings Arranged by Banc of America Securities, LLC August 16-17, 2006 p. 1

  2. Slide 2: Safe Harbor Statement and Investor Relations Contacts

    Forecast Horizon and Assumptions “Safe Harbor” Statement under the Private Securities Litigation Reform Act of 1995 This presentation contains forward-looking statements, which are subject to risks and uncertainties. These factors include electric load and customer growth; weather conditions, includ

  3. Slide 3: Susan Tomasky, EVP & Chief Financial Officer

    Forecast Horizon and Assumptions Susan Tomasky EVP & Chief Financial Officer p. 3

  4. Slide 4: Where We Operate

    ForecastWhere Horizon We and Assumptions Operate Ohio Indiana West Virginia Virginia Kentucky Michigan Tennessee Oklahoma Texas 250 MW transmission line connects AEP East & Louisiana AEP West territories Arkansas p. 4

  5. Slide 5: Strength & Scale in Assets & Operations

    Forecast Strength Horizon & Scale and Assumptions in Assets & Operations Utility Operations: The Platform for Growth Generation* 35,600 MW capacity Transmission 39,000 miles Distribution 205,500 miles Customers 5 million * Figures do not include mothballed or decommissioned units (1,015 MW of capaci

  6. Slide 6: Domestic Generation Fleet

    Forecast Horizon Domestic and Assumptions Generation Fleet Capacity by NERC Region Capacity by Fuel Mix Pumped Nuclear Storage/Wind/Hydro SPP 3% 6% 24% Natural Gas/ Oil 19% ERCOT 3% Coal/Lignite ECAR 72% 73% Does not sum to 100% due to rounding Operating Statistics Commercial Availability Factor Cap

  7. Slide 7: 2005 Retail Revenue

    Forecast2005 Horizon Retail and Assumptions Revenue Retail Revenue Composition by State 2% 1% Ohio 3% 4% Oklahoma 4% Texas 31% 9% Indiana Virginia West Virginia 9% Louisiana Kentucky 11% 14% Arkansas 12% Michigan Tennessee p. 7

  8. Slide 8: Regulatory

    Forecast Horizon and Assumptions Regulatory p. 8

  9. Slide 9: Regulatory Activity Underway

    Forecast Horizon Regulatory andUnderway Activity Assumptions ‹ TCC Securitization of Stranded Costs ‹ Indiana Depreciation Petition ‹ APCo General Rate Case Filing in Virginia ‹ APCo Filing for Recovery of E&R Costs in Virginia ‹ IGCC – Received Rate Authorization of Pre-Construction Costs ‹ FERC Re

  10. Slide 10: Texas Regulatory Activity

    Forecast Horizon Texas andActivity Regulatory Assumptions TCC Stranded Cost Recovery Case ¾ April 4, 2006 – Final order, following rehearing, which provides for net true-up of $1.475 billion ¾ March 3, 2006 – Requested approval of financing order to issue $1.8 billion in low-cost securitization bond

  11. Slide 11: Indiana Depreciation Filing and Virginia Rate Activity

    Forecast Horizon Regulatory andUnderway Activity Assumptions Indiana Depreciation Filing December 1, 2005 – I&M filed petition with the IURC for accounting authorization to revise the depreciation rates applicable to its electric utility plant in service ¾ Based on a 2004 depreciation study, I&M rec

  12. Slide 12: IGCC Regulatory Activity

    Forecast IGCCHorizon andActivity Regulatory Assumptions Ohio - Cost Recovery Filing Ohio Next Steps 2006: Phase 1 – PUCO AUTHORIZED ¾ Secure cost recovery plan ¾ Effective during 2006 – April 10, 2006 – PUCO authorized ¾ Seeks recovery of initial costs, including those implementation of Phase 1 Rate

  13. Slide 13: FERC Regional Rate Design

    Forecast Horizon Regulatory andUnderway Activity Assumptions FERC Regional Rate Design ¾At our urging, the FERC instituted an investigation of PJM’s zonal rate regime - Present regime may need to be replaced - Consider establishing regional rates that would compensate AEP, among others, for the regi

  14. Slide 14: Regulatory Activity Completed

    Forecast Horizon Regulatory andCompleted Activity Assumptions Ohio – Rate Stabilization Plan (2006 – 2008) ¾ Annual 3% and 7% generation rate increases at CSP & OP, respectively ¾ POLR rate rider for environmental additions ¾ Ability to request additional 4% annual increase in generation rate, for c

  15. Slide 15: West Virginia Rate Case

    Forecast Horizon Regulatory andCompleted Activity Assumptions APCo & WPCo West Virginia Rate Case Settlement approved July 2006 ¾ $44MM initial overall increase in rates effective July 28, 2006 comprised of: ¾$56MM increase in ENEC for fuel & purchased power expenses; ¾$23MM special construction sur

  16. Slide 16: Fuel

    Forecast Horizon and Assumptions Fuel p. 16

  17. Slide 17: Coal Procurement

    Forecast Coal Horizon and Assumptions Procurement Total AEP System AEP Eastern System PRB & Other Northern Northern 18% Appalachia Appalachia Central 24% 32% Appalachia 37% Central Powder River Appalachia Basin & Others 39% 50% Coal Supply (on average) AEP Western System Lignite ¾ Purchase approxima

  18. Slide 18: Fuel Recovery

    Forecast Horizon and Assumptions Fuel Recovery AEP System Off System Sales Counterparties 25% Customer 55% Shareholder 20% Fuel Cost Recovery (on average) ¾ Fuel recovery varies by jurisdiction ¾ 80% of fuel cost is recoverable across the AEP System ¾ Active Fuel Clause Jurisdictions: – AEP EAST: AP

  19. Slide 19: Jurisdictional Fuel Clause Summary

    Forecast Horizon Jurisdictional Fuel and Assumptions Clause Summary STATE FUEL CLAUSE ADJUSTMENT FREQUENCY Arkansas Yes Annually Indiana Yes Capped at increasing rates through June 30, 2007 Kentucky Yes Monthly Louisiana Yes Monthly Michigan Yes Annually Ohio No Although there is no recovery mechani

  20. Slide 20: Coal Delivery

    Forecast Horizon and Assumptions Coal Delivery Total AEP System AEP Eastern System DELIVERY MODE DIVERSITY 2005 Actual Belt 2005 Actual Truck 3% 12% Belt Rail Direct 8% 33% Truck Rail/ 9% Barge* Rail Direct 19% 43% Rail/ Barge* 15% Barge Direct 33% AEP Western System 2005 Actual Belt Barge Direct 23

  21. Slide 21: AEP's Coal Transportation Assets

    Forecast Horizon AEP’s Coal and Assumptions Transportation Assets Coal Transportation to AEP AEP’s substantial coal Plants* transportation assets include: 2005 Actual ¾7,065 railcars ¾2,318 barges 20% ¾53 towboats ¾1 active coal handling terminal 80% (20 million tons of annual capacity) AEP-owned As

  22. Slide 22: Environmental

    Forecast Horizon and Assumptions Environmental p. 22

  23. Slide 23: AEP's Environmental Compliance Strategy

    AEP’s Environmental Forecast Compliance Horizon and Strategy Assumptions NOx and SO2 emission reductions are part of AEP’s on-going strategy to comply with the Clean Air Act, Title IV regulations, the Clean Air Interstate Rule (CAIR) and the Clean Air Mercury Rule (CAMR). Much of this investment wil

  24. Slide 24: Environmental Investment: $3.9 Billion Through 2010

    Forecast Environmental Horizon and Investment: $3.9 Assumptions Billion Through 2010 Projected Environmental Environmental Capital Investment* Investment Allocation Kentucky Other 2004** $299 Power Co 5% 1% 2005** $703 Ohio Power & CSP 2006 $1,365 59% 2007 $895 2008 $532 2009 $113 Appalachian 2010 $

  25. Slide 25: Low Cost Production Supports Investment

    Low Cost Production Supports Investment & Forecast Horizon Investment andCost Sustains Low Assumptions Production ¾ Lowers exposure to high cost emission Typical Pulverized Coal Plant allowances Comparison of Variable Production Cost Pre- and Post- FGD/SCR (future view)* ¾ Creates opportunity to bur

  26. Slide 26: Environmental Compliance Investment

    Environmental Compliance Forecast Horizon Investment and Assumptions Compliance Allocation Current Programs $2.0 Billion: $100 MM $500 MM $0.5 Billion for NOx $1.5 Billion for SO2 Future Programs $3.3 billion $1.9 Billion: $1.8 Billion for SO2 $0.1 Billion for Other NOx Compliance SO2 Compliance Mer

  27. Slide 27: Environmental Investment by Plant

    Environmental Forecast Investment Horizon and Assumptions FGD – Reduces SO2 by 95% to 98% Co-Benefit SCR - Reduces NOx by 90% Hg Capture Plant Name MW Capacity Plant Name MW Capacity Gavin 1 & 2 2600 Gavin 1 & 2 2600 Conesville 5 & 6 750 Amos 1-3 2900 Completed Pirkey 580 Mountaineer 1300 Oklaunion

  28. Slide 28: Cost of Control and Technology

    Cost of Forecast Controland Horizon Technology Assumptions AEP’s compliance plan largely relies on SCR & FGD technology to meet the requirements of CAIR and CAMR. AEP also deployed other combustion related controls, such as low NOx burners and optimized boiler controls throughout the system. Convent

  29. Slide 29: Investing in IGCC

    Forecast Horizon and Assumptions Investing in IGCC p. 29

  30. Slide 30: Integrated Gasification Combined Cycle

    ForecastGasification Integrated Horizon and Assumptions Combined Cycle Integrated Gasification Combined Cycle (IGCC) IGCC is a clean coal technology that combines two technologies – coal gasification and combined cycle -- to offer the benefits of a low cost fuel with superior thermal and environment

  31. Slide 31: Looking To The Future - IGCC

    Forecast Horizon Looking and Assumptions To The Future - IGCC 7FA Combustion Cryogenic Turbine Oxygen Syngas Air HRSG Mercury Steam Removal Steam Stack Water Steam Turbine Electricity Sulfur Removal Coal Particulate Removal Quench Gasifier Pure Sulfur Slag/Fines Solids 162110 - GJS/CE-01/1-23-02 AEP

  32. Slide 32: Generation Technology Comparative Stats

    Generation Forecast Technology Horizon andComparative Stats Assumptions PC IGCC NGCC Nominal Capacity (MW) 600 600 600 Heat Rate (Btu/kWh) 8700 8600 7200 Total Plant Cost (EPC) ($/kW) 1700 1900 480 Production Cost ($/MWh) 17 16 57 Cost of Electricity, without CO2 Capture ($/MWh) 58 63 90 Estimated C

  33. Slide 33: Capital Investment

    Forecast Horizon and Assumptions Capital Investment p. 33

  34. Slide 34: Revised 2006 Capital Investment Forecast

    Forecast 2006 RevisedHorizon and Assumptions Capital Investment Forecast Capital Investment Forecast excluding AFUDC $3,663MM $3,611MM $3,538MM $4,000 MM $3,500 MM $3,000 MM $2,500 MM $2,000 MM New Build Generation & $1,500 MM Ongoing Infrastructure $1,000 MM Replacement investment can be $500 MM th

  35. Slide 35: New Generation

    Forecast Horizon and Assumptions New Generation IGCC SWEPCO PSO RFPs ¾ June 2006 – PUCO ¾ May 31, 2006- Announced ¾ 2H05 - Submitted RFPs approved tariff to plans to build $1.4 billion for up to 1100 MW of recover Phase 1 of new generation peaking and baseload pre-construction ¾ Expected generation

  36. Slide 36: 2006 Revised Capital Investment Funding

    Forecast 2006 Horizon Funding Capital Investment and Assumptions Revised Actual Projection 2004 2005 2006 2007 2008 Planned Capital Investment Committed Construction Expenditures $ (1,671) $ (2,499) $ (2,091) $ (1,261) $ (950) Discretionary Cap Ex Predicated on Rate Recovery &/or Avail. Cash n/a n/a

  37. Slide 37: Capital Investment 2004-2006

    CapitalHorizon Forecast Investment and2004 - 2006 Assumptions 2004 Actual Totaled $1.6 Billion 2005 Actual Totaled $2.5 Billion (see note below ) $100 MM $7 MM Transmission $79 MM $9 MM $230 MM Transmission $392 MM $373 MM Distribution $164 MM Distribution Environmental Environmental $65 MM $259 MM

  38. Slide 38: Finance

    Forecast Horizon and Assumptions Finance p. 38

  39. Slide 39: 2006 Guidance: $2.65 to $2.80 Per Share

    Forecast 2006 Horizon Guidance: and Assumptions $2.65 to $2.80 Per Share Note: For analysis purposes, certain financial statement amounts have been reclassified for this effect on the earnings presentation. p. 39

  40. Slide 40: 2006 Cash Flow

    Forecast 2006 Horizon and Assumptions Cash Flow 2005 2006 Actual Guidance Beginning Cash Balance $ 320 $ 401 Cash from Operations: Income from Continuing Operations 787 1,066 Depreciation and Amortization 1,318 1,311 * * Assumes point EPS Pension Funding in Excess of Expense (626) - Extraordinary It

  41. Slide 41: Credit Ratings

    Forecast Horizon and Assumptions Credit Ratings Current Ratings for AEP, Inc & Subsidiaries Moody’s S&P Fitch Senior Senior Business Senior Senior Senior Senior Company Unsecured Secured Outlook profile Unsecured Secured Outlook Unsecured Secured Outlook AEP, Inc. Baa2 - S 6 BBB - S BBB - S AEP, Inc

  42. Slide 42: Projected Capital Expenditures by Company

    Forecast Horizon Forecasted Capitaland Assumptions Expenditures Company 2006 2007 2008 AEP SYSTEM* $3,663,500 $3,611,400 $3,537,700 AEGCo $12,100 $30,000 $39,700 APCo $928,300 $691,500 $751,700 CSPCo $318,700 $473,700 $553,400 I&M $329,800 $278,700 $262,000 KPCo $53,400 $127,100 $144,000 OPCo $1,065

  43. Slide 43: Long-Term Debt Maturity Profile

    Forecast Horizon Long-Term and Assumptions Debt Maturity Profile(1) Year 2006(3) 2007 2008 (2) (2) AEP Service Corporation $ 2,000,000 (2) $ 2,000,000 (2) $ 34,000,000 AEP Inc. $ - $ 345,000,000 $ - AEP Generating Company $ - $ - $ - Appalachian Power $ - $ 342,500,000 $ 200,000,000 Columbus Souther

  44. Slide 44: 2006 Key Operating Company Highlights

    Forecast 2006 HorizonCompany Key Operating and Assumptions Highlights (in millions) Dependent on Actual Capital Investment Projected Capital Target Equity Company Expenditures Projected Issuances Ratio APCO $943 $500 - $600 * 42-45% CSP $343 $0 44-48% I&M $311 $400 - $500 38-42% (a) KPCo $100 $0 42-

  45. Slide 45: Long-Term Debt Guidelines

    Forecast Horizon Long-Term and Debt Assumptions Guidelines Issuers: ¾ Issue at operating companies. Size: ¾ Make transactions index eligible if possible. ¾ When possible, issue a size sufficient for competitive execution. Maturity: ¾ Issue maturities for which the market has appetite. ¾ Achieve weig

  46. Slide 46: Debt Schedules

    Forecast Horizon and Assumptions Debt Schedules American Electric Power Service Corp Series Interest Maturity Amount Notes Payable 9.600% 12/15/2008 $38,000,000 American Electric Power Inc Series Interest Maturity Amount Senior Notes 5.375% 03/15/2010 $490,000,000 Senior Notes 5.250% 06/01/2015 $242

  47. Slide 47: Debt Schedules

    Forecast Horizon and Assumptions Debt Schedules AEP Texas Central* AEP Texas North Series Interest Maturity Amount Series Interest Maturity Amount First Mortgage Bond* 7.125% 02/01/2008 $18,581,000 First Mortgage Bond 7.750% 06/01/2007 $8,151,000 Pollution Control Bond 4.550% 11/01/2029 $100,635,000

  48. Slide 48: Debt Schedules

    Forecast Horizon and Assumptions Debt Schedules Appalachian Power Company Columbus Southern Power Series Interest Maturity Amount Series Interest Maturity Amount Pollution Control Bond 2.800% 05/01/2019 $30,000,000 Pollution Control Bond Floating 08/01/2020 $48,550,000 Pollution Control Bond 2.700%

  49. Slide 49: Debt Schedules

    Forecast Horizon and Assumptions Debt Schedules Indiana Michigan Power Company Kentucky Power Series Interest Maturity Amount Series Interest Maturity Amount Pollution Control Bond 2.625% 10/01/2019 $25,000,000 Senior Notes 5.500% 07/01/2007 $125,000,000 Pollution Control Bond 2.625% 04/01/2025 $40,

  50. Slide 50: Debt Schedules

    Forecast Horizon and Assumptions Debt Schedules Ohio Power Company Public Service Company of Oklahoma Series Interest Maturity Amount Series Interest Maturity Amount Pollution Control Bond Floating 07/01/2014 $50,000,000 Pollution Control Bond Floating 06/01/2014 $33,700,000 Pollution Control Bond F

  51. Slide 51: Debt Schedules

    Forecast Horizon and Assumptions Debt Schedules Southwestern Electric Power Company Series Interest Maturity Amount Notes Payable 4.470% 04/23/2011 $23,288,281 Notes Payable 6.360% 02/22/2007 $7,000,000 Notes Payable 7.030% 02/22/2012 $23,000,000 First Mortgage Bond 6.200% 11/01/2006 $1,000,000 Firs

  52. Slide 52: Appendix

    Forecast Horizon and Assumptions Appendix p. 52

  53. Slide 53: What AEP Offers

    Forecast Horizon and What AEP Assumptions Offers Utility Operations: The Platform for Growth & Financial Strength 1 Strength and scale in assets and operations 2 Focused utility business model 3 Earnings growth driven by native load & capital investment 4 Pioneering advanced technologies in the sect

  54. Slide 54: APCo West Virginia Rate Case

    ForecastAPCo Completed Horizon Westand Assumptions Virginia Rate Case Appalachian Power & Wheeling Power – West Virginia Base Rate Case & ENEC Reactivation Filed April 24, 2006 – Joint Settlement Agreement ¾ Estimated overall impact of revenue increases to be phased-in through 2009: ¾ $129 Million ¾

  55. Slide 55: Virginia Rate Case Information

    Forecast SummaryHorizon andInformation Rate Case Assumptions Virginia E&R Factor Filing On July 1, 2005, Appalachian Power Co. filed a request with the Virginia SCC to recover incremental actual and projected costs for environmental compliance and T&D System reliability in the amount of $62.1MM. The

  56. Slide 56: AEP Interstate Project

    Forecast AEPHorizon and Interstate Assumptions Project ¾ Line connects AEP’s Amos 765 kV station to Allegheny Power’s Doubs 500 kV station in DEANS Maryland, and terminates at PSEG’s Deans 500 kV station in New Jersey ¾ Total line length is approximately 550 miles ¾ Will improve power transfer capab

  57. Slide 57: Operating Company Detail

    Forecast Horizon and Assumptions OPERATING COMPANY DETAIL p. 1

  58. Slide 58: AEP Texas Central Company

    Forecast AEP TexasHorizon Centraland Assumptions Company President and Chief Operating Officer: Charles Patton AEP Texas Central Company (TCC) (organized in Texas in 1945) is engaged in the generation (to an extremely limited extent), transmission and sale of power to affiliated and non-affiliated e

  59. Slide 59: AEP Texas Central Company Capital Structure

    AEP Texas Horizon Forecast Centraland Company Assumptions CAPITAL STRUCTURE (in thousands) 2003 2004 2005 CAPITAL STRUCTURE Debt Equity Total Debt Equity Total Debt Equity Total Capitalization Per Balance Sheet 2,291,625 1,214,989 3,506,614 1,907,505 1,274,583 3,182,088 1,935,576 953,570 2,889,146 %

  60. Slide 60: AEP Texas Central Major Customers

    AEP Texas Forecast Central Horizon andCompany Assumptions AEP TEXAS CENTRAL MAJOR CUSTOMERS • Top 10 customers = 67% of industrial sales* ($) Valero Energy Corporation Koch Industries, Inc. • Metropolitan areas account for 78% ultimate sales Air Liquide America, LP • 53 persons per square mile (U.S.

  61. Slide 61: AEP Texas North Company

    AEP TexasHorizon Forecast North and Company Assumptions President and Chief Operating Officer: Charles Patton AEP Texas North Company (TNC) (organized in Texas in 1927) is engaged in the generation, transmission and sale of power to affiliated and non-affiliated entities and the distribution of elec

  62. Slide 62: AEP Texas North Company Capital Structure

    AEP Texas Horizon Forecast North Company and Assumptions CAPITAL STRUCTURE (in thousands) 2003 2004 2005 CAPITAL STRUCTURE Debt Equity Total Debt Equity Total Debt Equity Total Capitalization Per Balance Sheet 356,754 240,632 597,386 314,357 312,777 627,134 276,845 316,275 593,120 % of Capitalizatio

  63. Slide 63: AEP Texas North Major Customers

    Forecast AEP TexasHorizon and Assumptions North Company AEP TEXAS NORTH MAJOR CUSTOMERS Chevron Texaco Corporation Kinder Morgan • Top 10 customers = 32% industrial sales* ($) Occidental Permian Ltd. • Metropolitan areas account for 59% ultimate sales Crown Cork & Seal Co., Inc Rhodia Inc. • 8 perso

  64. Slide 64: Regulatory Information: Public Utility Commission of Texas

    Regulatory Information Forecast Horizon and Assumptions Public Utility Commission of Texas (PUCT) AEP Regulated Electric Utilities Texas Central Company Texas North Company Southwestern Electric Power Company Commissioners Number: 3 Appointed/Elected: Appointed Term: 6 years Political Makeup: R:3 Qu

  65. Slide 65: Appalachian Power

    Forecast Horizon Appalachian Powerand Assumptions President and Chief Operating Officer: Dana Waldo Appalachian Power Company (APCo) (organized in Virginia in 1926) is engaged in the generation, transmission and distribution of electric power to approximately 942,000 retail customers in the southwes

  66. Slide 66: Appalachian Power Capital Structure

    Forecast Horizon Appalachian Powerand Assumptions CAPITAL STRUCTURE (in thousands) 2003 2004 2005 CAPITAL STRUCTURE Debt Equity Total Debt Equity Total Debt Equity Total Capitalization Per Balance Sheet 1,947,075 1,360,131 3,307,206 1,995,658 1,427,502 3,423,160 2,345,511 1,821,484 4,166,995 % of Ca

  67. Slide 67: Appalachian Power Generation Statistics

    Forecast Horizon Appalachian Powerand Assumptions APCo Generation Production Statistics – 2003 - 2005 Production Stat 2003 2004 2005 Three Year Average MWh Produced 32,901,943 29,551,752 32,949,364 31,801,020 Coal Consumption (tons burned) 13,015,569 11,604,352 13,187,986 12,602,636 Operating Inform

  68. Slide 68: Appalachian Power Bill Comparison and Major Customers

    Appalachian Power Forecast Horizon and Assumptions APPALACHIAN AREA UTILITIES TYPICAL BILL COMPARISON* West Virginia Customers West Virginia Virginia APCo 433,615 APCo 55.28 APCo 57.80 Allegheny 485,295 AEP – Wheeling 57.91 ODPCo 58.07 Allegheny 70.09 Dominion Virginia 87.18 Virginia Customers Conec

  69. Slide 69: Regulatory Information: West Virginia

    Regulatory Information Forecast Horizon and Assumptions Public Service Commission of West Virginia AEP Regulated Electric Utilities Wheeling Power Co. Appalachian Power Co. Commissioners Number: 3 Appointed/Elected: Appointed Term: 6 years Political Makeup R: 1 D: 2 Qualifications for Commissioners

  70. Slide 70: Regulatory Information: Virginia

    Forecast Horizon Regulatory and Assumptions Information Virginia State Corporation Commission AEP Regulated Electric Utilities Appalachian Power Co. Commissioners Number: 3 Appointed/Elected: Elected Term: 6 years Political Makeup: R: 2 D: 1 Qualifications for Commissioners The Virginia State Corpor

  71. Slide 71: Columbus Southern Power

    Forecast Horizon Columbus andPower Southern Assumptions President and Chief Operating Officer: Kevin Walker Columbus Southern Power Company (CSPCo) (organized in Ohio in 1937, the earliest direct predecessor company having been organized in 1883) is engaged in the generation, transmission and distri

  72. Slide 72: Columbus Southern Power Capital Structure

    Forecast Horizon Columbus andPower Southern Assumptions CAPITAL STRUCTURE (in thousands) 2003 2004 2005 CAPITAL STRUCTURE Debt Equity Total Debt Equity Total Debt Equity Total Capitalization Per Balance Sheet 904,081 897,881 1,801,962 987,626 898,650 1,886,276 1,214,529 981,546 2,196,075 % of Capita

  73. Slide 73: Columbus Southern Generation Statistics

    Forecast Horizon Columbus andPower Southern Assumptions Columbus Southern Generation Production Statistics – 2003 - 2005 Production Stat 2003 2004 2005 Three Year Average MWh Produced 15,243,711 14,049,095 14,038,045 14,443,617 Coal Consumption (tons burned) 6,526,167 6,121,275 6,048,060 6,231,834 O

  74. Slide 74: Ohio Bill Comparison and Major Customers

    Forecast Horizon Columbus andPower Southern Assumptions OHIO UTILITIES TYPICAL BILL COMPARISON* Ohio Customers Ohio AEP Ohio* 1,408,846 AEP (OPCo) 63.41 AEP (CSP) 75.35 First Energy** 1,099,919 Cinergy (CG&E) 79.64 Cinergy (CG&E) 647,329 DP&L 91.12 DP&L 506,608 FE (CEI) 113.19 FE (Toledo Ed) 115.70

  75. Slide 75: Regulatory Information: Ohio

    Regulatory Information Forecast Horizon and Assumptions Ohio Public Utilities Commission AEP Regulated Electric Utilities Columbus Southern Power Co. Ohio Power Co. Commissioners Number: 5 Appointed/Elected: Appointed Term: 5 years Political Makeup: R: 3 D: 0 I: 2 Qualifications for Commissioners Fi

  76. Slide 76: Indiana Michigan Power

    Forecast Indiana Horizon Power Michigan and Assumptions President and Chief Operating Officer: Marsha Ryan Indiana Michigan Power Company (I&M) (organized in Indiana in 1925) is engaged in the generation, transmission and distribution of electric power to approximately 580,000 retail customers in no

  77. Slide 77: Indiana Michigan Power Capital Structure

    Forecast Indiana Horizon and Michigan Assumptions Power CAPITAL STRUCTURE (in thousands) 2003 2004 2005 CAPITAL STRUCTURE Debt Equity Total Debt Equity Total Debt Equity Total Capitalization Per Balance Sheet 1,438,181 1,149,593 2,587,774 1,374,288 1,099,582 2,473,870 1,538,642 1,228,176 2,766,818 %

  78. Slide 78: I&M Generation Production Statistics

    Forecast Indiana Horizon and Michigan Assumptions Power I&M Generation Production Statistics – 2003 – 2005 Production Stat 2003 2004 2005 Three-Year Avg. MWh Produced 28,075,125 21,258,001 31,535,226 26,956,117 Coal Consumption (tons burned) 7,189,655 7,186,066 7,011,370 7,129,030 Operating Informat

  79. Slide 79: Indiana Michigan Bill Comparison and Major Customers

    Indiana Michigan Forecast Power Horizon and Assumptions INDIANA & MICHIGAN UTILITIES TYPICAL BILL COMPARISON* Indiana Customers Indiana Michigan I&M 454,760 I&M 69.63 I&M 62.08 IP & L 460,000 IP & L 73.10 Consumers Energy 84.19 NIPSCO 450,000 Duke Energy Indiana 81.80 Detroit Edison 104.48 Duke Ener

  80. Slide 80: Regulatory Information: Indiana

    Regulatory Information Forecast Horizon and Assumptions Indiana Utility Regulatory Commission AEP Regulated Electric Utilities Indiana Michigan Power Co. Commissioners Number: 5 Appointed/Elected: Appointed Term: 4 years Political Makeup: R:3 D: 2 Qualifications for Commissioners Five members, appoi

  81. Slide 81: Regulatory Information: Michigan

    Forecast Horizon Regulatory and Assumptions Information Michigan Public Service Commission AEP Regulated Electric Utilities Indiana Michigan Power Co. Commissioners Number: 3 Appointed/Elected: Appointed Term: 6 years Political Makeup: R :1 D: 2 Qualifications for Commissioners The Michigan Public S

  82. Slide 82: Kentucky Power

    Kentucky ForecastPower Horizon and Assumptions President and Chief Operating Officer: Tim Mosher Kentucky Power Company (KPCo) (organized in Kentucky in 1919) is engaged in the generation, As of 12/31/2005 transmission and distribution of electric power to approximately Total Customers: 176,000 reta

  83. Slide 83: Kentucky Power Capital Structure

    Kentucky Power and Assumptions Forecast Horizon CAPITAL STRUCTURE (in thousands) 2003 2004 2005 CAPITAL STRUCTURE Debt Equity Total Debt Equity Total Debt Equity Total Capitalization Per Balance Sheet 525,698 317,138 842,836 508,310 320,980 829,290 493,030 347,841 840,871 % of Capitalization Per Bal

  84. Slide 84: Kentucky Power Generation Statistics

    Kentucky Power and Assumptions Forecast Horizon Kentucky Power Generation Production Statistics – 2003 - 2005 Production Stat 2003 2004 2005 Three-Year Average MWh Produced 6,170,931 6,550,509 7,345,624 6,689,021 Coal Consumption (tons burned) 2,513,524 2,607,559 2,926,253 2,682,445 Operating Inform

  85. Slide 85: Kentucky Power Bill Comparison and Major Customers

    Kentucky Power and Assumptions Forecast Horizon KENTUCKY POWER UTILITIES TYPICAL BILL COMPARISON* Kentucky Customers Kentucky KPCo 174,631 KPCo 59.78 Kentucky Utilities 485,627 Kentucky Utilities 62.40 LG & E 389,196 LG&E 66.31 CIN 68.54 KENTUCKY POWER MAJOR CUSTOMERS * Typical bills are displayed i

  86. Slide 86: Regulatory Information: Kentucky

    Regulatory Information Forecast Horizon and Assumptions Kentucky Public Service Commission AEP Regulated Electric Utilities Kentucky Power Co. Commissioners Number: 3 Appointed/Elected: Appointed Term: 4 years Political Makeup: R: 3 Qualifications for Commissioners Three members, appointed by the go

  87. Slide 87: Ohio Power

    Forecast Ohio PowerHorizon and Assumptions President and Chief Operating Officer: Kevin Walker Ohio Power Company (OPCo) (organized in Ohio in 1907 and re-incorporated in 1924) is engaged in the generation, transmission and distribution of electric power to approximately 710,000 retail customers in

  88. Slide 88: Ohio Power Capital Structure

    Forecast Ohio PowerHorizon and Assumptions CAPITAL STRUCTURE (in thousands) 2003 2004 2005 CAPITAL STRUCTURE Debt Equity Total Debt Equity Total Debt Equity Total Capitalization Per Balance Sheet 2,082,195 1,487,920 3,570,115 2,053,641 1,490,479 3,544,120 2,280,107 1,784,586 4,064,693 % of Capitaliz

  89. Slide 89: Ohio Power Generation Production Statistics

    Forecast Ohio PowerHorizon and Assumptions Ohio Power Generation Production Statistics – 2002 - 2004 Production Stat 2003 2004 2005 Three Year Average MWh Produced 53,099,905 52,156,749 52,080,585 52,445,746 Coal Consumption (tons burned) 20,936,936 20,534,361 20,382,116 20,617,804 Operating Informa

  90. Slide 90: Ohio Utilities Bill Comparison and Major Customers

    Forecast Ohio PowerHorizon and Assumptions OHIO UTILITIES Ohio Customers TYPICAL BILL COMPARISON* AEP Ohio* 1,408,846 Ohio AEP (OPCo) 63.41 First Energy** 1,099,919 AEP (CSP) 75.35 Cinergy (CG&E) 647,329 Cinergy (CG&E) 79.64 DP&L 506,608 DP&L 91.12 Monongahela Power*** 29,196 FE (CEI) 113.19 FE (Tol

  91. Slide 91: Public Service Company of Oklahoma

    Public Service Forecast Company Horizon and of Oklahoma Assumptions President and Chief Operating Officer: Stuart Solomon Public Service Company of Oklahoma (PSO) (organized in Oklahoma in 1913) is engaged in the generation, transmission and distribution of electric power to approximately 514,000 re

  92. Slide 92: PSO Capital Structure

    Public Service Forecast Company Horizon and of Oklahoma Assumptions CAPITAL STRUCTURE (thousands) 2003 2004 2005 CAPITAL STRUCTURE Debt Equity Total Debt Equity Total Debt Equity Total Capitalization Per Balance Sheet 607,162 488,275 1,095,437 601,095 534,517 1,135,612 646,954 553,858 1,200,812 % of

  93. Slide 93: PSO Generation Production Statistics

    Public Service Forecast Company Horizon and of Oklahoma Assumptions Public Service Company of Oklahoma Generation Production Statistics – 2003 - 2005 Production Stat 2003 2004 2005 Three-Year Average MWh Produced 14,845,846 12,512,486 15,375,848 14,244,727 Coal Consumption (tons burned) 4,678,950 4,

  94. Slide 94: PSO Bill Comparison and Major Customers

    Public Service Forecast Company Horizon and of Oklahoma Assumptions PUBLIC SERVICE COMPANY OF OKLAHOMA UTILITIES TYPICAL BILL COMPARISON* Oklahoma Customers Oklahoma PSO 507,214 OG&E 73.33 OG&E 668,766 PSO 74.20 SPSCo 82.52 PUBLIC SERVICE COMPANY OF OKLAHOMA Empire District 85.25 MAJOR CUSTOMERS * T

  95. Slide 95: Regulatory Information: Oklahoma

    Regulatory Information Forecast Horizon and Assumptions Oklahoma Corporation Commission AEP Regulated Electric Utilities Public Service Company of Oklahoma Commissioners Number: 3 Appointed / Elected: Elected Term: 6 years Political Makeup: R: 3 Qualifications for Commissioners The Oklahoma Corporat

  96. Slide 96: Southwestern Electric Power

    Forecast Horizon Southwestern and Assumptions Electric Power President and Chief Operating Officer: Nick Akins Southwestern Electric Power Company (SWEPCo) (organized in Delaware in 1912) is engaged in the generation, transmission and distribution of electric power to approximately 450,000 retail cu

  97. Slide 97: SWEPCo Capital Structure

    Forecast Horizon Southwestern and Assumptions Electric Power CAPITAL STRUCTURE (in thousands) 2003 2004 2005 CAPITAL STRUCTURE Debt Equity Total Debt Equity Total Debt Equity Total Capitalization Per Balance Sheet 890,675 701,360 1,592,035 806,494 773,318 1,579,812 774,245 787,077 1,561,322 % of Cap

  98. Slide 98: SWEPCo Generation Production Statistics

    Southwestern Electric Forecast Horizon Power and Assumptions Southwestern Electric Power Generation Production Statistics – 2003 - 2005 Production Stat 2003 2004 2005 Three-Year Average MWh Produced 20,539,365 20,071,578 20,167,754 20,259,566 Coal Consumption (tons burned) 12,536,179 13,032,475 12,4

  99. Slide 99: SWEPCo Bill Comparison and Major Customers

    Forecast Horizon Southwestern and Assumptions Electric Power SOUTHWESTERN ELECTRIC TYPICAL BILL COMPARISON* POWER UTILITIES Arkansas Louisiana Texas Arkansas Customers SWEPCO 66.15 SWEPCO 68.83 SWEPCO 63.95 SWEPCO 107,220 OG&E 72.11 CLECO 90.13 SPSCo 83.19 Entergy AR 667,714 Empire District 74.71 En

  100. Slide 100: Regulatory Information: Arkansas

    Regulatory Information Forecast Horizon and Assumptions Arkansas Public Service Commission AEP Regulated Electric Utilities Southwestern Electric Power Co. Commissioners Number: 3 Appointed/Elected: Appointed Term: 6 years Political Makeup: R: 3 Qualifications for Commissioners The Arkansas Public S

  101. Slide 101: Regulatory Information: Louisiana

    Regulatory Information Forecast Horizon and Assumptions Louisiana Public Service Commission AEP Regulated Electric Utilities Southwestern Electric Power Co. Commissioners Number: 5 Appointed/Elected: Elected Term: 6 years Political Makeup: R: 2 D: 3 Qualifications for Commissioners The Louisiana Pub

American Electric Power Company — Non-Deal Roadshow (August 2006) on 6ix