Enertopia — Investor Presentation (September 2022)

20 slides from Enertopia's investor presentation, September 2022

  1. Slide 1: September 2022 West Tonopah (WT) Lithium Presentation

    September 2022 West Tonopah (WT) Lithium Presentation 1

  2. Slide 2: Disclaimer

    Disclaimer This presentation includes forward-looking statements within the meaning of Section 27A of the Securities Act of 1933, as amended, and Section 21E of the Securities Exchange Act of 1934, as amended. Statements which are not historical facts are forward-looking statements. The Company make

  3. Slide 3: Project Location Nevada State Map

    Project Location Nevada State Map Enertopia currently controls 100% of 88 royalty free lode claims covering approximately 1,760 acres in Big Smoky Valley four miles west of Tonopah, Nevada. The project area is adjacent to paved highways and grid power access as well as nearby local sources of water.

  4. Slide 4: West Tonopah Project June 2022 Completed Drill Locations

    West Tonopah Project June 2022 Completed Drill Locations West Tonopah Project location Shallow drilling up to 200 feet from surface has confirmed an extensive area of lithium bearing claystone underlies the project area. All holes ended in lithium claystone mineralization with values ranging from 330

  5. Slide 5: Cross Section of western fence of drill holes

    Cross Section of western fence of drill holes Light green shading shows higher grade lithium claystone horizon open to depth and to the south. DH-22-19 drilled over 3.500 feet south east of drill hole DH22-10 intersected lower grade block of lithium claystone. Future drilling will determine the ulti

  6. Slide 6: Table of June 2022 Drill Assay Results

    Table of June 2022 Drill Assay Results HOLE # From ft To ft PPM Li Avg PPM Li high Assay Claystone Horizon type Comments DH22-01 13 120 738 1,120 Li claystone open to depth DH22-04 30 190 408 630 Li claystone open to depth DH22-05 32.5 120 799 1,140 Li claystone open to depth DH22-06 47.5 120 843 1,

  7. Slide 7: Drill core photo

    Drill core photo Photo shows the green higher grade Li Claystone intersected In holes DH22-01 05,06,07. Core photo is from hole DH22-07 the last 10 foot interval from 110’-120’ which ran 783 ppm Li. Note how soft the claystone is with the indentations made by puddy knife handle. 7

  8. Slide 8: Drill core photo

    Drill core photo Photo shows the black Li Claystone intersected In holes DH22-16,19 and 20 near and at the bottom of the respective drill holes 8

  9. Slide 9: Enertopia West Tonopah Lithium Project

    Enertopia West Tonopah Lithium Project Photo looking southwest from DH-07 location which intersected 107 feet of 738 PPM Li. The bottom 20 feet of DH- 07 assayed 905 ppm and is open at depth. 9

  10. Slide 10: Enertopia West Tonopah Lithium Project: Next Steps

    Enertopia West Tonopah Lithium Project NEXT STEPS “Drill Baby Drill” The Company is working on drill permitting a second phase drill program. Details of the drill program will be released after final approval by the BLM. The next drill program will target the southern portion of the claim block to ex

  11. Slide 11: What the Analysts thought the LCE market would do from 2014-2024

    What the Analysts thought the LCE market would do from 2014-2024 shown by chart on right Analysts were expecting a 4x increase in demand over 10yrs. But instead lithium demand has increased over 10x in only 8yrs. Now estimates are for 1.2 million tonnes by 2024 or an increase of 24x from 2014! 11

  12. Slide 12: Lithium Demand For Our Clean Energy World

    Lithium Demand For Our Clean Energy World Year over year battery grade lithium demand gets stronger and stronger . Source Albemarle Investor Day Dec 12, 2019 12

  13. Slide 13: AND STRONGER!

    AND STRONGER! Source Albemarle Investor Day May, 2022 13

  14. Slide 14: EV Wars for Battery Grade Lithium Supply!

    EV Wars for Battery Grade Lithium Supply! You can count on it if the EV market growth continues at the current pace as new potential mine supply simply cannot keep pace with growing demand. From 2023-2028 an estimated $45 billion will be needed to be invested in lithium mining projects in order to r

  15. Slide 15: Management

    MANAGEMENT President, CEO and Director: Robert McAllister Mr. McAllister has served as President of Enertopia since November 2007 and as a Director since April 2008. Mr. McAllister was responsible for Investor Relations and Corporate Communications for publicly traded mining and oil & gas listed com

  16. Slide 16: Board of Directors

    Board of Directors Director: Kevin Brown Mr. Brown brings over 18 years of diversified financial and business management experience in private companies, covering the high-tech, mining, and the health and wellness industries. Director: Robert McAllister Mr. McAllister has served as President of Ener

  17. Slide 17: Advisory Consultants

    ADVISORY CONSULTANTS Dr. John Thomas - Technical Advisor Dr. Thomas is a professional engineer, and holds a B.Sc., an M.Sc., and a Ph.D. in chemical engineering from the University of Manchester in the United Kingdom. He also received a diploma in accounting and finance from the U.K. Association of

  18. Slide 18: Share structure

    Share structure OTCQB: ENRT Company owns 3 million shares of Cypress Development Corp 18

  19. Slide 19: President's Message

    President’s Message “We are very happy with our accomplishments as we moved the Company forward on both the WT Lithium Project and Green Technology development side. We look forward to bigger steps in 2023 and beyond ” Stated President Robert McAllister The Qualified Person: The technical data in thi

  20. Slide 20: Contact Information

    CONTACT INFORMATION President & CEO Robert McAllister Phone: 250-870-2219 Email: [email protected] Head Office Address: 1873 Spall Road # 18 Kelowna, BC V1Y 4R2 20