Aker Solutions Asa · OSL:AKSO

Aker Solutions Asa — Investor Day (November 2007)

9 slides from Aker Solutions Asa's investor day presentation, Nov 30, 2007

  1. Slide 1: Leveraging know-how, products and technologies in key markets globally

    Leveraging know-how, products and technologies in key markets globally Pål Helsing, EVP Field Development Capital Markets Day 30 November 2007 part of the Aker group Field Development in brief ■ Field Development focuses on EPC total deliveries in a few selected business segments ■ The aim is to hav

  2. Slide 2: Where we are located

    Where we are located Fabrication • Verdal • Stord Engineering/Technology • Egersund Oslo Representation office Moscow Fabrication Astrakhan Engineering/Technology Houston Front-end engineering Kuala Lumpur Front-end engineering Engineering/Technology Perth Fabrication part of the Aker group Slide 3

  3. Slide 3: Major project achievements (cont.)

    Major project achievements (cont.) Aker H-6e Gjøa Blind Faith ■ Building the world’s ■ Delivering the Gjøa ■ Delivering Chevron’s biggest drilling rigs gas production semi Blind Faith platform ■ The hull and topsides in the North Sea hull in Gulf of Mexico for the first rig, Aker ■ Major procurement

  4. Slide 4: Responding to the international growth opportunity

    Responding to the international growth opportunity Leverage the intersection between key competences, products/technology and growing markets to build new international growth platforms Target Markets Key in-house technologies Key competences and know-how and products • Project execution • Semi desi

  5. Slide 5: Global market outlook

    Global market outlook excluding onshore Field development capex offshore 2008-2011 (USD million) 18 000 15 000 12 000 Eng & Mmt 9 000 Floating platforms 6 000 Fixed 3 000 platforms 0 India Other Kazakhstan Nigeria Angola Australia Malaysia Mexico China Russia Brazil US GoM UKCS Norway Primary market

  6. Slide 6: Maintaining the leading position in the North Sea

    Maintaining the leading position in the North Sea Redeveloping the North Sea New frontiers in the North Building on the No 1 position New field developments Large redevelopment projects Expansion of phased projects Modification for CO2 capture New Arctic rigs considered FPSO SEMO¹ SEMI Typical onsho

  7. Slide 7: Northwest Russia and Sakhalin

    Northwest Russia and Sakhalin Shtokman Yamal area Sakhalin 1 3.8 tcm gas 10.4 tcm gas, 2.3 bn bls oil 37 mill t cond. 228 mill tonn cond. 0,5 tcm gas part of the Aker group Slide 13 © 2007 Aker Kvaerner Focus on deepwater floaters in Gulf of Mexico Blind Faith delivered 20 floaters planned 2008-12 S

  8. Slide 8: Develop the emerging gas value chain in Asia Pacific

    Develop the emerging gas value chain in Asia Pacific Floating production systems Receiving terminals and LNG Growing market Large Australian market Breakthrough on Ichtys Concrete “island” technology Illustration of the Ichtys semi part of the Aker group Slide 15 © 2007 Aker Kvaerner TM Just Catch C

  9. Slide 9: Summary

    Summary ■ Field development is delivering several major projects ■ Over the last years, a large part of the revenue has come from a few large projects ■ We will increase our international focus securing continued growth ■ Primary markets will be where we can leverage our know-how, products and techn

Aker Solutions — Investor Day (November 2007) on 6ix