  1. Slide 1: Delivering the Samphire Growth Strategy

    ASX:AGE rsonal use only IMARC - Sydney Alligator Energy Ltd 29 October 2026 Delivering the Samphire Growth Strategy

  2. Slide 2: Disclaimers

    Disclaimers This presentation contains summary information about Alligator Energy Limited (Alligator, AGE or the Company) and its subsidiaries and their activities, current only at the date of this presentation. This presentation is for information purposes only. The information in the presentation

  3. Slide 3: Forward-Looking Statements

    Forward-Looking Statements This presentation contains or may contain certain forward-looking statements and comments about future events, that are based on Alligator’s beliefs, assumptions and expectations and on information currently available to the Board and management as at the date of this pres

  4. Slide 4: Corporate Overview

    Corporate Overview rsonal use only A$0.031 4.83B 318.1M A$25.4M A$149.8M Share Price Ordinary Shares Listed and Cash Market Cap (@ 23 Oct 2026) Unlisted Options (@ 30 Sep 2026) (@ 23 Oct 2026) Shareholders(1) Directors & Executives 1% Retail & HNW 66% (2) Institutions 33% (1) Share register analysis

  5. Slide 5: Board and Management

    Board and Management Over a century of uranium experience across the Board and management team Board and Management Board of Directors rsonal use only Paul Dickson Gregory Hall Fiona Nicholls Daniel Lougher Non-Executive Chairman Non-Executive Director Non-Executive Director Non-Executive Director 3

  6. Slide 6: Samphire Uranium Project: Whyalla, South Australia

    Samphire Uranium Project: Whyalla, South Australia Excellent location decreases risks LOCAL GOVERNMENT: • Whyalla City Council is strongly supportive of the project, given rsonal use only WHYALLA the region’s economic challenges following the blast furnace c. 20 km closure, steelworks administration

  7. Slide 7: Delivering Australia's Next Uranium Mine and Beyond

    Delivering Australia’s Next Uranium Mine and Beyond Pathway to production and growing the business Recent Key Milestones Next Steps Production & Growth rsonal use only • Dec 2023: Scoping Study highlights • Trial results feed into the Feasibility • Targeting production in 2030/2031 robust economics

  8. Slide 8: Samphire: Field Recovery Trial Results

    Samphire: Field Recovery Trial Results Excellent results from the trial, a key derisking event towards commercial ISR production(1) Pattern 1: Pilot Plant • Representative of the orebody targeted for initial development rsonal use only • Results align with or exceed Scoping Study assumptions • Reven

  9. Slide 9: Samphire: Focus on Continual Derisking

    Samphire: Focus on Continual Derisking Bringing hands-on ISR operating experience into feasibility planning rsonal use only • The wellfield is the value driver of an ISR project • Drill spacing is critical: ─ Indicated Resources delineated on 25 m drill-hole spacing ─ This is closer spacing than the

  10. Slide 10: Samphire: Resource Base and Upside

    Samphire: Resource Base and Upside Significant upside to increase the Mineral Resource from multiple areas Current Indicated and Inferred Resources Blackbush Mineral Resource Estimate of 18 Mlb U3O8 supports a start-up mining operation; rsonal use only Plumbush adds an additional Mineral Resource Es

  11. Slide 11: Samphire: Resource Growth

    Samphire: Resource Growth(1) Blackbush-Plumbush Corridor: confirmed channel continuity should increase the Mineral Resource Samphire Growth Strategy: c. 250(2) holes for c. 22,000 m, Jul-Dec 2026 (released status at 7 Oct 2026) Released: just under half To go: drilling continues to Dec 2026 rsonal u

  12. Slide 12: Big Lake Project

    Big Lake Project(1) Potential to unlock a new uranium province WHY IT MATTERS • The Big Lake Project is geologically analogous to large ISR uranium rsonal use only fields associated with hydrocarbon basins, such as those in Kazakhstan • Same host sands as Beverley-Four Mile and Honeymoon • Potential

  13. Slide 13: Upcoming Plans and Milestones

    Upcoming Plans and Milestones Regular news flow and key milestones to first production News flow: CY 2026/early 2027 News flow: 2027 • Big Lake Project drill results final CY 2026 release (33 holes), Nov 2026 • Samphire drill results about quarterly (three planned) after the final 2026 rsonal use on

  14. Slide 14: Investment Highlights

    Investment Highlights Australia’s next uranium producer with multiple near-term catalysts Over a century of uranium experience across the Board and management team, rsonal use only Proven Team including hands-on ISR operating experience that derisks project delivery and execution Binding call option

  15. Slide 15: Appendix 1: Samphire Mineral Resource Summary

    Appendix 1: Samphire Mineral Resource Summary(1) Grade U3O8 metal rsonal use only Tonnage (Mt) (ppm U3O8) (Mlb) Blackbush(2) Indicated 8.2 786 14.2 Inferred 3.9 443 3.8 Plumbush(3) Inferred 14.9 370 12.0 Total 30.0 (1) Mineral Resources as at 30 June 2026, on a 100% basis. Refer also to the Mineral

  16. Slide 16: Appendix 2: Competent Person Statements

    Appendix 2: Competent Person Statements The information in this presentation that relates to Exploration Data, Exploration Results and Exploration Targets for the Samphire Uranium Project near Whyalla, South Australia, and the Big Lake Uranium Project in the Cooper Basin, South Australia, is based o

  17. Slide 17: Appendix 3: Key Risks

    Appendix 3: Key Risks This is a summary of key risks and is not exhaustive. Refer to Material Business Risks in the Commodity prices Directors’ Report of the FY26 Annual Report for a full description. Uranium prices are volatile and outside Alligator’s control. A sustained low price would affect pro