Elia Group SA/NV · EURONEXT:ELI
Elia Group SA/NV — Technical Presentation (September 2019)
23 slides from Elia Group SA/NV's technical presentation, Sep 16, 2019
Slide 1: Explanatory slides accompanying the T&C OPA and T&C SA
Explanatory slides for accompanying the T&C OPA and T&C SA
Slide 2: Federal Grid Code triggers split of roles between OPA and SA
The entry into force of the Federal Grid Code triggered the need to split up the roles and responsabilities between the NEW actors Outage Planning Agent (OPA) and Scheduling Agent (SA) in a regulated contract. These roles and responsabilities are today consolidated in the non-regulated CIPU contract
Slide 3: Overview of Federal Grid Code dispositions for OPA and SA
The following slides give a high level overview of the dispositions of the Federal Grid Code regarding the roles and responsabilities to be taken up by the OPA and the SA.
Slide 4: T&C OPA (1/2)
T&C OPA (1/2) • Article 244 of the Federal Grid Code : • Elia shall determine the Contract for Outage Planning Agent (“OPA Contract”) • submit it for approval six months after entry into force of the Federal Grid Code • Article 377 of the Federal Grid Code • The roles and responsibilities of the OPA
Slide 5: Outage Planning Agent: pragmatic approach for transition period
OUTAGE PLANNING AGENT: pragmatic approach for transition period Step 1 POWER GENERATING MODULE (PGM) or ENERGY DEMAND FACILITIES STORAGE DEVICE (ESD) 25 MW or more 1 – 25 MW • Connected to Elia Simplified Availability Grid directly or information status Mandatory through CDS : exchanges based defa
Slide 6: T&C OPA (2/2)
T&C OPA (2/2) • Article 243 of the Federal Grid code • T&C OPA shall define the type of information exchange that need to be provided regarding the availability plans. • Article 244 of the Federal Grid code T&C OPA shall • define the procedures and timing for providing the exchange information • for
Slide 7: T&C SA (1/2)
T&C SA (1/2) • Article 249 of the Federal Grid Code : • Elia shall determine the Contract for Scheduling Agent ( “SA Contract”) • submit it for approval six months after entry into force of the Federal Grid Code • Article 377 of the Federal Grid Code • The roles and responsibilities of the SA for th
Slide 8: Scheduling Agent: pragmatic approach for transition period
SCHEDULING AGENT: pragmatic approach for transition period Step 1 POWER GENERATING MODULE (PGM) or ENERGY DEMAND FACILITIES STORAGE DEVICE (ESD) 25 MW or more 1 – 25 MW Active power • Connected to schedules in Elia Grid directly day-ahead (DA) or through CDS : and intraday (ID) Mandatory default r
Slide 9: T&C SA (2/2)
T&C SA (2/2) • Article 249 of the Federal Grid Code T&C SA shall • define the type of information exchange that need to be provided regarding scheduling and the offering of upward or downward active power output. • define the procedures and timing for providing the information exchange regarding sch
Slide 10: Overview of historical roles and responsibilities
The following slides give a high level overview of the historical roles and responsabilities and how to move to the allocation of these roles and responsabilities towards the new identified actors.
Slide 11: Historical roles & responsibilities
Historical roles & responsibilities Access Grid User Access Holder Balance Responsible Party CIPU signatory AS provision Availability plans FCR/R1 Scheduling aFRR/R2 Bidding for mFRR/R3 redispatching Mvar Ancillary Non-reserved flexibility Service for balancing Black Start Service Explanatory slides
Slide 12: Current roles & responsibilities
Current roles & responsibilities Access Grid User Access Holder Responsible party Balance (& BRPsource) CIPU signatory AS provision Mvar Black Start BSP AS provision Non-CIPU: FCR/R1 Balancing Service BRPBSP* aFRR/R2 Provider mFRR/R3 AS provision FCR/R1 aFRR/R2 (pilot) mFRR/R3 New Explanatory slides
Slide 13: Future roles & responsibilities (final vision)
Future roles & responsibilities (final vision) Balance Responsible Grid User Access Holder Balance Partysource Balance Service Balance Responsible Provider PartyBSP * FCR/R1 Reserved aFRR/R2 & non- reserved mFRR/R3 Scheduling Agent Scheduling Focus of these T&C SA and T&C OPA Bidding for is not to i
Slide 14: Moving to new Roles (iCAROS)
Moving to new Roles ARP CIPU Large Generation Availability Redispatching Free balancing (TSO- Present Scheduling connected) plans flexibility bids iCAROS T&C Outage T&C T&C BSP Planning Agent Scheduling Agent Generation Availability Redispatching Free balancing TSO/DSO Scheduling Load plans flexibil
Slide 15: New roles of OPA and SA will be taken up by BRP during Transition Period
New roles of OPA and SA will be taken up by BRP during Transition Period
Slide 16: Transition Period (Federal Grid Code – Art. 377)
Transition Period (Federal Grid Code – Art. 377) o The Federal Grid Code foresees a transitory period between the current scheme (BRP and CIPU contract) and the target scheme (independent roles of OPA and SA, and respective T&Cs) o The modalities of the transition , which can be gradual, are set by
Slide 17: Overview of content of the OPA and SA Contracts
The following slides give an overview of the content of the OPA Contract and the SA Contract
Slide 18: Terms & Conditions OPA / SA – Regulated and Non-regulated Contracts
Terms & Conditions OPA / SA – Version 1 Regulated Contracts Non-regulated Contracts T&C OPA T&C SA General Terms and Conditions for Ancillaries and Grid Losses Contract OPA Contract SA General Conditions General Conditions CIPU Contract CIPU Offshore Contract Specific Conditions Specific Conditions
Slide 19: OPA/SA Contracts
OPA/SA Contracts Scheduling Agent Contract Art 244 and 249 of Federal Grid Code specify the minimum set (Federal Grid Code - Art 249 §2) of obligations to be integrated in the OPA and SA Contracts 1. Conditions for technical units and scheduling agents respectively, ensuring compliance with SOGL 2.
Slide 20: Current CIPU Contract
Current CIPU Contract - 6 procedures in a calendar cycle: exchange of information on statuses, technical information, power schedules and bid prices (for redispatching and balancing) - Remuneration/compensation linked to change of statuses for planning and to the requested change of power schedule i
Slide 21: From CIPU to OPA/SA
From CIPU to OPA/SA OPA SA Procedures are kept and exchange of information is splitted in line with Procedure Listed SOGL and Federal Grid Code: Procedure Revision Statuses OPA Contract comprises all and statuses that impact availability Procedure Stand-by Technical plans, together with technical
Slide 22: Transposition of CIPU Contract in OPA / SA Contracts
Transposition of CIPU Contract in OPA / SA Contracts Titles OPA/SA Articles OPA Contract Articles SA Contract Current CIPU Contract DEFINITIONS Definitions Definitions CONDITIONS FOR Conditions for OPA Conditions for SA PARTICIPATION Conditions for Technical Units Conditions for Technical Units PROC
Slide 23: Summary of submitted T&C OPA and T&C SA
Summary of submitted T&C OPA (including OPA Contract) and T&C SA (including SA Contract) - Regulation of planning, scheduling and redispatching : transposition of current non- regulated CIPU Contract to regulated OPA and SA - Use of new SOGL terminology - Fusion of CIPU and CIPU Offshore in the resp