Glencore Plc · LSE:GLEN

Glencore — Investor Day (December 2014)

51 slides from Glencore's investor day presentation, Dec 10, 2014

  1. Slide 1: Investor Day

    Ernest Henry copper concentrator, Australia Investor Day 10 December 2014 08:00 - Welcome and Overview | Ivan Glasenberg 08:20 - Finance Update | Steven Kalmin 08:45 - Copper Copper||Telis TelisMistakidis Mistakidis 09:15 - Coal | Tor Peterson & Peter Freyberg 09:45 - Break 10:05 - Zinc | Daniel Mat

  2. Slide 2: Forward looking statements

    Forward looking statements This document contains statements that are, or may be deemed to be, “forward looking statements” which are prospective in nature. These forward looking statements may be identified by the use of forward looking terminology, or the negative thereof such as "plans", "expects

  3. Slide 3: Copper

    Alumbrera copper concentrator, Argentina Copper Telis Mistakidis

  4. Slide 4: Topics

    Topics 1. Glencore Copper Department • Overview • Description 2. Katanga Mining • Production issues • Power 3. Antapaccay • Tintaya concentrator restart • Antapaccay mini expansion 4. Copper Market – where is the surplus? 4

  5. Slide 5: Glencore copper in context

    Glencore copper in context • Third largest global mined copper producer and the world’s largest copper supplier • Integrated assets (mines, smelters and refineries) and marketing 2013 copper production (kt) 3,000 2,500 2,000 1,500 1,000 500 0 Competitor 1 Competitor 2 Glencore Competitor 3 Competito

  6. Slide 6: Glencore copper assets

    Glencore copper assets Mined Cu Smelter/Refinery N America 90k MT Horne/CCR 300k MT Asia 60k MT Kazzinc 70k MT S America 660k MT Africa 500k MT Australia 260k MT Altonorte 300k MT Mopani 200k MT Isa/Pasar 600k MT 6

  7. Slide 7: Capability across the copper raw materials chain

    Capability across the copper raw materials chain • Integrated industrial assets and marketing • One million MT custom smelting and refining • Capability to process complex concentrates with precious metals and deleterious elements. Cobar Mt Isa Antapaccay Nkana Katanga EHM Antamina Mufulira Mutanda

  8. Slide 8: Mined production growth

    Mined production growth Own source mined copper production (kt) Merger 2008 2009 2010 2011 2012 2013 2014F 2015F 2016F 2017F 2018F Total copper Former Xstrata Note: does not include copper from Kidd, Kazzinc and Ni operations 8

  9. Slide 9: Mined production growth by region

    Mined production growth by region Own source mined copper production (kt) 1,800 1,600 1,400 1,200 1,000 800 600 400 200 0 2012A 2013A 2014F 2015F 2016F 2017F African Copper Collahuasi Antamina Other South America Australia By-product Source: Glencore 9

  10. Slide 10: Katanga 2014 production issues

    Katanga 2014 production issues 220 210 16 210 200 16 Cu Cathode (‘000) 190 180 2 8 170 2 165F 160 150 140 130 120 Cu prodution Power direct Power (indirect) Electrical Projects delays Reduced Cu production budget & Mechanical sulphide / ASCu actual 10

  11. Slide 11: Standby generators deployment

    Standby generators deployment Generating Capacity UNITS MW KTC 4 2 2 2 KTO 1 2 1 1 1 1 Luilu 1 2 KOV (Convert to Co-Gen) 4 7 Sub – Total 17 Co-Gen 1 (New at Luilu:leach,CCDs) Now Generator farm (6.6 and 15kV) 6 10 Sub - Total 27 Co-Gen 2 (New at Luilu:EW2/3) April Generator farm (33kV) 6 10 Total 37

  12. Slide 12: Global Power Project – update

    Global Power Project – update Description • 450MW for Kamoto Copper Company and partners • 350MW of new power and 1000MW transmission from INGA to Kolwezi • Project cost – $368M, Lots 1 to 14 • Reimbursed via 40% credit to power bills • Additional 10% withheld for maintenance fund • 75MW available t

  13. Slide 13: Global Power Project – timeline

    Global Power Project – timeline 2013 2014 2015 2016 2017 Q1 Q2 Q3 Q4 Q1 Q2 Q3 Q4 Q1 Q2 Q3 Q4 Q1 Q2 Q3 Q4 Q1 Q2 Lot 3 Unit 3 - Nzilo Quick Fix Lot 4 Unit G27 Inga refurbishment Lot 5 Unit G28 Inga refurbishment Lot 6 Convertor transformer DC Link Pole 1 Lot 7 Convertor transformer DC Link Pole 2 Lot

  14. Slide 14: Katanga ramp-up drives future production growth

    Katanga ramp-up drives future production growth Copper cathode production (kt); Capex $M 350 3,500 300 3,000 250 2,500 200 2,000 Cu k Tonnes 150 1,500 100 1,000 50 500 165 242 274 286 301 42 52 58 61 87 22 0 0 2008 2009 2010 2011 2012 2013 2014F 2015F 2016F 2017F 2018F Cu Cathode Production CAPEX So

  15. Slide 15: Katanga ramp-up drives future production growth

    Katanga ramp-up drives future production growth Copper cathode production (kt); Capex $M 350 3,500 300 3,000 250 2,500 200 2,000 Cu k Tonnes 150 1,500 100 1,000 50 500 165 242 274 286 301 42 52 58 61 87 22 0 0 2008 2009 2010 2011 2012 2013 2014F 2015F 2016F 2017F 2018F Cu Cathode Production CAPEX So

  16. Slide 16: New CM5 SAG Mill installed and commissioned

    New CM5 SAG Mill installed and commissioned 16

  17. Slide 17: New oxide floatation cells installed and commissioned

    New oxide floatation cells installed and commissioned 17

  18. Slide 18: New concentrate roaster commissioned

    New concentrate roaster commissioned 18

  19. Slide 19: Solvent Extraction commissioned

    Solvent Extraction commissioned 19

  20. Slide 20: 200ktpa EW2 in production

    200ktpa EW2 in production 20

  21. Slide 21: First cathodes harvested from 80ktpa EW3 expansion

    First cathodes harvested from 80ktpa EW3 expansion 21

  22. Slide 22: Antapaccay – Tintaya Concentrator Restart

    Antapaccay – Tintaya Concentrator Restart Tintaya restart • Existing Tintaya concentrator to process 20 ktpd of ore from Antapaccay mine • Startup in May 2015 • 34kt per year Cu in concs for LOM avg. 43kt per year Cu in concs for the first 5 years • Capex of $64M: • Mining: $25M • Concentrator: $27M

  23. Slide 23: Antapaccay – Incremental Plant Expansion

    Antapaccay – Incremental Plant Expansion Expansion of Antapaccay plant: • Process 82 ktpd of ore from Antapaccay mine using existing infrastructure in 2016 • capacity incrementally increased; 70 ktpd (design) to 77 ktpd (current) and now 82 ktpd • total Cu in concs >200ktpa (inc Tintaya) • 9kt per y

  24. Slide 24: Tier 1 asset portfolio and cost structure

    Tier 1 asset portfolio and cost structure Illustrative Copper C1 cash cost curve Q1 First quartile cost position achieved for 2013A asset portfolio in 2014 $1.65/lb 2016F $1.36/lb c.$300M industrial merger synergies and other cost savings by end 2014 Unit mine costs drop through brownfield expansion

  25. Slide 25: Copper market

    Altonorte anodes, Antofagasta Port, Chile Copper market

  26. Slide 26: Global Exchange stocks are at lowest levels since 2008

    1,000,000 0 100,000 200,000 300,000 400,000 500,000 600,000 700,000 800,000 900,000 Jul-08 Sep-08 Nov-08 Source: Bloomberg, Reuters Jan-09 Mar-09 May-09 Jul-09 Sep-09 Nov-09 Jan-10 Mar-10 May-10 Jul-10 Sep-10 Nov-10 LME Jan-11 Mar-11 May-11 SHFE Jul-11 Sep-11 Nov-11 COMEX Jan-12 Mar-12 May-12 Jul-12

  27. Slide 27: Global copper warehouse stocks are reducing further

    Global copper warehouse stocks are reducing further Global warehouse copper stocks (kt Cu) 1,800 1,600 1,400 1,200 722k 1,000 245k 800 600 400 200 0 Jan 2013 Jun 2013 Jan 2014 Jun 2014 Dec 2014 LME COMEX SHFE CHINA BONDED Source: Bloomberg, Reuters, Glencore estimates 27

  28. Slide 28: Chinese Copper scrap imports are falling

    Chinese Copper scrap imports are falling Chinese copper scrap net imports (kt contained Cu) 3,000 2,500 2,000 13% yoy 19% yoy 1,500 1,000 500 0 2006 2007 2008 2009 2010 2011 2012 2013 2014 Source: China customs data 28

  29. Slide 29: Chinese imports and apparent consumption

    Chinese imports and apparent consumption 2013 vs 2013 Jan-2014 Jan- 2011 2012 2013 YoY Chg 2014E YoY Chg 2012 Oct Oct Copper Cathode Imports 2'825 3'396 3'198 (5.8%) 2'557 2'948 15.3% 3'538 10.6% Exports 156 274 293 7.1% 246 220 (10.7%) 264 (10.0%) Net Imports 2'669 3'122 2'905 (7.0%) 2'311 2'728 18

  30. Slide 30: Demand vs Supply per ICSG and Wood Mackenzie

    Demand vs Supply per ICSG and Wood Mackenzie Copper Demand/Supply balance estimates 2014 2015 ICSG Apr ‘14 Estimate ~400 kt ~600 kt Surplus surplus surplus now 90k MT? ICSG Oct ‘14 Estimate ~300 kt ~390 kt deficit surplus Minus: Kennecott 100k (Δ 700 kt lower) (Δ 210 kt lower) Escondida 150k Alumbre

  31. Slide 31: Latest 2015 supply forecasts may still be very optimistic

    Latest 2015 supply forecasts may still be very optimistic +200kt? • DRC running at 950kt in 2014. To go to just over 1 mt in 2015 +320kt? • Production double counted Frontier at Mopani. 2014 production is 720 kt; • Production and commissioning issues. 2015 to be 850 kt +350kt? • Indonesian concentra

  32. Slide 32: 2015 copper supply forecast keeps changing

    2015 copper supply forecast keeps changing • Brookhunt and ICSG give 390 kt surplus guidance • Taking the previous slide, deduct 1.8 Mt = Deficit of 1.4 - 1.6 Mt for 2015? • Consumption - the world is emerging from the biggest recession in 100 years 25,000 2015 supply forecast as estimated in each p

  33. Slide 33: Thank you

    Thank you 33

  34. Slide 34: Appendix: Copper asset update

    Kantanga Phase V, EW3 under commissioning, DRC Appendix: Copper asset update

  35. Slide 35: Katanga expansion nearing completion

    Katanga expansion nearing completion

  36. Slide 36: New KOV pit crusher completed

    New KOV pit crusher completed 36

  37. Slide 37: Installation of new concentrate stockpile shed

    Installation of new concentrate stockpile shed 37

  38. Slide 38: Heap leach extension complete

    Heap leach extension complete 38

  39. Slide 39: DRC power project

    Refurbishment of Inga Unit G27, DRC DRC power project 39

  40. Slide 40: Mopani – synclinorium and deeps project update

    New acid plant, Mufilira smelter, Zambia Mopani – synclinorium and deeps project update

  41. Slide 41: Synclinorium – Project Site

    Synclinorium – Project Site 41

  42. Slide 42: Synclinorium – New Winder Main Shaft

    Synclinorium – New Winder Main Shaft 42

  43. Slide 43: Synclinorium – New Winder

    Synclinorium – New Winder 43

  44. Slide 44: Synclinorium – New Winder House

    Synclinorium – New Winder House 44

  45. Slide 45: Synclinorium – Sub Station

    Synclinorium – Sub Station 45

  46. Slide 46: Synclinorium – New Generator Building

    Synclinorium – New Generator Building 46

  47. Slide 47: Synclinorium – Loading Station – 1231m level

    Synclinorium – Loading Station – 1231m level 47

  48. Slide 48: Synclinorium – Loading Station – 1231m Level

    Synclinorium – Loading Station – 1231m Level 48

  49. Slide 49: Synclinorium – Ventilation Shaft

    Synclinorium – Ventilation Shaft 49

  50. Slide 50: Mufulira Deeps – Raise Bore – 500m Lift

    Mufulira Deeps – Raise Bore – 500m Lift 50

  51. Slide 51: Mindola Deeps – 4960L

    Mindola Deeps – 4960L 51

Glencore — Investor Day (December 2014) on 6ix