  1. Slide 1: Tilt Renewables Infratil Investor Day

    Tilt Renewables Infratil Investor Day 10 April 2019

  2. Slide 2: Agenda

    AGENDA • 12 month highlights • Delivering the strategy • Current company position • Look to the future

  3. Slide 3: Overall Highlights for FY2019

    Overall Highlights for FY2019 Operational Shareholder Pipeline Performance Value Growth Enhancement • Fleet availability 96.7% (11 • Salt Creek 54MW delivered • Liverpool up to 1GW months) (A$100M) • Waverley now 130MW • Full year production >2TWh • Dundonnell 336MW in • Consented solar at 660MW • T

  4. Slide 4: Operational Highlights for FY2019

    Operational Highlights for FY2019 TLT portfolio production (TWh) 2.5 Actual FY17 Actual FY18 Actual FY19 Soft Q4 wind brings full year production back to “P50” 2.0 • 9 months production to 31 December 2018 was 1.6 TWh 1.5 • Soft March quarter wind conditions in AU and NZ 1.0 0.5 • Full year producti

  5. Slide 5: Strategy Execution – Setting Up Our Future

    Strategy Execution – Setting Up Our Future • Salt Creek delivered, on time and budget Revenue Contract Mix (incl. Dundonnell) • Dundonnell contracted at 87% - maintains room 4,000 Portfolio generation GWh per annum Existing Contracts for further merchant exposure in portfolio New DDWF contracts Unco

  6. Slide 6: Operational and Development Projects - Geographical View

    Operational and Development Projects - Geographical View 636 MW operational across 322 turbines → 973 MW with Dundonnell across 402 turbines 0.7GW pipe in QLD 1.3GW pipe in NSW 06

  7. Slide 7: Summarised Company Update – At Demerger vs Today

    Summarised Company Update – At Demerger vs Today Demerger (October 2016) Today (April 2019) 2.5 years 2,800 A$660M new 4,400 MW investment MW committed Renewables capacity MW Demerger Today Key progress (October 2016) (April 2019) Operational 582 636 2,300MW+ Salt Creek WF delivered Construction - 3

  8. Slide 8: The Future for TLT?

    Ui renewables The Future for TLT? | || ; /

  9. Slide 9: Operational Outlook for FY2020

    Operational Outlook for FY2020 Area Relative to FY19 FY2020 earnings reflects portfolio before Dundonnell  P50 assumed, Salt Creek full year Production • Full 12 months of Salt Creek under Meridian PPA offset by some SA curtailment • P50 portfolio production circa 2 TWh  in line, full year Salt Cr

  10. Slide 10: Long-term Fundamentals for Australian Renewables Remain Encouraging

    Long-term Fundamentals for Australian Renewables Remain Encouraging • Decarbonisation of Australia’s electricity market will continue over the next 20 – 30 years, as coal fired power stations reach ‘end of life’ and are replaced by lower cost renewables • Private sector investment in new coal-fired

  11. Slide 11: Energy Transition Underway in Australia

    Energy Transition Underway in Australia ~35 GW ‘Grid Relative change in NEM capacity mix Scale’ Renewables Opportunity 011 Source: AEMO Integrated System Plan – Generation mix forecasts – neutral case

  12. Slide 12: Energy Mix Change Depends on the State

    Energy Mix Change Depends on the State Key Points • Overall growth in demand • Move away from coal • Utility storage plays a role, especially in heavy solar penetration areas • Transmission system must adapt Generation Mix Black coal Brown Coal Gas/Liquid/Biomass Hydro Wind Utility solar DER (roofto

  13. Slide 13: Australian Market - Short Term Pain is Real

    Australian Market - Short Term Pain is Real Policy Technical Commercial Energy & Climate will be Traditional PPA market is fairly Transmission system a huge stagnant, tenors tightening Federal election issues constraint (connection, losses and curtailment) Government CfDs are likely COP21 reductions

  14. Slide 14: Strategic Considerations Australian Market

    Appropriate scale in 1 – 5 Strategic Considerations Access to years? Short term capability headwinds Australian Market gaps (build or due to grid buy) and politics Patience is required Technology Sources of flexibility debt and (solar, wind, equity (cost storage) and flexibility) LCOE focus – Pipeli

  15. Slide 15: Strategic Considerations New Zealand Market

    Market activity is increasing as supply tightens Strategic Considerations Operation of TLT is the only older assets on credible New Zealand Market tough sites is a independent key skill developer in NZ Opportunity will knock Growing our pipeline of Government quality options– . ambitions may TLT can

  16. Slide 16: Summary

    Summary • Strategy of securing a range of development options and delivering into opportunities, is being successfully executed • Immediate focus is on Dundonnell delivery, the performance of the operational business and the next growth options • Core Australia investment thesis remains valid • New

  17. Slide 17: Thank you

    Vim rovewablos Thank you

  18. Slide 18: Disclaimer

    Disclaimer This presentation is issued by Tilt Renewables Limited. While all reasonable care has been taken in the preparation of this presentation, Tilt Renewables Limited and its related entities, directors, officers and employees (collectively “Tilt Renewables”) do not accept, and expressly discl